• Title/Summary/Keyword: synchronized construction

Search Result 22, Processing Time 0.028 seconds

Overlay Multicast Tree Construction Algorithm for Synchronized Real-time Media Multicast Service over the Internet (동기화된 실시간 미디어 멀티캐스트 서비스에 적합한 오버레이 멀티캐스트 트리 구성 알고리즘)

  • Joo, Hyun-Chul;Song, Hwang-Jun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.11A
    • /
    • pp.1037-1043
    • /
    • 2006
  • This work presents an effective overlay multicast tree construction algorithm for synchronized real-time media multicast service over the Internet. The proposed algorithm is designed to minimize delay variance among group members to provide the synchronized service as well as average delay of group members in order to support the service in real-time. Basically, of orthogonal genetic algorithm is employed to obtain the near optimal tree with a low computational complexity since the given problem is NP-complete. Finally, experimental results are provided to show the superior performance of the proposed algorithm.

Structural Reliability Evaluation Considering Construction Stage and Epistemic Uncertainty of Suspension Bridges (현수교의 시공절차와 인위적 불확실성을 고려한 구조신뢰성 평가)

  • Han, Sung Ho;Shin, Jae Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.181-188
    • /
    • 2009
  • This study presented the basic data for determining reasonable construction method and evaluating the structural safety of suspension bridges. The analytical program was developed to conduct initial shape and natural frequency analysis, construction stage analysis and reliability analysis considering construction sequences. This program was based on analysis models of suspension bridges and reliability theories used in the previous study. A construction method was established considering various construction variables such as construction order and construction direction of girder and synchronized construction of main and side span etc. The dynamic construction analysis by a construction scheme was conducted with the developed program. Benefits of the characteristic analysis by the construction scheme was presented estimating structural response of critical members respectively. Structural reliability analysis by construction stage was conducted considering aleatory uncertainties. The safety of suspension bridges by established construction method was quantitatively estimated using reliability index and failure probability. Analytical results were re-estimated considering epistemic uncertainties, and critical percentile distributions of risk at the construction stage were presented using the frequency histogram.

A Study on Application of Synchronized Production System for H Automobile Plant in China (자동차 공장에 동기화 생산 적용 연구 -중국 H 자동차를 중심으로-)

  • Zhang, Jing-Lun;Lee, Doo-Yong;Jang, Jung-Hwan;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.259-264
    • /
    • 2012
  • Automobile market was grown up by 1.7% at the first half of 2012 comparison with 2011 in China and this growth trend will be continued for a while. Under this market environment the China automobile companies expand the production capacity and result in heightening the intense competition for companies. This paper deals with the more efficient production line and production logistics through SPS(Synchronized Production System) with construction of MES(Manufacturing Execution System) in H automobile company in China. In plastic painting line we can simultaneously prepare the production quantity and delivery time according to assembly production plan by introducing MES. We can reduce the excess production and result in extreme reduction of inventory.

PERFORMANCE EVALUATION AND DEVELOPMENT OF RVDB SYSTEM FOR THE SYNCHRONIZED PLAYBACK PROCESSING OF OBSERVED DATA IN KJJVC (한일공동VLBI상관기에서 관측 데이터의 동기재생처리를 위한 RVDB 시스템 개발과 성능시험)

