• Title/Summary/Keyword: substation

Search Result 1,000, Processing Time 0.028 seconds

Construction of Intelligent Substation for 154kV Class (154kV급 인텔리전트 변전소 구축)

  • Chung, Y.H.;Yang, D.I.;Kim, J.B.;Choi, I.H.;Kim, J.H.;Lee, D.I.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.129-130
    • /
    • 2005
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(DCP) replaces local panel which is drived by mechanical operation. For monitoring rendition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

A Study on the HVDC Submarine Cable Fault Location Searching Case (HVDC 해저케이블 고장점 탐지 사례 연구)

  • Moon, Shin-Yong;Kim, Jeong-Dae;Jang, Seok-Han
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.138-140
    • /
    • 2006
  • 한국전력공사(이하 한전)에서는 제주지역 전력공급의 안정을 위해 '98년부터 국내 최초로 육지전력 계통과 연계하여 장거리 해저케이블 송전선로를 건설하여 운영하고 있다. 해저케이블은 해저에 포설되고 외부적 환경에 견디기 위해 육상케이블과 다른 많은 보호층을 포함하고 있어 설비의 유지보수에 많은 제약사항을 안고 있다. 특히 해남${\sim}$제주 연계선로는 기술적 장점 때문에 AC송전 대신 HVDC 송전을 하고 있어 한단계 Upgrade된 설비운영 기술이 필요하다. 본 고에서는 HVDC 해저 케이블의 설비운영에 있어 선로의 고장시 케이블의 고장점 위치를 탐지하는데 중점을 두어 실제 고장점 탐지 사례를 중심으로 HVDC 해저 케이블 고장점 탐지 방법 및 시험 결과를 검토하고 향후 유사 고장 발생에 효과적으로 대응하기 위한 절차를 제시하였다.

  • PDF

Modeling and prediction of rapid pollution of insulators in substations based on weather information

  • Nanayakkara, Nishantha;Nakamura, Masatoshi;Goto, Satoru;Taniguchi, Takashi
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1994.10a
    • /
    • pp.202-206
    • /
    • 1994
  • Mathematical model of the pollution rate of substation insulators is constructed, taking the model parameters as wind speed, wind direction, typhoon conditions and rainfall in an hourly basis. The main feature of model construction is to distinguish the effect of each parameter by separately analyzing the positive and negative pollution causing factors. Model parameters for the insulators of Karatsu substation, Saga, Japan were estimated and model validation was done using the actual data, in which the pollution deposits on the insulators were measured using pilot insulator and 'salt meter'. The proposed model of the pollution rate [mg/cm$^{2}$/hr] enables the identification of the effective parameters and prediction of the pollution rate so that it helps for the automatic decision making for insulator cleaning or the model can be used as a tool for the substation engineers to make precautionary measures.

  • PDF

A Protection of Substation Equipment Applying Underbuilt Ground Wire and Guy Wire (Underbuilt Ground Wire와 Guy Wire를 이용한 변전소 기기 보호에 관한 연구)

  • Kim Jae Kwan;Lee Jong Beom;Cho Han Goo
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.610-612
    • /
    • 2004
  • Because the overhead transmission lines are exposed to the outdoor weather, the faults of the transmission lines are due to natural conditions, and among these faults, the outage rate by lightning is about $50\%$. Therefore, the insulation design is important to decrease the damage of the facility and to increase the reliability of electric power system. This paper describes the protective method of substation equipments using the Underbuilt Ground Wire and the Guy Wire. This would not only reduce backflashover possibility but also minimize crest and duration of surges entering the substation. EMTP is used to analyze the efficiency of the proposed methods.

  • PDF

Intelligent Substation Construction of 154kV Class (154kV 인텔리전트 변전소 구축)

  • Kim J B.;Chung Y. H.;Song W. P.;Choi I. H.;Kim J. H.;Lee D. I.;Koh H. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.524-526
    • /
    • 2004
  • We perform intelligent substation construction of 154kV class with KEPRI. The intelligent substation is build in Gochang 765kV testing facility and consists of electronic instruments, digital control panel, remote monitoring and diagnosis system, and digital relay system. Rogowski coil type CT(RCT) and capacitive voltage divider(CVD) are applicable for instrument transformer of conventional type. Digital control panel(UP) replaces local panel which is drived by mechanical operation. For monitoring condition of GIS and TR, various sensors are used. In this paper, we report the synopsis and the progress state of project.

