Application of Pay Adjustment Regulation for Highway Flexible Pavements (도로 포장의 초기상태에 따른 공사비 차등지급규정의 시험적용)

  • Seo, Young-Guk
    • International Journal of Highway Engineering
    • /
    • v.11 no.3
    • /
    • pp.111-120
    • /
    • 2009
  • Recently, pay adjustment regulation (PAR) has been developed to induce better performing road pavements around the country. This regulation was successfully applied during rehabilitation of highway flexible pavements for the first time, and their results are the focus of this paper. For highway pavements, a lot has been defined by typical amount of works a day. This lot was further divided into several sublots depending on field conditions. According to AASHTO Quality Assurance Guide Specification, pay factors for each lot were statistically determined with field measurements of five performance indicators. And composite pay factors were calculated by accounting for the impact of individual performance indicators on a long-term performance of pavement. In 2008, the PAR was tested with asphalt overlays conducted at all six local headquarters of Korea Expressway Corporation. Also, concerns raised during implementation are discussed in this paper. Limited data used in this study showed that if all performance indicators fall within the construction limits with less variances final construction costs may increase by 50%, whereas 10% reduction in construction costs could be necessary if key performance indicators such as density do not meet the construction quality requirements.

  • PDF

No-Wait Lot-Streaming Flow Shop Scheduling (비정체 로트 - 스트리밍 흐름공정 일정계획)

  • Yoon, Suk-Hun
    • IE interfaces
    • /
    • v.17 no.2
    • /
    • pp.242-248
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots to allow the overlapping of operations between successive machines in a multi-stage production system. A new genetic algorithm (NGA) is proposed for minimizing the mean weighted absolute deviation of job completion times from due dates when jobs are scheduled in a no-wait lot-streaming flow shop. In a no-wait flow shop, each sublot must be processed continuously from its start in the first machine to its completion in the last machine without any interruption on machines and without any waiting in between the machines. NGA replaces selection and mating operators of genetic algorithms (GAs), which often lead to premature convergence, by new operators (marriage and pregnancy operators) and adopts the idea of inter-chromosomal dominance. The performance of NGA is compared with that of GA and the results of computational experiments show that NGA works well for this type of problem.

Lot-Streaming Flow Shop Problem with Delivery Windows (딜리버리 윈도우 로트-스트리밍 흐름 공정 문제)

  • Yoon, Suk-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.159-164
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots and then scheduling these sublots in order to accelerate the completion of jobs in a multi-stage production system. Anew genetic algorithm (NGA) is proposed for an-job, m-machine, equal-size sublot lot-streaming flow shop scheduling problem with delivery windows in which the objective is to minimize the mean weighted absolute deviation of job completion times from due dates. The performance of NGA is compared with that of an adjacent pairwise interchange (API) method and the results of computational experiments show that NGA works well for this type of problem.