  • Oh, Se-Jin;Roh, Duk-Gyoo;Yeom, Jae-Hwan;Chung, Hyun-Soo;Lee, Chang-Hoon;Kim, Kwang-Dong;Kim, Hyo-Ryoung;Oyama, Tomoaki;Kawaguchi, Noriyuki;Ozeki, Kensuke
    • Publications of The Korean Astronomical Society
    • /
    • v.23 no.2
    • /
    • pp.91-107
    • /
    • 2008
  • In this paper, we introduce the performance evaluation and development of Raw VLBI Data Buffer(RVDB) system for the synchronized playback processing of observed data in Korea-Japan Joint VLBI Correlator(KJJVC). The high-speed correlation processing system is under development so that the radio data obtained with 8192 channels and 8 Gbps speed from 16 stations will be able to be processed. When the recorded data of each station are played to correlator, the time synchronization of each station is very important because the correlator should process the data obtained with same time and condition. There are many types of recorder systems in the East Asia VLBI Network (EAVN). Therefore it is required to prepare the special time synchronized playback processing system to synchronize the time tag of observed data. The developed RVDB system consists of Data Input Output(DIO), 10GbE switch, and Disk Data Buffer(DDB). It can record the data with maximum 2 Gbps speed, and can play back the data to correlator with nominal 2 Gbps speed. To enable to play back the data of different playback system to the correlator, we developed the high-speed time synchronized playback processing system. We carried out the experiments of playing back and correlation for gigabit correlator and VCS trial product so as to confirm the performance of developed time synchronized playback processing system. In case of online and offline playing back experiment for gigabit correlator, we confirmed that the online and offline correlation results were the same. In case of playing back experiment for VCS trial product, we verified that the wide band and narrow band correlation results were also the same. Through the playing back experiments of RVDB system, the effectiveness of developed RVDB system was verified. In this paper, the system design, construction and experimental results are shown briefly.

The Deflection Measurement of Objects by the CCD Image Acquisition System (CCD 영상획득 시스템에 의한 피사체의 변위 측정)

  • 강준묵;배연성;주영은;엄대용
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.1
    • /
    • pp.25-32
    • /
    • 2000
  • These days, the quantitative analysis of digital image by on-line image analysis system is being progressed actively, so the application of digital image is being groped in the safe test of construction. In this study, the synchronized 3D image acquisition and the system for processing that were established for analyzing the deflection of construction by using the acquired image from CCD camera. The reliability and the possibility of this established system are presented by deriving the accuracy of image analysis and the deflection of object through concrete loading test.

  • PDF

Suboptimal control strategy in structural control implementation

  • Xu, J.Y.;Li, Q.S.;Li, G.Q.;Wu, J.R.;Tang, J.
    • Structural Engineering and Mechanics
    • /
    • v.19 no.1
    • /
    • pp.107-121
    • /
    • 2005
  • The suboptimal control rule is introduced in structural control implementation as an alternative over the optimal control because the optimal control may require large amount of processing time when applied to complex structural control problems. It is well known that any time delay in structural control implementation will cause un-synchronized application of the control forces, which not only reduce the effectiveness of an active control system, but also cause instability of the control system. The effect of time delay on the displacement and acceleration responses of building structures is studied when the suboptimal control rule is adopted. Two examples are given to show the effectiveness of the suboptimal control rule. It is shown through the examples that the present method is easy in implementation and high in efficiency and it can significantly reduce the time delay in structural control implementation without significant loss of performance.

A completely non-contact recognition system for bridge unit influence line using portable cameras and computer vision

  • Dong, Chuan-Zhi;Bas, Selcuk;Catbas, F. Necati
    • Smart Structures and Systems
    • /
    • v.24 no.5
    • /
    • pp.617-630
    • /
    • 2019
  • Currently most of the vision-based structural identification research focus either on structural input (vehicle location) estimation or on structural output (structural displacement and strain responses) estimation. The structural condition assessment at global level just with the vision-based structural output cannot give a normalized response irrespective of the type and/or load configurations of the vehicles. Combining the vision-based structural input and the structural output from non-contact sensors overcomes the disadvantage given above, while reducing cost, time, labor force including cable wiring work. In conventional traffic monitoring, sometimes traffic closure is essential for bridge structures, which may cause other severe problems such as traffic jams and accidents. In this study, a completely non-contact structural identification system is proposed, and the system mainly targets the identification of bridge unit influence line (UIL) under operational traffic. Both the structural input (vehicle location information) and output (displacement responses) are obtained by only using cameras and computer vision techniques. Multiple cameras are synchronized by audio signal pattern recognition. The proposed system is verified with a laboratory experiment on a scaled bridge model under a small moving truck load and a field application on a footbridge on campus under a moving golf cart load. The UILs are successfully identified in both bridge cases. The pedestrian loads are also estimated with the extracted UIL and the predicted weights of pedestrians are observed to be in acceptable ranges.

