A Study on the Temporary Storage Facility for Mitigating the Leakage Accident (누출 사고 완화를 위한 임시 저장 시설에 관한 연구)

  • Song, Hyeon Oh;Lee, Chang Jun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.1-5
    • /
    • 2020
  • The leakage accident from a storage tank in an oil refinery plant occurred in April 2014 and the total loss is KRW 18 billion. This accident has prompted many companies to develop their own mitigation system to minimize the loss of the leakage accident. The aim of this study is to design the temporary storage facility system for dealing with leakage accidents. The basic concept of this system is that the leakage fluid of a hazardous material flows into a temporary storage tank and this is transferred to a spare tank by a pump as avoiding the overflow of a temporary storage tank. In order to design this system, the leakage velocity and quantity according to time series should be evaluated. In addition, a proper pump capacity should be determined to avoid repeating the pump switching on and off frequently. In this study, the benzene tank is selected to verify the efficacy of this system. This study can play a critical role to provide a guideline for designing a new system.

A Study on Application of Construction Temporary System to Recover from Disaster on Heavy Snow (폭설재난에 대한 건설가설복구지원체계 활용방안 검토)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Ju;Kang, You-Mi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.59-60
    • /
    • 2011
  • In the 21th century, there ate problems of the environment caused by industrialization. for several years, the world has suffered great losses because of unforeseen weather phenomena. to make a system is needed about natural disaster especially to restore disaster on heavy snow, a role of construction temporary system is important. it needs to be construction temporary system to recover through analysing cases of disaster on heavy rain.

  • PDF

Case Study for Buckling Design of Temporary Bridges using System Buckling Analysis (시스템좌굴 해석법을 이용한 라멘형가교 주요부재의 좌굴설계에 관한 사례 연구)

  • Kyung, Yong Soo;So, Byoung Hoon;Bang, Jin Hwan;Kim, Moon Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.1
    • /
    • pp.87-98
    • /
    • 2007
  • Generally, main girders and steel piers of temporary bridges form the steel rahmen structure. In this study, the rational stability design procedure for main members of temporary bridges was presented using a 3D system buckling analysis and second-order elastic analysis. Six types of temporary bridges, which can be designed and fabricated in reality, were chosen and the buckling design for them was performed in consideration ofload combinations of dead and live loads, thermal load, and wind load. Effective buckling length of steel piers, transition of 3D buckling modes, and effects of second-order analysis were investigated through a case study involving six temporary bridges.

DEVELOPMENT AND EVALUATION OF A TEMPORARY PLACEMENT AND CONVEYANCE OPERATION SIMULATION SYSTEM USING AUGMENTED REALITY

  • Yan, Weida;Aoyama, Shuhei;Ishii, Hirotake;Shimoda, Hiroshi;Sang, Tran T.;Inge, Solhaug Lars;Lygren, Toppe Aleksander;Terje, Johnsen;Izumi, Masanori
    • Nuclear Engineering and Technology
    • /
    • v.44 no.5
    • /
    • pp.507-522
    • /
    • 2012
  • When decommissioning a nuclear power plant, it is difficult to make an appropriate plan to ensure sufficient space for temporary placement and conveyance operations of dismantling targets. This paper describes a system to support temporary placement and conveyance operations using augmented reality (AR). The system employs a laser range scanner to measure the three-dimensional (3D) information of the environment and a dismantling target to produce 3D surface polygon models. Then, the operator simulates temporary placement and conveyance operations using the system by manipulating the obtained 3D model of the dismantling target in the work field. Referring to the obtained 3D model of the environment, a possible collision between the dismantling target and the environment is detectable. Using AR, the collision position is presented intuitively. After field workers evaluated this system, the authors concluded that the system is feasible and acceptable to verify whether spaces for passage and temporary storage are sufficient for temporary placement and conveyance operations. For practical use in the future, some new functions must be added to improve the system. For example, it must be possible for multiple workers to use the system simultaneously by sharing the view of dismantling work.

Development of a Temporary Pole Supporting System to Protect the Plastic Greenhouses from Heavy Snow Damage (플라스틱 온실의 폭설피해 방지를 위한 가지주 장치 개발)

  • Nam, Sang-Woon
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.4
    • /
    • pp.107-113
    • /
    • 2002
  • The pipe framed and arch shape plastic greenhouse, which is the most popular greenhouse in Korea, is relatively weak in snowdrift. Reinforcement of rigid frame or column is required to reduce the damage from heavy snow in this type. But additional rigid frames or columns decrease light transmissivity or workability, and increase construction cost. So it is desirable to prepare some temporary poles and to install them when the warning of heavy snow is announced. This study was carried out to develop the temporary pole supporting system using galvanized steel pipes for plastic housing and to evaluate the safe snow load on a temporary pole. A pipe connector, which is inserted in the top of pipe used in the temporary pole and supports the center purline, was designed and manufactured to be able to carry the upper loads safely. And a bearing plate was safely designed and manufactured in order to carry the loads acting on it to the ground. When temporary poles of ${\phi}$ 25 pipe are installed at 2.4m interval, it shows that the single span plastic greenhouses with 5~7 m width are able to support the additional snow depth of 13.9~25.3 cm beyond the snow load supported by main frame.

