• 제목/요약/키워드: subassembly generation

검색결과 5건 처리시간 0.01초

부품의 리사이클링을 위한 최적 해체경로 생성 (Optimum Disassembly Sequence Generation of Parts for Recycling)

  • 이건상
    • 한국공작기계학회논문집
    • /
    • 제15권1호
    • /
    • pp.70-75
    • /
    • 2006
  • This paper represents a study on disassembly sequence generation system for automobile parts. This system is practically very useful because proper disassembly sequence of end-of-life product becomes crucial as take-back obligations are imposed for environmental reasons. Therefore a disassembly sequence generation system is suggested to automatically derive all the feasible disassembly sequences from the assembly modeling files. As a result, in consideration of the all parts and subassemblies the optimum disassembly sequence is generated. And the optimum disassembly sequence for a certain part or subassembly can be also suggested.

조립 공정계획을 위한 지식기반 시스템 (A Knowledge-based System for Assembly Process Planning)

  • 박홍석;손석배
    • 한국정밀공학회지
    • /
    • 제16권5호통권98호
    • /
    • pp.29-39
    • /
    • 1999
  • Many industrial products can be assembled in various sequences of assembly operations. To save time and cost in assembly process and to increase the quality of products, it is very important to choose an optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using the knowledge of experts. First, a product is divided into several sub-assemblies. Next, the disassembly sequences of sub-assembly are generated using disassembly rules and special information can be extracted through the disassembly process. By combining every assembly sequence of sub-assemblies, we can generate all the possible assembly sequences of a product. Finally, the expert system evaluates all the possible assembly sequences and finds an optimal assembly sequence. It can be achieved under consideration of the parameters such as assembly operation, tool change, safety of part. basepart location, setup change, distance, and orientation. The developed system is applied to UBR(Unit Bath Room) example.

  • PDF

A Knowledge-Based System for Assembly Sequence Planning

  • Park, Hong-Seok
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제1권2호
    • /
    • pp.35-42
    • /
    • 2000
  • To save time and cost in assembly process and to improve th quality of products, it is very important to choose and optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using various methods and the knowledge of experts. To illustrate the effectiveness of the proposed methodology, a knowledge-based system is developed, The built system is applied to the case of UBR(Unit Bath Room). The applying result showed the applicability of the developed system.

  • PDF

리사리클링을 위한 부품의 최적 해체경로 생성에 대한 연구 (Optimum Disassembly Sequence Generation of Parts for Recycling)

  • 이건상
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 추계학술대회 논문집
    • /
    • pp.824-827
    • /
    • 2005
  • This paper represents a study on disassembly sequence generation for automobile parts. This is particularly useful because adequate end-of-life disassembly becomes crucial as take-back obligations are imposed for environmental reasons. Therefore in this paper a method is suggested to automatically derive all the feasible subassemblies and feasible actions between them from the assembly modeling files. As a result, in consideration of the all pars and subassemblies the optimum disassembly sequence is generated. And the optimum disassembly sequence for a certain part or subassembly can be also generated.

  • PDF