• Title/Summary/Keyword: the w-operation

Search Result 2,469, Processing Time 0.031 seconds

Development of Automatic Train Operation System H/W for KOREA Standard EMU (표준전동차용 열차자동운전장치 (ATO) H/W 개발)

  • Lee, Su-Gil;Han, Seong-Ho;Ahn, Tae-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1457-1459
    • /
    • 2000
  • The ATO(Automatic Train Operation System) system is equipment for automatic and driverless operation of electric train with minimum control of operator. In this paper, we made ATO system with national technic and passed type test. We are convinced of reliability and safety of the ATO system on the seoul metro 7 line.

  • PDF

A study on the certification requirements and operation system for the Airship that flies through the stratosphere (고공비행선 인증 및 운항체계에 대한 연구)

  • Choi, H.S.;Shin, D.W.;Lee, J.H.;Choi, J.W.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.9 no.2
    • /
    • pp.77-89
    • /
    • 2001
  • Recently, the development of an airship that flies through the stratosphere was undertaken in Korea by Korea Aerospace Research Institute like other countries. With the consideration of new operation concept, it is on the rise that the current certification requirements and operation system is not sufficient to secure safety and reliability. This study was performed to establish the certification requirements and operation system. The amendment of airworthiness standards was reviewed by each articles, and the new procedures, as a level of national regulations, for operation was proposed. The results gained through this study can be utilized effectively in the development and operation of subjected airship.

  • PDF

Fabrication of a AlGaAs high power (~20W) laser diode array (20W급 AlGaAs 레이저 다이오드 어레이의 제작)

  • 박병훈;손낙진;배정훈;권오대
    • Journal of the Korean Institute of Telematics and Electronics D
    • /
    • v.34D no.11
    • /
    • pp.20-24
    • /
    • 1997
  • We have successfully fabricated high power (~20W) laser diode array, which are useful for pumping Nd:YAG lasers. The laser diode aray has 20 100.mu.m-wide cahnnels of which space was adjusted to 350.mu.m to improve thermal characteristics. And channel width is 100.mu.m. For an uncoated LD array, the output power of 15.66W has been obtained at 41A under quasi-CW operation, which results in about 0.42W/A slope efficiency. After aR(5%) and HR (95%) coatings on both facets, the output power was improved up to 21.18W at 40A under the same operation as above and the slope efficiency was 0.795W/A. On the other hand, by using a near field measurement system consisting of objective lens, eyepiece, CCD camera and image processing board, the typical near field patten of 1*20 LD array was observed.

  • PDF

Development of TPF Generation SIW for KOMPSAT-2 X-Band Antenna Motion Control

  • Kang C. H.;Park D. J.;Seo S. B.;Koo I. H.;Ahn S. I.;Kim E. K.
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.485-488
    • /
    • 2005
  • The 2nd KOrea Multi-Purpose Satellite (KOMPSAT -2) has been developed by Korea Aerospace Research Institute (KARI) since 2000. Multi Spectral Camera (MSC) is the payload for KOMPSAT -2, which will provide the observation imagery around Korean peninsula with high resolution. KOMPSAT-2 has adopted X-band Tracking System (XTS) for transmitting earth observation data to ground station. For this, data which describes and controls the pre-defined motion of each on-board X-Band antenna in XTS, must be transmitted to the spacecraft as S-Band command and it is called as Tracking Parameter Files (TPF). In this paper, the result of the development of TPF Generation S/W for KOMPSAT-2 X-Band Antenna Motion Control.

  • PDF

A Study on the Wiring Control Method of Hand & Auto Operation of an Easy Elevator (간이 승강기 수·자동 배선제어방식에 관한 연구)

  • 위성동;구할본
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.16 no.4
    • /
    • pp.351-357
    • /
    • 2003
  • An easy learning elevator originated is opened to compare the existed teaming equipment, and it had a high studied efficiency that the sequence control circuit can open and close with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demostrated by the constructive apparatus with the lamps to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward reverse breaker and the motor of load, and the mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connect each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequently the cage could go and come till 1∼5 steps with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of L/S1 ∼ L/S5 let posit with the control switchs of S/W1 ∼ S/W5 of PLC testing panel and switchs of S/W1 ∼ S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is the hand-auto operation combined learning equipment to study the principle and technique of the originate sequence control circuit and the auto program of PLC.

