• 제목/요약/키워드: technical breakdown structure standard

검색결과 2건 처리시간 0.017초

건설가설공사의 표준기술분류체계 구축 (Development of Technical Breakdown Structure Standard in Temporary Works)

  • 박준모;김옥규;박길범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

고속철도차량기술개발 표준 모니터링 절차에 대한 고찰 (A Study on Standard Monitoring Process in Development of High Speed Railway Vehicle)

  • 박민흥;김범진;김철수;최덕호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.528-535
    • /
    • 2011
  • According to railway safety regulations for securing the railway vehicle's quality and performance, it can be partly exempted that the performance tests and production inspections on the railway vehicles which are produced and assembled for the purpose of test and research. The reasons of this exemption are for ensuring maximum autonomy and for saving time considered the development period of railway vehicle. However, it was continuously demanded the necessity of supplementation on the confirmation about railway vehicle's quality & performance. Therefore, we added "The monitoring step" which is for securing the quality and performance in high speed railway vehicle's subsystem & compartment to supplement those tests & inspections in development. In this paper, based on a standard ABS(Activity Breakdown Structure) of railway vehicle and a WBS(Work Breakdown Structure) of the railway vehicle system, we investigate the necessity of monitoring in the High speed railway vehicle development. And by comparing and analyzing the essential requirements of international standard, IRIS(International Railway Industry Standard) & TSI(Technical Specification for Interoperability), we try to examine a standard monitoring procedure.

  • PDF