• Title/Summary/Keyword: technical support project

Search Result 131, Processing Time 0.03 seconds

Enforcement Measurement of safety and health technical support project for small-sized businesses by survey (수혜사업장 실태조사에 의한 소규모 사업장 안전보건 기술지원사업 실효성 강화방안)

  • Ahn, Yongro;Yoon, Younggeun;Oh, Taekeun;Lee, Myeonggu
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.529-535
    • /
    • 2022
  • In order to minimize occupational accidents at worksites, the government is proposing and operating various safety and health policies. The safety and health management capabilities of domestic workplaces vary greatly depending on the size of the workplace, and in particular, safety management is difficult in workplaces with fewer than 50 employees, resulting in a relatively high accident rate. Therefore, the government is operating the safety and health technical support project for small business sites to establish safety and health in small business. In this regard, this study provided a plan for substantiating the safety and health technical support project. through the condition survey of the workplace.

The Scope and Relationship of Project Management and Systems Engineering Management (프로젝트 관리(PM)와 시스템엔지니어링 관리(SEM)의 범위 및 관계)

  • Lee, Joongyoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.1-13
    • /
    • 2014
  • Put Abstract text here. Recently, the Korea industry need systems engineering technology more than yesterday. The systems engineering management function is needed to use the systems engineering engine process effectively. The systems engineering management function is overlapped a lot with project management function and has vague interface. The project management and systems engineering are two independent disciplines. So there are few references which address the scope and relationships clearly between systems engineering management and project management. This paper suggest the scope and relationships between systems engineering management and project management and revise the PMP and SEMP structure of Blanchard and Fabrycky. Followings are the key concept of this paper presenting. The project management(PM) composed of technical management and non-technical management. The technical management scope is same with systems engineering management. The non-technical management scope is composed of parts of enterprise support processes.

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF

A study on the Development of Systems Engineering Application Model for LRT based on MBSE (전산도구 기반의 경량전철사업 시스템엔지니어링 적용모델 SELRT 개발)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Cheol
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.9-19
    • /
    • 2012
  • The Light Rail Transit Project is a large scaled project which takes several years in building a system. After construction, LRT system is operating for several tens of years. For these characteristics, the right application of systems engineering to LRT project greatly effects the project success. In this paper, we present systems engineering application model to LRT project i.e. SELRT which include systems engineering technical process, core technology management process, project support process. SELRT also has a module for the exchange of outputs in SE tool and PM tool. Systems engineering processes in SELRT mainly base on ISO/IEC 15288. In future, we expand the range of SE processes and improve the usability in SELRT. We expect that this model will contribute to improve the efficiency in LRT project and to success the LRT project.

Support Project for the Establishment of a Smart Factory for the Win-win between Large and Small Businesses Performance Analysis of the Adopting Company (대·중소 상생형 스마트공장 구축 지원 사업 도입기업에 대한 성과분석)

  • Seo, Hongeil;Kim, Taesung
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.135-142
    • /
    • 2022
  • The smart factory is an important system that can reduce defects, maximize productivity, and respond to customer needs, from the labor-intensive era of traditional small and medium-sized manufacturing companies through the automation era to CPS using ICT. However, small and medium-sized manufacturers often fall short of the basic stage due to economic and environmental constraints, and there are many companies that do not even recognize the concept of a smart factory. In this situation, to expand the smart factory of small and medium-sized enterprises, the project to support the establishment of a smart factory for the win-win between large and small enterprises. The win-win smart factory construction support project provides a customized differentiation program support project according to the size and level of the company for all domestic manufacturing SMEs regardless of whether or not they are dealing with Samsung. In this study, we analyze the construction status and introduction performance of companies participating in the win-win smart factory support project to find out whether they have been helpful in management and to find efficient ways to improve support policies, and to suggest the direction of continuous support projects to improve the manufacturing competitiveness of SMEs in the future.

A Building Scheme on LAMIS for ROK Army (한국군 종합군수지원 관리정보체계 (LAMIS) 구축방안)

  • Hong Jang-Ui;Yun Hyeon-Cheol;Byeon Jae-Jeong
    • Journal of the military operations research society of Korea
    • /
    • v.18 no.2
    • /
    • pp.1-22
    • /
    • 1992
  • Computer-aided logistics support system is recognized an essential system to reduce supply and maintenance cost, and to improve readiness of weapon system or operationable composite machines. According to these trends, this paper focuses on the design scheme and the computerization strategy of information management system for Integrated Logistics Support (ILS) work. Suggested system. LAMIS(Logistics support Analysis Management Information System) is a total system that composed of Logistics Support Analysis Management information system (LSAM), Configuration Management Information System (CMIS), Maintenance Management Information System (MMIS), Project Management System (PMS) and Information Retrival System(IRS) etc. Also, LAMIS is a computerized tool that improves current supply and maintenance support program, that attempts to reliable requirment analysis of logistics support elements, and that supports to use the existing technical specification of similar one when weapon system acquisition project is started newly. When LAMIS implication is completed, it can be applied to logistics support of defense or commercial site. Straightway, LAMIS will be enhanced with computer - aided design system, engineering drawing system, interactive electronic technical manual system, electronic data interchange system, and three dimensional simulation system to weapon system configuration. When that is done, LAMIS is CALS system.

