Purpose: At the beginning of the Coronavirus disease (COVID-19) epidemic, physicians paid close attention to children with chronic diseases to prevent transmission or a severe course of infection. We aimed to measure the severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2) antibody levels in children with chronic gastrointestinal and liver diseases to analyze the risk factors for infection and its interaction with their primary disease. Methods: This cross-sectional study analyzed SARS-CoV-2 antibody levels in patients with gastrointestinal and liver diseases (n=141) and in healthy children (n=48) between January and February 2021. Results: During the pandemic, 10 patients (7%) and 1 child (2%) had confirmed COVID-19 infection (p=0.2). The SARS-CoV-2 antibody test was positive in 36 patients (25.5%) and 11 children (22.9%) (p=0.7). SARS-CoV-2 antibody positivity was found in 20.4%, 26.6%, 33.3%, and 33.3% of patients with chronic liver diseases, chronic gastrointestinal tract diseases, cystic fibrosis, and liver transplantation recipients, respectively (p>0.05, patients vs. healthy children). Risk factors for SARS-CoV-2 antibody positivity were COVID-19-related symptoms (47.2% vs. 14.2%, p=0.00004) and close contact with SARS-CoV-2 polymerase chain reaction-positive patients (69.4% vs. 9%, p<0.00001). The use, number, and type of immunosuppressants and primary diagnosis were not associated with SARS-CoV-2 antibody positivity. The frequency of disease activation/flare was not significant in patients with (8.3%) or without (14.2%) antibody positivity (p=0.35). Conclusion: SARS-CoV-2 antibodies in children with chronic gastrointestinal and liver diseases are similar to that in healthy children. Close follow-up is important to understand the long-term effects of past COVID-19 infection in these children.
Journal of the Korean Society of Systems Engineering
/
v.10
no.2
/
pp.71-79
/
2014
To enhance success probability of a system development project, its overall risk level should be minimized through systematically managing schedules, costs, and technical performances. However, Attempts to manage technical performance compared to numerous efforts to control costs and schedules in such projects are deficient. Particularly, a space launch vehicle, a large complex system, development project is much less likely to meet its technical performance objectives due to its technological difficulty, along with schedule delay and cost overrun. The technical performance management (TPM) is a method for tracking and managing technical progress in order to achieve technical performance targets within schedule and budget. In this paper, we investigate applications of the TPM in several space launch vehicle development projects. Then we propose and validate the TPM process to achieve a successful mission in such projects.
Journal of the Korea institute for structural maintenance and inspection
/
v.22
no.1
/
pp.64-71
/
2018
Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.
Seo, Heui Jung;Park, Seon Jung;Park, Seol Hwa;Park, Seung Min
Journal of Korean Society of Coastal and Ocean Engineers
/
v.34
no.5
/
pp.144-155
/
2022
The Korea Coast Guard evaluates the risk of major coastal activity places to prevent coastal accidents, and patrols and manages them based on that, but it is not responding properly to the continuously increasing number of coastal accidents. The reason for this is that, despite the gradual expansion of coastal activity places, there is a lack of manpower to manage and supervise them, resulting in blind spots in coastal accident safety management. Therefore, in order to solve this problem, it is necessary to prepare more efficient and effective measures that check and supplement the current coastal safety management system. Coastal accidents show different characteristics of accident causes and places due to differences in the activity characteristics of users according to time. As a result of analyzing coastal accident data (2017~2021), the frequency of daytime accidents is high in the case of sea rock, beach, and offshore, where family leisure activities are frequent. In the case of wharf, tidal flat and bridge, where accidents due to drinking, disorientation, and suicide mainly occur, the frequency of accidents at night is high. In addition, there were more accidents on weekends when the number of users increased compared to weekdays. This trend indicates that the user's temporal activity characteristics must be reflected in the risk assessment of coastal activity places. Therefore, in this study, based on the case of coastal accidents, the characteristics of accidents at coastal activity places according to time were identified, and the criteria were presented for risk evaluation by grading them. It is expected that it will be possible to lay the foundation for reducing coastal accidents by efficiently managing and supervising coastal activity places over time using the presented evaluation criteria.
Kim Sang Am;Wang Jong Bae;Kwak Sang Log;Lee Dong Ha
Proceedings of the KSR Conference
/
2003.10b
/
pp.223-228
/
2003
Risk Management does not mean accepting a risk but having a good grasp of, eliminating and controling the exact causes of known hazards. Good safety management plan or system for the safety of any systems need to include the procedures about standing safety goals, related technical information, time schedule, audit programs, etc at least. In this paper the summeries on general risk assessment techniques and the examples of risk assessment system and railway risk management strategies used in UK, Australia and Canada are introduced, and applicable establishment procedures for domestic railway industries are proposed.