Analysis and monitoring on jacking construction of continuous box girder bridge

  • Li, Fangyuan;Wu, Peifeng;Yan, Xinfei
    • Computers and Concrete
    • /
    • v.16 no.1
    • /
    • pp.49-65
    • /
    • 2015
  • It is hard to guarantee the strict synchronization of all the jacking-up points in the integral jacking of a large-span continuous box girder bridge. This paper took the Hengliaojing Bridge as background, which need jacking up as an object with 295m length and more than 10,000tons weight, adopted 3D software to calculate the unsynchronized jacking-up working conditions, and studied the relationships between the unsynchronized vertical difference and the girder's deformation behaviour. The aim is to verify the maximum value of the unsynchronized vertical difference, and guide the construction and ensure safety. The monitoring system with its contents is introduced corresponding to the analysis. The results of the deck relative elevations prove that it is difficult to avoid the deck torsional deformation for jacking different; especially the side span shows more deformations for its smaller stiffness. The maximum difference is smaller than the limited value with acceptable stresses in the sections. The jacking heights of the pier in each construction step are controlled regularly according to the design. The shifting of the whole bridge in longitudinal direction is smaller than in transverse direction. The several beginning steps are the key to adjust their support reactions. This study is one parts of the fundamental research for the code "Technical specification for bridge jacking-up and reposition of China". The whole synchronous jacking project of the main bridge set a world record by the World Record Association for the whole bridge jacking project with the longest span of the world.

Vision-based multipoint measurement systems for structural in-plane and out-of-plane movements including twisting rotation

  • Lee, Jong-Han;Jung, Chi-Young;Choi, Eunsoo;Cheung, Jin-Hwan
    • Smart Structures and Systems
    • /
    • v.20 no.5
    • /
    • pp.563-572
    • /
    • 2017
  • The safety of structures is closely associated with the structural out-of-plane behavior. In particular, long and slender beam structures have been increasingly used in the design and construction. Therefore, an evaluation of the lateral and torsional behavior of a structure is important for the safety of the structure during construction as well as under service conditions. The current contact measurement method using displacement meters cannot measure independent movements directly and also requires caution when installing the displacement meters. Therefore, in this study, a vision-based system was used to measure the in-plane and out-of-plane displacements of a structure. The image processing algorithm was based on reference objects, including multiple targets in Lab color space. The captured targets were synchronized using a load indicator connected wirelessly to a data logger system in the server. A laboratory beam test was carried out to compare the displacements and rotation obtained from the proposed vision-based measurement system with those from the current measurement method using string potentiometers. The test results showed that the proposed vision-based measurement system could be applied successfully and easily to evaluating both the in-plane and out-of-plane movements of a beam including twisting rotation.

A Study on the Remodeling for Improvement of Acoustic Performance at Indoor Swimming Pool (실내수영장 음향성능 개선을 위한 리모델링에 관한 연구)

  • Kim, Nam-Don;Kim, Dae-Goon;Kim, Jae-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.87-94
    • /
    • 2009
  • Recently, in accordance with the interesting on well-being as well as the revitalization of living athletics, it is current tendency that people who use the swimming pools are on increasing. However, because the most of indoor swimming pools have ever used the reflection finishing materials likely as the tile due to the property of its hydrophilic space, the inside of indoor swimming pool is vibrating too much, and some problem which the voice and music do not delivering clearly is occurring when swimming lessons or underwater aerobics(synchronized swimming) and swimming game. Based on such viewpoint, locating the object on actually built indoor swimming pool, this Study has ever grasped its physical acoustic property, and finally designed the indoor swimming pool that contains an optimum acoustic condition, by remodelling it through an acoustic simulation. It is considered that such study result could be utilized as the useful materials when constructing the similar indoor swimming pool, hereafter.