Proceedings of the Korean Society of Propulsion Engineers Conference
/
2007.04a
/
pp.3-6
/
2007
Korea Aerospce Research Institute(KARI) has been developing the first civilian rocket, Korea space launch vehicle (KSLV-I), which can put the small size satellite into designated orbit. Developing launch vehicles contains a lot of uncertainty due to large scale, complexity, and technical difficulty. The uncertainty may become risk in the areas of business and technology which causes schedule delay, cost increase, and design changes of subsystems and components. This study describes the technical risk identification methods using FTA and procedures of planning and implementation of risk assessment and reduction of launch vehicle propulsion system.
Previous earthquakes show that, structural safety evaluations should include the evaluation of nonstructural components. Failure of nonstructural components can affect the operational capacity of critical facilities, such as hospitals and fire stations, which can cause an increase in number of deaths. Additionally, failure of nonstructural components may result in economic, architectural, and historical losses of community. Accelerations and random vibrations must be under the predefined limitations in structures with high technological equipment, data centers in this case. Failure of server equipment and anchored server racks are investigated in this study. A probabilistic study is completed for a low-rise rigid sample structure. The structure is investigated in two versions, (i) conventional fixed-based structure and (ii) with a base isolation system. Seismic hazard assessment is completed for the selected site. Monte Carlo simulations are generated with selected parameters. Uncertainties in both structural parameters and mechanical properties of isolation system are included in simulations. Anchorage failure and vibration failures are investigated. Different methods to generate fragility curves are used. The site-specific annual hazard curve is used to generate risk curves for two different structures. A risk matrix is proposed for the design of data centers. Results show that base isolation systems reduce the failure probability significantly in higher floors. It was also understood that, base isolation systems are highly sensitive to earthquake characteristics rather than variability in structural and mechanical properties, in terms of accelerations. Another outcome is that code-provided anchorage failure limitations are more vulnerable than the random vibration failure limitations of server equipment.
Park, Seon Jung;Park, Seol Hwa;Seo, Heui Jung;Park, Seung Min
Journal of Korean Society of Coastal and Ocean Engineers
/
v.33
no.6
/
pp.226-237
/
2021
Coastal safety accidents are characterized by a high proportion of human negligence and repeated occurrences of accidents caused by the same factors. The Korea Coast Guard prepares and implements various countermeasures to prevent accidents at coastal safety accident sites. However, there is a shortage of safety facilities and safety management personnel according to the limited budget. In addition, the ability to be proactively and proactively respond is low due to the limitations of the coastal safety accident risk forecasting system, which relies on the meteorological warning of the Korea Meteorological Administration. In this study, as part of preparing the foundation for establishing a preemptive and active coastal safety management system that can manage accident-causing factors, predict and evaluate risk, and implement response and mitigation measures after an accident occurs before coastal safety accidents occur. The establishment of a risk assessment system was proposed. The main evaluation factors and indicators for risk assessment were established through the analysis of the status of coastal safety accidents. The risk assessment methodology was applied to 40 major hazardous areas designated and managed by the Korea Coast Guard.
International Journal of Computer Science & Network Security
/
v.21
no.12
/
pp.228-234
/
2021
The article defines the problems of forming the models of government regulation of clustering, marketing management and labor market in the context of globalization, business bankruptcy risk and services market development. The clustering models based on the optimal partner network cooperation were proposed in order to ensure the strategic development of territories, to attract budget leading enterprises and to support small businesses. A descriptive model of government regulation of clustering, marketing management and labor market in the context of globalization, business bankruptcy risk and Covid-19 was determined.
Nitrate contamination problems from groundwater supplies have been reported throughout many countries in the world, including Korea. Nitrate salts can induce methemoglobinemia and possibly human gastric cancer. To reduce human health risk from nitrate in groundwater supplies, several nitrate risk-management strategies can be developed based on the acceptable level of human health risk, the reasonableness of nitrate-control cost, and the technical feasibility of nitrate-control methods. However, due to a lack of available information, assessing risk, cost and technical feasibility contains elements of uncertainty. In the present paper, a nitrate risk-management methodology using fuzzy sets in combination with a multiobjective decision-making (MODM) technique is developed to assist decision makers in evaluating, with uncertain information, various nitrate risk-management strategies in order to decide a proper strategy.