  • PDF

Factors Affecting the Implementation Success of Data Warehousing Systems (데이터 웨어하우징의 구현성공과 시스템성공 결정요인)

  • Kim, Byeong-Gon;Park, Sun-Chang;Kim, Jong-Ok
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2007.05a
    • /
    • pp.234-245
    • /
    • 2007
  • The empirical studies on the implementation of data warehousing systems (DWS) are lacking while there exist a number of studies on the implementation of IS. This study intends to examine the factors affecting the implementation success of DWS. The study adopts the empirical analysis of the sample of 112 responses from DWS practitioners. The study results suggest several implications for researchers and practitioners. First, when the support from top management becomes great, the implementation success of DWS in organizational aspects is more likely. When the support from top management exists, users are more likely to be encouraged to use DWS, and organizational resistance to use DWS is well coped with increasing the possibility of implementation success of DWS. The support of resource increases the implementation success of DWS in project aspects while it is not significantly related to the implementation success of DWS in organizational aspects. The support of funds, human resources, and other efforts enhances the possibility of successful implementation of project; the project does not exceed the time and resource budgets and meet the functional requirements. The effect of resource support, however, is not significantly related to the organizational success. The user involvement in systems implementation affects the implementation success of DWS in organizational and project aspects. The success of DWS implementation is significantly related to the users' commitment to the project and the proactive involvement in the implementation tasks. users' task. The observation of the behaviors of competitors which possibly increases data quality does not affect the implementation success of DWS. This indicates that the quality of data such as data consistency and accuracy is not ensured through the understanding of the behaviors of competitors, and this does not affect the data integration and the successful implementation of DWS projects. The prototyping for the DWS implementation positively affects the implementation success of DWS. This indicates that the extent of understanding requirements and the communication among project members increases the implementation success of DWS. Developing the prototypes for DWS ensures the acquirement of accurate or integrated data, the flexible processing of data, and the adaptation into new organizational conditions. The extent of consulting activities in DWS projects increases the implementation success of DWS in project aspects. The continuous support for consulting activities and technology transfer enhances the adherence to the project schedule preventing the exceeding use of project budget and ensuring the implementation of intended system functions; this ultimately leads to the successful implementation of DWS projects. The research hypothesis that the capability of project teams affects the implementation success of DWS is rejected. The technical ability of team members and human relationship skills themselves do not affect the successful implementation of DWS projects. The quality of the system which provided data to DWS affects the implementation success of DWS in technical aspects. The standardization of data definition and the commitment to the technical standard increase the possibility of overcoming the technical problems of DWS. Further, the development technology of DWS affects the implementation success of DWS. The hardware, software, implementation methodology, and implementation tools contribute to effective integration and classification of data in various forms. In addition, the implementation success of DWS in organizational and project aspects increases the data quality and system quality of DWS while the implementation success of DWS in technical aspects does not affect the data quality and system quality of DWS. The data and systems quality increases the effective processing of individual tasks, and reduces the decision making times and efforts enhancing the perceived benefits of DWS.

  • PDF

A Study on the Improvement Direction for Timely Technical Guidance Project (적시기술지도 시범사업의 개선방안에 관한 연구)

  • Ko, Won-Kyoung;Park, Jong Yil;Yi, Young-Seop
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.443-450
    • /
    • 2014
  • The industrial accident rate has been steadily decreased by making all efforts for the prevention of accidents after enacting Occupational Health and Safety Act in 1981. However, ordinary typed industrial accidents still occur in small and medium sized enterprises(SME). Timely Technical Guidance(TTG) project of Korea Occupational Safety & Heath Agency(KOSHA) for SME's was initiated to visit and provide the analysis and control of industrial accidents by the staffs of KOSHA as soon as possible after accidents occurred. This study is conducted to analyze the questionnaire survey for employers, workers and TTG personnel of KOSHA with being evaluated positively whether the demonstration project of TTG has been executed consistently. However, it is suggested that the understanding of TTG project and legal support are necessary for the establishments, and the development of a variety data and lots of available contents is necessary to increase satisfaction of the TTG project. The accident rate of SME's which are employed less than 50 workers is expected to be largely decreased with applying the control and improvement over this study with maintaining and developing TTG technology.

Integration of System Design and Management Data Using CASE Tool (시스템공화 전산지원도구를 이용한 시스템 설계 및 관리 데이터의 통합)

  • Lee, Woo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1097-1098
    • /
    • 2006
  • This study investigated the needs and effectiveness of the application of Computer-Aided Systems Engineering Tool in order to enhance the chance of success of the large and complex system development projects like City Train System. Furthermore, it was shown that the merits of Systems Engineering and Project Management must be complementary to each other in their interaction in a project. Especially, for the project plans must be executed based on the fully understood system being developed, the technical and management data of the system development need be integrated and be able to support exact and rapid decision making of project planning. As an alternative solution approach, a model for development knowledge capture integrating both technical and management data of system development was proposed using Computer Aided Systems Engineering tool-Cradle.

  • PDF

A Study on Improvement Plans for Safety and Health Technical Support Project on Small Business by Field (소규모 사업장 안전보건 기술지원사업의 분야별개선방안에 대한 연구)

  • Yongro Ahn;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.625-632
    • /
    • 2023
  • Due to the recent occupational accidents, the government made efforts such the Severe Accident Punishment Act and roadmap for reducing severe accidents. In particular, more than 80% accidents occur in small businesses, such as those with less than 50 employees and construction sites with a construction cost of less than 100 million, and practical efforts are needed to reduce them. In small businesses, the appointment of a safety managers and safety and health management regulations have been excluded in whole or in part, and technical guidance from an institution specializing in accident prevention is compulsory to supplement them. In this study, the problems of the safety and health technology support project for small workplaces has been identified through a survey and improvement plans were proposed.