The benefits of pesticides in improving the food quantity and quality requirements for an increasing world population are significant, and they can be described in agronomic, economic and social terms. The risks are assessed from the hazards which are likely to occur in practice ; the hazards are defined by the toxicity of the pesticide to non-target organisms at various exposure levels. There are ways of reducing the risks (mainly by reducing exposure in practice) and improving the benefits of pesticides ; these are known as risk management and benefit management respectively. The overall risk-benefit assessment is facilitated if each component can be expressed in financial terms, but it must be made nationally or locally on a sound technical basis against the prevailing agronomic, socio-economic and political circumstances. Paraquat is used to illustrate the risk-benefit assessment process in general terms, and the conclusion is that the benefits greatly outweigh the risks. It is important to keep the risks of pesticides in perspective with those associated with other naturally occurring chemicals in our diet and with other everyday aspects of life. In an overall context, the pesticide risk is small.
As one of promising solutions to overcome high oil price and energy crisis, the construction market of high value-added LNG plants is spotlighted world widely. The purpose of this study is to introduce LNG-RBI system to develop risk assessment technology with RAM(Reliability, Availability, Maintainability) modules against overseas monopolization. After analyzing relevant specific features and their technical levels, risk assessment program, non-destructive reliability evaluation strategy and safety criteria unification class are derived as core technologies. These IT-based convergence technologies can be used for enhancement of LNG plant efficiency, in which the modular parts are related to a system with artificial optimized algorithms as well as diverse databases of facility inspection and diagnosis fields.
Transactions of the Korean Society of Automotive Engineers
/
v.21
no.5
/
pp.130-135
/
2013
Until now, passenger airbag design is based on the referred car design and many repetitive crash tests have been done to meet the crash performance. In this paper, it was suggested a new design process of passenger airbag. First, key performance factors were determined by analyzing the injury risk effectiveness of each performance factor. And it was made a relationship between injury risk and performance factor by using the response surface model. By using this one, it can be predicted the injury risk of head and neck. Predicted injury risk of optimal design was obtained through this injury risk prediction model and it was verified by FE analysis result within 18% error of head and 9% error of neck. It was shown that a target crash performance can be met by controlling the key performance factors only.
A. Can Zulfikar;Seyhan Okuyan Akcan;Ali Yesilyurt;Murat Eroz;Tolga Cimili
Geomechanics and Engineering
/
v.35
no.6
/
pp.581-591
/
2023
North Anatolian Fault Zone is tectonically active with recent earthquakes (Mw7.6 1999-Kocaeli and Mw7.2 1999-Düzce earthquakes) and it passes through Marmara region, which is highly industrialized, densely populated and economically important part of Turkey. Many power plants, located in Marmara region, are exposed to high seismic hazard. In this study, open source OpenQuake software has been used for the probabilistic earthquake hazard analysis of Marmara region and risk assessment for the specified energy facility. The SHARE project seismic zonation model has been used in the analysis with the regional sources, NGA GMPEs and site model logic trees. The earthquake hazard results have been compared with the former and existing earthquake resistant design regulations in Turkey, TSC 2007 and TBSCD 2018. In the scope of the study, the seismic hazard assessment for a typical natural gas combined cycle power plant located in Marmara region has been achieved. The seismic risk assessment has been accomplished for a typical control building located in the power plant using obtained seismic hazard results. The structural and non-structural fragility functions and a consequence model have been used in the seismic risk assessment. Based on the seismic hazard level with a 2% probability of exceedance in 50 years, considered for especially these type of critical structures, the ratios of structural and non-structural loss to the total building cost were obtained as 8.8% and 45.7%, respectively. The results of the study enable the practical seismic risk assessment of the critical facility located on different regions.
This paper tries the systematic approach to risk which is a major theme in engineering ethics utilizing science and technology studies. The types of risk can be classified as technical risk, methodological risk, epistemological risk by the degree of uncertainty. The strategies for risk management can be assorted to applied science strategy, professional consultancy strategy, post-normal science strategy. These types and strategies of risk request different kinds of expertise such as technocratic expertise, interactive expertise, democratic expertise. This paper can not only contribute to complement and extend engineering ethics education but also be linked with the goals of engineering education in general.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.