• Title/Summary/Keyword: technical breakdown structure standard

Search Result 2, Processing Time 0.017 seconds

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

A Study on Standard Monitoring Process in Development of High Speed Railway Vehicle (고속철도차량기술개발 표준 모니터링 절차에 대한 고찰)

  • Park, Min-Heung;Kim, Beom-Jin;Kim, Chul-Su;Choi, Deuck-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.528-535
    • /
    • 2011
  • According to railway safety regulations for securing the railway vehicle's quality and performance, it can be partly exempted that the performance tests and production inspections on the railway vehicles which are produced and assembled for the purpose of test and research. The reasons of this exemption are for ensuring maximum autonomy and for saving time considered the development period of railway vehicle. However, it was continuously demanded the necessity of supplementation on the confirmation about railway vehicle's quality & performance. Therefore, we added "The monitoring step" which is for securing the quality and performance in high speed railway vehicle's subsystem & compartment to supplement those tests & inspections in development. In this paper, based on a standard ABS(Activity Breakdown Structure) of railway vehicle and a WBS(Work Breakdown Structure) of the railway vehicle system, we investigate the necessity of monitoring in the High speed railway vehicle development. And by comparing and analyzing the essential requirements of international standard, IRIS(International Railway Industry Standard) & TSI(Technical Specification for Interoperability), we try to examine a standard monitoring procedure.

  • PDF