Ali, Ahmed Khairadeen;Khan, Numan;Lee, Do Yeop;Park, Chansik
International conference on construction engineering and project management
/
2020.12a
/
pp.313-322
/
2020
The recognition of the risk hazards is a vital step to effectively prevent accidents on a construction site. The advanced development in computer vision systems and the availability of the large visual database related to construction site made it possible to take quick action in the event of human error and disaster situations that may occur during management supervision. Therefore, it is necessary to analyze the risk factors that need to be managed at the construction site and review appropriate and effective technical methods for each risk factor. This research focuses on analyzing Occupational Safety and Health Agency (OSHA) related to risk zone identification rules that can be adopted by the image recognition technology and classify their risk factors depending on the effective technical method. Therefore, this research developed a pattern-oriented classification of OSHA rules that can employ a large scale of safety hazard recognition. This research uses joint reasoning of risk zone Identification and numeric input by utilizing a stereo camera integrated with an image detection algorithm such as (YOLOv3) and Pyramid Stereo Matching Network (PSMNet). The research result identifies risk zones and raises alarm if a target object enters this zone. It also determines numerical information of a target, which recognizes the length, spacing, and angle of the target. Applying image detection joint logic algorithms might leverage the speed and accuracy of hazard detection due to merging more than one factor to prevent accidents in the job site.
In this study, small and medium-sized manufacturing and distribution businesses were asked to demonstrate how the risks that could arise from implementing ITOs affect their performance. Small and medium-sized enterprises that want to reduce costs or secure competitiveness through outsourcing ITO conducted research to identify and analyze risks of ITO and improve corporate performance. Strategic, technical, and financial risks were selected as independent variables for analysis by the survey method. In addition, relationship risk was selected as a parameter and corporate performance was selected as a dependent variable to conduct a path analysis. The analysis showed that the variables injected as independent variables had indirect and total effects on corporate performance. This can be interpreted as the higher the level of awareness of strategic and technological risks and financial risks, the higher the level of relational risk, and thus the positive impact on corporate performance. We expect to improve corporate performance through analysis of more and more risk factors in the future.
Anatomic correction of the transposition of the great arteries (TGA) or Taussig-Bing anomaly by means of the arterial switch operation is now accepted as the therapeutic method of choice. This retrospective study was conducted to evaluate the risk factors for operative deaths and the efficacy of technical modification of the coronary transfer. 85 arterial switch operations for TGA or Taussig-Bing anomaly which were performed by one surgeon from 1994 to July 2002 at Dong-A university hospital were included in this retrospective study Multivariate analysis of perioperative variables for operative mortality including technical modification of the coronary transfer was peformed. Overall postoperative hospital mortality was 20.0% (17/85). The mortality before 1998 was 31.0% (13/42), but reduced to 9.3% (4/43) from 1998. The mortality in the patients with arch anomaly was 61.5% (8/13), but 12.5% (9/72) in those without arch anomaly. In patients who underwent an open coronary reimplantation technique, the operative mortality was 28.1% (18/64), but 4.8% (1/21) in patients undergoing a technique of reimplantation coronary buttons after neoarotic reconstruction. Risk factors for operative death from multivariated analysis were cardiopulmonary bypass time ($\geq$ 250 minutes), aortic cross-clamping time ($\geq$ 150 minutes), aortic arch anomaly, preoperative event, and open coronary reimplantation technique. Operative mortality has been reduced with time. Aortic arch anomaly and preoperative events were important risk factors for postoperative mortality. However atypical coronary artery patterns did not work as risk factors. We think that the technical modification of coronary artery transfer played an important role in reducing the postoperative mortality of arterial switch operation.
To use pressurized facilities safely and effectively, a likelihood of failure (LOF) for the brittle fracture was analyzed quantitatively through the risk based inspection using API-581 BRD. We found that for the case of the low temperature/low toughness and the temper embrittlement, the technical module subfactor (TMSF) showed high value for the A impact curve, low temperature, and the no post weld heat treatment. But the risk didn't significantly change at the $855^{\circ}F$ embrittlement, and the LOF far the sigma phase embrittlement showed high value at low temperature of the high sigma.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.