Development of a System of Temporary Arch Bridges by Using Snap-fit GFRP Composite Decks (조립식 복합소재 아치구조를 이용한 가교 시스템 개발)

  • Cho, Yong-Sang;Lee, Sung-Woo;Hong, Kee-Jeung
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.276-281
    • /
    • 2008
  • Glass-fiber reinforced polyester(GFRP) composite material is a promising alternative to existing construction materials such as steel, concrete and wood. One of passible applications of GFRP composite material is to build temporary bridges by assembling GFRP composite decks. In this paper, we develop a system of temporary arch bridges that can be built by easy assembling of GFRP composite decks. For this purpose, several types of temporary arch bridges are suggested and verified by FE analysis.

  • PDF

The Characteristics of Structural Behavior of Temporary Bridge Using Continuous Cross Beam (일체형 가로보를 이용한 임시교량의 구조적 거동특성)

  • Joo, Hyung-Joong;Lee, Young-Geun;Lee, Dong-Hyuk;Yoon, Soon-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.5
    • /
    • pp.559-569
    • /
    • 2012
  • Cross-beam in the existing temporary bridge system is usually installed to prevent the lateral-torsional buckling of girders and to promote the construction efficiency. However, most of this cross-beams are connected to the girder web by bolts, and therefore, gravitational load resisting capacity of the cross-beams are negligibly small. In recent years, new temporary bridge system, in which the cross-beams and girders are connected to resist the external loads as a unit, was developed. In this paper, we present the experimental and analytical study results pertaining to the structural behavior and load carrying capacity of new temporary bridge system. From the results of study, it was found that the continuous cross-beam increased the flexural rigidity and reduced the maximum flexural stress in the girder. In addition, it was also found that the new temporary bridge system developed is more appropriate for the application in the long-span temporary bridge.

Numerical Analysis of Airborne Infection Control Performance of Germicidal Systems in a Temporary Shelter (수치해석을 이용한 임시대피소 내 공기감염확산 저감장치의 성능 분석)

  • Park, Jeongyeon;Sung, Minki;Lee, Jaewook
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.21 no.1
    • /
    • pp.7-15
    • /
    • 2015
  • Purpose : When natural disaster occurs, the victims are evacuated to temporary shelters such as indoor gymnasiums or large space buildings until their homes are recovered. If someone in this temporary shelter is infected with an airborne infectious disease, it becomes easier for the disease to spread to the other people in the shelter than it would be under normal conditions. Therefore, temporary shelters need to provide not only water and food but also hygienic indoor conditions. Methods : In this study, the use of mechanical systems such as ultraviolet germicidal irradiation (UVGI) systems and air cleaners were simulated using numerical analysis to find out how these systems can control airborne infection in temporary shelters. An indoor gymnasium was selected as a temporary shelter for the numerical simulation model considering Korea's post-disaster response system. Influenza A virus was assumed as an airborne infectious disease and the diffusion of the virus was made by one person in the shelter. Results : The result of this study showed that the UVGI systems disinfected the virus more effectively than the air cleaners by creating a more stable airflow after the disinfection process. The air cleaners could remove the virus but since it created an unstable airflow in the temporary shelter, the virus was condensed to a certain area to show a higher virus concentration level than the source location. Implications : In the temporary shelter, it is necessary to use UVGI systems or air cleaners for hygienic indoor conditions.

A Study on the Improvement Plan of Reusable Pipe Support Certification System (재사용 파이프서포트 인증제도의 개선방안 연구)

  • Moon, Seong-Oh;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.4-5
    • /
    • 2020
  • Pipe support is a representative structure that supports slab formwork, and it is a representative temporary equipment that has been systematically managed since the 1990s when the domestic temporary equipment performance test system was introduced. Nevertheless, it is also a reality that many of the products in circulation are used products that are reused and do not meet the performance of the initial manufacturing stage. However, if only new products are insisted, it could lead to delays in the process due to an increase in construction costs and difficulties in timely delivery. On the contrary, it is not acceptable for the safety of the construction site to use products of low quality without verification procedures or standards. Therefore, this study attempts to grasp the management system such as safety certification for temporary equipment and the actual condition of quality control to maintain performance, and propose improvement plans.

  • PDF

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.