The Operating Results of the 75kW MCFC Stack (75kW 용융탄산염 연로전지[MCFC] 스택 운전 결과)

  • Kang, Seung-Won;Kim, Beom-Joo;Kim, Do-Hyeong;Lee, Jung-Hyun;Kim, Eui-Hwan;Lim, Hee-Chun
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.20 no.3
    • /
    • pp.202-207
    • /
    • 2009
  • A 75kW MCFC stack with the reactive area of 9,600cm$^2$ has been operated and validated in Boryeong thermal power plant. The 75kW MCFC stack was installed at the end of November 28, 2008 and started initial operation on December 23, 2008 after pretreated for about 20 days. At initial load operation, the stack showed the Open Circuit Voltage of 137V, which approaches the theoretical value. At the early stage of rated power operation, the stack displayed the voltage of 104V at the current of 754A and reached the maximum generating power of 78.5kW DC. This stack has been operated for 2,890 hours until April, 2009. In addition, the operation time of rated power records 1890 hours. This Operating result is scheduled to be reflected the design of l25kW stack.

Application Management System with ZeroMQ and Alarms in Distribution Management System (배전운영 시스템에서의 ZeroMQ와 알람 정보를 이용한 운영기능 관리 시스템)

  • Kim, Pil-Seok;Kang, Ho-Young;Lim, Il-Hyung;Park, Jong-Ho;Shin, Yong-Hak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.8
    • /
    • pp.1161-1167
    • /
    • 2015
  • Distribution Management System(DMS) ienhancing distribution automation system-based operation efficiency is an optimized system by various operational applications in a distribution network. DMS employs various applications like topology reconfiguration, volt/var control, and restoration at events such as overload, voltage violation, and a fault in a distribution system. An operation efficiency to employ multi-applications as restoration with short-term load forecasting is higher than a performance by a single application; and the applications are accomplished by an operator’s control. Applications’ combination is determined by various alarm information which means critical issues in order to operate a distribution system. Thus, this paper proposes an application management system which can configure application combination, control applications depending on alarm information and check their performance condition. The proposed application management system can be customized by operator easily and have high operation efficiency and reliability because it is worked by reviewed alarm information from operator.

Stuides on the Cutting Methods of the Self-feeding Type Combine -on the Mixed Cutting Method (1)-on the Mixed Cutting Method(I) (자탈형 콤바인의 예취작업법에 관한 연구 -혼합예취법을 중심으로 (제1보)-)

  • 최복연
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.2
    • /
    • pp.4096-4104
    • /
    • 1976
  • This experiment was carried out to investigate the efficient turning method which will be able to use every cutting methods, to calculate the width of the center field which must transpose from rotary cutting method to return cutting method, to investigate the effects of L/W and unit field on the operation efficiency. The results are summarized as follows: 1. In case of cutting in the outer field, the efficient turning method is the "$\alpha$" type turning method (half U-shaped turning method) at the first rotation, is the "$\beta$" type turning method (T-shaped turning method) at the second to fourth rotation. 2. In case of cutting in the inner field, the efficient turning method which takes the least turning time is the "a" type turning method ($\Delta$-shaped turning method). 3. The width of the center field (W') changes by the length-width ratio (L/W) and width (W), W' is 9.0m in case that L/W is 2.5 and W is 30m. 4. The larger L/W and area of unit field (A) become, the more operation efficiency (E) increases, and the limits that E is affected signicantly by L/W is 2 to 3.5 and A is within 5,000$m^2$. within 5,000$m^2$.

  • PDF

System Development of a 100 kW Molten Carbonate Fuel Cell IV(System commisioning for operation (100 kW급 용융탄산염 연료전지 시스템 개발 IV(MCFC 시스템 시운전))

  • Lim, Hee-Chun;Ahn, Kyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1681-1683
    • /
    • 2005
  • The molten carbonate fuel tell(MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO(KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre-commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode, $CO_2$ recycle, and externally reforming power generation system. The 100 kW MCFC system consisted with stacks which was made by two 50 kW sub-stacks, 90 cells with 6,000 cm2 active area and BOP including a reformer, a recycle blower, a catalytic burner, an inverter, and etc. The system will be operated under 3 atm pressure condition and expected to last over 5,000 hours by the end of this year.

  • PDF

A HALF-CENTERED STAR-OPERATION ON AN INTEGRAL DOMAIN

  • Qiao, Lei;Wang, Fanggui
    • Journal of the Korean Mathematical Society
    • /
    • v.54 no.1
    • /
    • pp.35-57
    • /
    • 2017
  • In this paper, we study the natural star-operation defined by the set of associated primes of principal ideals of an integral domain, which is called the g-operation. We are mainly concerned with the ideal-theoretic properties of this star-operation. In particular, we investigate DG-domains (i.e., integral domains in which each ideal is a g-ideal), which form a proper subclass of the DW-domains. In order to provide some original examples, we examine the transfer of the DG-property to pullbacks. As an application of the g-operation, it is shown that w-divisorial Mori domains can be seen as a Gorenstein analogue of Krull domains.