• Title/Summary/Keyword: timber harvest scheduling

Search Result 3, Processing Time 0.022 seconds

Forest Management Planning by Linear Programming - Timber Harvest Scheduling of a Korean Pine stand - (Linear Programming에 의한 삼림경영계획(森林經營計劃) - 잣나무임분(林分)의 삼림수확계획(森林收穫計劃)을 중심으로 -)

  • Woo, Jong Choon
    • Journal of Korean Society of Forest Science
    • /
    • v.80 no.4
    • /
    • pp.427-435
    • /
    • 1991
  • Linear programming(LP) is a well-known method in optimizing timber harvest schedules. This paper describes a linear programming formulation of korean pine stands for timber harvest scheduling problems. Simulation technique and LP were applied to optimize the time and space distribution of the sustained yield for the 10-year forest management planning horizon. Growthfunction of korean pine stands in study area was derived with the yield table. This growthfunction was contained to the simulation model in estimating of changing stand volume conditions for the planning horizon. These estimated values were served as the basic data of LP model, and LP model was formulated with the maximum of periodical harvest volume calculated by the classical yield regulation method (Paulsen-Hundeshagen formula) and the maximum of periodical harvest area calculated for the normal age distribution. The timber harvest schedule was established periodically for each subcompartment of korean pine stands in experiment forest of College of Forestry in Kangweon National University with the here developed LP model.

  • PDF

An study on selecting the restricted area of timber harvesting using Geographic Information Systems (GIS를 이용한 대채제한지(代採制限地) 선정(選定)에 관한 연구(硏究))

  • Woo, Jong-Choon;Choi, Jo-Ryong;Won, Hyun-kyu
    • Journal of Forest and Environmental Science
    • /
    • v.16 no.1
    • /
    • pp.119-123
    • /
    • 2000
  • This paper studies the methods to support decision making for forest management Using GIS. Specially, most important is selecting restrict area to timber harvest suitable on scheduling its harvest in experimental forest of kangwon national university. Because timber harvesting causes water pollution, land sliding and soil erosion, it is necessary to restrict area to be harvest. The study is analyzed with Buffering modules and overlay modules which are an function of Arcinfo 7.1. As a result, restricted area is 52.64ha in total area. Of which Hardwood stand 13.21ha, pinus Pinus koraiensis stand 26.44ha, Larix leptolepis stand 12.38ha and Pinus rigida stand 0.61ha.

  • PDF

A Study on Developing An Experimental Model to Solve for Optimal Forest-Level Timber Harvesting Schedules Using Linear Programming (대단지(大團地) 산림(山林)의 목재생산계획(木材生産計劃) 분석(分析)을 위한 선형계획(線型計劃) 실험전산모델에 관한 연구(硏究))

  • Chung, Joo Sang;Park, Eun Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.82 no.3
    • /
    • pp.292-304
    • /
    • 1993
  • This research developed a forest-level harvest scheduling model using linear programming (LP). The formulations of the LP model include timber production schemes with constraints of nondecling yield forest conversion strategies, the minimum timber supply, levels and the maximum cut acrages. The model is able to generate both Model I and Model II types of input matrix in MPS format. In this paper, use of LP in building the framework of the strategic forest planning model was justified by comparing the algorithmic characteristics of LP with those of Gentan probability and binary search approaches through literature reviews. In order to demonstrate the field applicability of the model proposed. (1) the harvest scheduling problem for about 11,000-hectare case study area (Mt. Baekun area in Southern Experimental Forest of Seoul National University) was formulated and soloed and (2) the effects of the change in task regulatory timber production constraints or. optimal harvesting schedules here investigated.

  • PDF