  • PDF

The Recent Trend of Constraints in Korea Power System and Analysis of the Cause of its Increasing (최근 국내전력계통 계통제약 발생현황 및 증가원인 분석)

  • Shim Jeong Woon;Bang Min Jae;Lee Jin Moon
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.3-6
    • /
    • 2004
  • 전력시장에서 예비력, 송전망 설비 유한성, 열병합발전소 열공급, 수요예측 오차, LNG, 국내무연탄의 우선소비 정책 둥에 의해 경제급전 원칙을 완벽하게 지킬 수 없다. 이로 인하여 고연료비 발전기가 제약에 의해 운전될 수밖에 없고 이 제약발전에 의해 시장가격이 상승하고 소비자 입장에서 보면 전력구입비용이 증가하게 된다. 이 논문에서는 2002, 2003년도 국내전력계통에서 발생한 계통제약 발생현황을 지역별, 월별로 분석하고 2002년 대비 2003계통제약 증가원인을 분석하였다.

  • PDF

Consideration for social expenses according to Electromagnetic field exposure standards (전자계 기준 설정에 따른 사회적 비용 고찰)

  • Lee, Hyung-Han;Yoo, Yeon-Pyo;Lee, Heui-Chan
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.494-496
    • /
    • 2002
  • 본 논문에서는 향후 우리나라에 전자계 규제가 이루어질 경우 국민이 부담해야하는 사회 경제적 비용을 추정하였다. 여기에서 사회 경제적 비용의 추정은 전자계 규제치를 만족하기 위해 선로 지상고만을 조정하였을때 추가되는 건설비용을 기준으로 한 기초적 검토 결과로써 송전선로 표준 모델을 사용하여 예측한 결과 $20{\mu}T$로 기준 설정시 부터 사회 경제적 비용이 발생함을 알 수 있었으며, $10{\mu}T$로 기준 설정 시에는 약 20조원의 추가 비용이 발생할 것으로 예상된다.

  • PDF

Development of a Monitoring Program for the Substation Preventive Diagnostic System (변전소 예방진단시스템 모니터링 프로그램 개발)

  • Kweon, D.J.;Coi, I.H.;Shin, H.C.;Lee, H.J.;Jung, Y.J.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07c
    • /
    • pp.1623-1625
    • /
    • 2001
  • This paper describes a monitoring program for a substation preventive diagnostic system. The monitoring program announces the condition of the transformer and GIS like normal, warning, abnormal and danger from the absolute value of data or change trend to user. The developed system is operating in 345kV U-Ryung substation for performance and environment tests.

  • PDF

Developing electric railway load pattern inspection program (전철 변전소 전력부하패턴 점검 프로그램 개발)

  • Jeon, Yong-Joo;Lee, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.893-898
    • /
    • 2007
  • At present, one of the big characteristics in electric power market in korea is unique seller but in the near future competitions are expected in the market. so additional service for the electric power are expected. Also with development of IT technology, remote inspection for power usage are possible so as consumption pattern analysis. KORAIL is one of the biggest consumer in electric power market so it is necessary to investigate power consumption pattern. This paper presents electric load consumption pattern for representative substation like urban subway, high-speed train, industrial line and simulation program for electric power rate definition program based on billing system database. Base on the substation annual power usage DB data, the characteristic of the substation power consumption are investigated and effective electrical billing system are compared each other. Through this program it is verified that we can save more then several hundred million won for a year.

  • PDF

Development of IEC 61850 Performance Testing Procedures of BUS Protection IED Using UML (UML을 이용한 모선보호 IED의 IEC 61850 성능시험 절차서 개발)

  • Lee, Nam-Ho;Jang, Byung-Tae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.5
    • /
    • pp.767-772
    • /
    • 2008
  • Korea Electric Power Research Institute in charge of the power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology", is performing the verification of performance of the substation automation system. In order to verify a system based BUS protection IED, the standardized document and procedures are required. But there is nothing to describe systematically how to verify IEC 61850 based IED in the system environment except an individual IED testing way and report. This paper presents the substation automation system based ways and procedures to verify the IED using UML(Unified Modelling Language).