• Title/Summary/Keyword: subsea equipment installation

Search Result 6, Processing Time 0.013 seconds

Experimental assessment of slamming coefficients for subsea equipment installations

  • de Oliveira, Allan C;Pestana, Rafael G
    • Ocean Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.163-179
    • /
    • 2020
  • Considering the huge demand of several types of subsea equipment, as Christmas Trees, PLEMs (Pipeline End Manifolds), PLETs (Pipeline End Terminations) and manifolds for instance, a critical phase is its installation, especially when the equipment goes down through the water, crossing the splash zone. In this phase, the equipment is subject to slamming loads, which can induce impulsive loads in the installation wires and lead to their rupture. Slamming loads assessment formulation can be found in many references, like the Recommended Practice RP-N103 from DNV-GL (2011), a useful guide to evaluate installation loads. Regarding to the slamming loads, RP-N103 adopt some simplifying assumptions, as considering small dimensions for the equipment in relation to wave length, in order to estimate the slamming coefficient CS used in load estimation. In this article, an experimental investigation based on typical subsea structure dimensions was performed to assess the slamming coefficient evaluation, considering a more specific scenario in terms of application, and some reduction of the slamming coefficient is achieved for higher velocities, with positive impact on operability.

Experimental Study of Heave Responses of Subsea Equipment during Installation Operation Using Offshore Crane (해상크레인을 이용한 다양한 해저 장비의 설치 작업 시 상하운동응답특성에 관한 모형 시험 연구)

  • Choi, Young-Myung;Nam, Bo Woo;Kim, Nam Woo;Park, In Bo;Hong, Sa Young;Kim, Jong Wook
    • Journal of Ocean Engineering and Technology
    • /
    • v.30 no.2
    • /
    • pp.75-83
    • /
    • 2016
  • An experimental study on a subsea installation using an offshore crane was conducted. Concrete blocks, suction piles, and manifolds were considered in this study. Free decay tests were conducted to investigate the fluid characteristics of the subsea structures. The added masses of the structures were estimated. The motion response amplitudes of the subsea structures were compared for different structures and water depths. In addition, the dynamic tension transfer function of the crane wire was investigated. The root mean square values of the heave motion and the dynamic amplification factor of the wire tension were investigated in irregular waves.

An Overview of Seabed Storage Methods for Pipelines and Other Oil and Gas Equipment

  • Fatah, M.C.;Mills, A.;Darwin, A.;Selman, C.
    • Corrosion Science and Technology
    • /
    • v.16 no.2
    • /
    • pp.76-84
    • /
    • 2017
  • In the construction of subsea oil and gas developments, it is increasingly common that subsea oil and gas equipment will be installed in subsea well before final hookup and production. Installation of wellheads, subsea hardware, pipelines, and surface facilities (platforms, FPSO, FLNG, connected terminals, or gas plants) are increasingly driven by independent cost and vessel availability schedules; this gives rise to requirements that the subsea facilities must be stored in the seabed for a specific time. In addition, schedule delays, particularly in the installation or startup of the connected platform, FPSO, FLNG, or onshore plant may cause unexpected extensions of the intended storage period. Currently, there are two methods commonly used for storage subsea facilities in the seabed: dry parking and wet parking. Each method has its own risks, challenges, and implications for the facility life and its integrity. The corrosion management and preservation method selection is a crucial factor to be considered in choosing the appropriate storage method and achieving a successful seabed storage. An overview of those factors is presented, along with a discussion on the internal corrosion threats and assessments.

Numerical and Experimental Studies of Dual Subsea Pipelines in Trench

  • Jo, Chul H.;Shin, Young S.;Min, Kyoung H.
    • Journal of Ship and Ocean Technology
    • /
    • v.6 no.2
    • /
    • pp.12-22
    • /
    • 2002
  • Offshore pipelines play an important role in the transportation of gas, oil, water and oil products. It is common to have a group of pipelines in the oil and gas field. To reduce the installation cost and time, dual pipelines are designed. There are great advantages in the installation of dual pipelines over two separate single lines. It can greatly reduce the cost for trench, back-filling and installation. However the installation of dual pipelines often requires technical challenges. Pipelines should be placed to be stable against external loadings during installation and design life period. Dual pipelines in trench can reduce the influence of external forces. To investigate the flow patterns and forces as trench depth and slope changes, number of experiments are conducted with PIV(Particle Image Velocimetry) equipment in a Circulating Water Channel. Numerical approaches to simulate experimental conditions are also made to compare with experimental results. The velocity fields around dual pipelines in trench are investigated and analysed. Comparison of both results show similar patterns of flow around pipelines. It is proved that the trench depth contributes significantly on hydrodynamic stability. The trench slope also affects the pipeline stability. The results can be applied in the stability design of dual pipelines in trench section. The complex flow patterns can be effectively linked in the understanding of fluid motions around multi-circular bodies in trench.

A Study of Flow Pattern around the Two-Dimensional Dual Subsea Pipeline on Sea Bottom (해저면에 설치된 2차원 복합해저관로 주위의 유동특성에 관한 실험적 연구)

  • 나인삼;조철희;정우철;김두홍
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2001.10a
    • /
    • pp.122-127
    • /
    • 2001
  • As pipelines are often used to transport gas, oil, water and oil products, there are more than one pipeline installed in the offshore field. The size and space of pipelines are various depending on the design specifications. The pipelines are to be designed and installed to secure the stability to external loads during the installation and operation period. The flow patterns are very complex around the pipelines being dependent on incoming flow velocity, pipelines size and space. To investigate the flow patterns, number of experiment are conducted with visualization equipment in a circulating water channel. The flow motion and trajectory were recorded from the laser reflected particles by camera. From the experiment the flow patterns around spaced pipelines were obtained. Also pressure gradient was measured by mano-meter to estimate the hydrodynamic forces on the behind pipeline. The results show that the various sizes and spaces can be affected in the estimation of external load. The complex flow patterns and pressure gradients can be effectively used in the understanding of flow motion and pressure gradient.

  • PDF

Marine Survey for Designing and Installing Offshore Oil-Gas Plant (오일-가스 해양플랜트 설계 및 설치를 위한 해양탐사)

  • Kim, Wonsik;Woo, Nam-Sub;Park, Jongmyung;Kim, Hyundo;Kang, Dong-Hyo;Park, In-Seok;Kim, Young-Jun;Joo, Yonghwan;Lee, Ho-Young
    • Geophysics and Geophysical Exploration
    • /
    • v.17 no.1
    • /
    • pp.34-44
    • /
    • 2014
  • Because offshore plant industry needs to design, deploy and operate much of equipment especially, the latest trend shows the installation of production facilities is augmented in the subsea. The installed facilities are very difficult to be repaired or changed because they are located in the subsea. For solving these problems, both the directly related information of the production like the optimal number, position and depth of wells and the distribution for effective operation and safety of equipment of subsea should be considered at the preliminary stage of FEED (Front End Engineering Design). The marine exploration is introduced in this paper for providing the fundamental technology to answer the questions related to above considering points. First, some kinds of the offshore plant facilities are enumerated and aims of marine exploration for the offshore oil/gas development are summarized. In addition to it, the main roles of marine survey, in the step of designing and installing offshore oil-gas plant, development are briefly listed. And then foreign examples are shown to help the reader's understand. This paper is hoped to be helpful for understanding the marine exploration that can be applied to offshore oil/gas plant and to be contributed to developing the domestic techniques in this field for the future.