• 제목/요약/키워드: thermal power plant

검색결과 1,091건 처리시간 0.033초

화력발전소 보일러 급수제어 계통의 모델링과 L.Q. 제어기 적용에 관한 연구 (A Study of Thermal Power Plant Feedwater System with Modeling and L.Q.Controller)

  • 서진헌;황재호
    • 대한전기학회논문지
    • /
    • 제39권12호
    • /
    • pp.1281-1287
    • /
    • 1990
  • A new thermal power plant feed-water system model, which is based on Astrom, is presented. Astrom's model has some difficulties in applying to practical systems because it is not able to measure the heat and energy transfer loss. Hence, in order to make up for these difficulties, the Gas State Equation is added to the model. Computer simulations are performed to show the validity of the new model at thermal power plant with practical boiler operating data and to verify the L.Q. controller effect on boiler drum level system.

화력발전소 관류보일러의 과열기 온도제어에 관한 연구 (A Study of Superheater Temperature Control on an Once Through Boiler in Thermal Power Plant)

  • 이주현;정태원
    • 전기학회논문지
    • /
    • 제58권10호
    • /
    • pp.2022-2027
    • /
    • 2009
  • An supercritical once through boiler system has been used in the korea standard-type thermal power plant. It is critical in boiler operation that superheater temperature should be controlled within the specified limit. In this paper, control logic scheme is suggested for superheater temperature in once through boiler. Finally the simulation result using process model based simulator shows the validity of suggested control logic.

350MW급 화력 발전소 증기터빈의 오일 휩 현상 및 대책 (Oil Whip Phenomena and Countermeasure on Steam Turbine in 350MW Load Thermal Power Plant)

  • 구재량;김연환;배용채;김계연
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 II
    • /
    • pp.1015-1019
    • /
    • 2001
  • There are several bearing systems at the large steam-turbines in thermal power plant. The bearing system is one of the most important parts of rotating machinery. The steam turbine vibrations mainly depend on the bearing oil and the shaft alignment condition. This paper describes on the steam turbine abnormal vibration due to the oil whip in terms of the shaft alignment in the thermal power plant.

  • PDF

화력발전소에서 응축수 회수계통의 증기배관 개선에 의한 발전시스템의 효율 향상 (The improvement of the efficiency of power plant by the reformation of steam line in the return system)

  • 권영수;서정세
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.867-871
    • /
    • 2001
  • The main reason for reviewing the condensate water return system in the auxiliary steam system is to obtain the thermal high efficiency of the power plant and thus save the fossil energy in power plant. This study intends to analyze the thermal efficiency of the power plant and predict the increasing in the generator output by the return system reformation of auxiliary steam line in the thermal power plant.

  • PDF

화력발전소 제어시스템 신뢰도 향상을 위한 전자카드 운영 방법 연구 (Research on the Maintenance Method to Improve the Reliability of Control System in Thermal Power Plant)

  • 신영진;박두용;김호열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.240-242
    • /
    • 2006
  • The inspection method, which is used to inspect the electronic system for the control system of the fossil-powered thermal power plant, has the technical restrictions based on its primary application area, whereas the reliability is requested more and more by the plant operators to minimize the shutdown of a plant. This paper reviews the inspection methods currently used by the thermal power plant and how to adopt the condition based maintenance to increase the availability of power plant.

  • PDF

화력발전소 시운전시 인근에 미치는 소음영향 및 대책 (Evaluation and countermeasure for Environmental Noise during Plant Commissioning Process in Thermal Power Plant)

  • 김연환;구재량;김희수;배용채;이현
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 II
    • /
    • pp.897-902
    • /
    • 2001
  • This paper describes the evaluation of noise influence for residental and boundary areas in 75MW thermal power plant. It includes the measurements of noise level around the boundary area of the plant, identification of noise propagating path, and discussion on the measures. Noise assessments are carried out based on the ISO 3744, ISO 9613-1 and ISO 9613-2 to predict the noise distribution of specific locations from the noise sources such as power transformers, flash vent-pipe, I.D.fan, and stack. It is identified the vent-pipe of flash tank in thermal power plant as the root cause of the environmental noise during the plant commissioning process.

  • PDF

증기발생기 파울링과 전기출력의 상관성 고찰 (A Study on the Relationship between Steam Generator Fouling and the Electric Power)

  • 조남철;신동만;김용식
    • 한국압력기기공학회 논문집
    • /
    • 제13권2호
    • /
    • pp.31-37
    • /
    • 2017
  • The heat transfer function or thermal performance is the most important function of the steam generator component in nuclear power plants. The declining of thermal performance, fouling does not affect the electric power of the nuclear power plant within a certain fouling level, but it affects the output when goes beyond the governor valve wide open of the turbine. The VWO steam pressure can be predicted through the thermal performance evaluation of steam generators in the nuclear power plant. In consideration of the fouling characteristics of the steam generator, methods of the thermal performance evaluation and fouling cases are reviewed, and also the critical VWO value is estimated through the actual thermal performance evaluation. It is necessary to apply the VWO theory based on the thermal performance of the steam generators.

태양열발전 제어시스템 (A Control System for Solar Thermal Power Plant)

  • 박영칠
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.693-697
    • /
    • 2007
  • A control system for solar thermal power plant is the control system to coordinate the whole system's operation, including management of distributed control systems, process control for optimal operation of total system, monitoring system operating conditions and doing administrative functions. This work, as a progress report, presents the results obtained so far in building a control system for the 1MW solar thermal power plant. To make the control system, we first defined the control system's hierarchy and classified the role of each layer. Then, as the first stage of making control system, we designed and developed the sun tracking control system for heliostat.

  • PDF

화력발전소에서 과열저감기의 증기온도제어 (Steam Temperature Control of Attemperator in Thermal Power Plant)

  • 신휘범
    • 조명전기설비학회논문지
    • /
    • 제25권7호
    • /
    • pp.40-48
    • /
    • 2011
  • An attemperator is a part of the 4-stage superheater in the boiler system of the thermal power plant. The attemperator receives the over-heated steam and makes the steam with proper temperature by adjusting the control valve of the cold steam. In this paper, the attemperator is modeled considering physical point of view and the linearized model is derived for the control purpose. To overcome the integral windup phenomenon due to the opening limitation of the control valve, an anti-windup PI controller is proposed to the attemperator and compared with the PI controller operated in the thermal power plant in view of control performance.

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권2호
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.