The practical difficulties of construction will impose many restrictions on the structural design, and the construction method can also provide unexpected ideas for solving design problems. Through the discussion of three issues closely related to construction in the structural design of Wuhan Center, this paper illustrates the importance of in-depth consideration of the construction situations in the structural design stage. The topics of "Connection between Embedded Steel Plates in Steel Plate Composite Shear Wall" and "Connection Joint between Outrigger Truss and Core Wall" are about how to facilitate on-site construction by simplifying and optimizing detail design. The topic of "Adjusting Internal Force Distribution by Optimizing Construction Sequence" is about how to make the construction process a tool for structural design.
A number of construction practices, implemented during the design process of a reinforced concrete (RC) structural system, may have significant consequences on the behaviour of the structural system in the case of earthquake loading. Although a number of provisions are imposed by the contemporary Greek national design codes for the seismic design of RC structures, in order to reduce the consequences, the influence of the construction practices on the seismic behaviour of the structural system remains significant. The objective of this work is to perform a comparative study in order to examine the influence of three, often encountered, construction practices namely weak ground storey, short and floating columns and two combinations on the seismic performance of the structural system with respect to the structural capacity and the maximum interstorey drifts in three earthquake hazard levels.
Recently, the interest in a complex building increases rapidly in Korea. High-rise complex is not simply the combination of a residential apartment and a business office as previous but a building with the object of the convenience of the residents familiar with city-life style through adapting the high class life style and new residential culture to the business space, and the efficiency in using the limited building site in the town. This study presents an exploratory analysis focusing the structural system with the help of the extensive survey of the construction site in Korea, and aims a guideline for the structural design and construction of high rise complex. Through the survey, change and development in the design and the construction can be seen as the height and size of the complex grow. It is almost indispensable to design a structural system against lateral forces like earthquake or wind, which is usually measured by story drift ratio or story displacement. Improvement of the structural materials and their usages is also included for the efficiency of the structural system. Useful slab-beam system contributing to the decrease of the story height is still a concern.
Wenwei, Jiang;Qi, Yu;Lianjin, Bao;Mingguo, Liu;Jun, Ji;Dasui, Wang
국제초고층학회논문집
/
제8권3호
/
pp.211-220
/
2019
Three cases of supertall connected structures are presented and each of them represents a quite style. The first case is a strong-connected structure. The coupling function of towers and connector contributes a lot to the structural stiffness and stability. Its special construction scheme had great impact on the construction quality and the structural safety, and must be accurately considered. For the second case which is a weak-connected structure, the influences of different connecting modes to the structural dynamic characteristic were explained. Then the combined bearings were proposed to achieve the design presume. In the third case which represents the multi-supported structures, the structural distinctive mechanical properties were discussed. For the structural state during construction process is quite different from that in final service condition, two construction procedures were simulated to get an optimal one. Although there are great challenges to designers, the advantages of the supertall connected buildings are obvious. Further work is needed in this area to adapt to the development of future cities.
Because PBD was started as a design tool for steel construction and concrete construction, it was able to applied to the post and beam method of wooden building constructions. But, it may not suitable to light frame wooden construction that is becoming popular in domestic construction market due to the economical efficiency and the constructive simplification. Owing to the share effects between member and sheathing material or among structural members, light frame wooden construction is different from post and beam construction that use a single structural member. Therefore, consideration on the system analysis and system design are urgently needed to use in actual life and inspect the reliability of structures from the system view. With this in mind, code conversion from ASD to PBD that is pressing issue in domestic wooden building construction was studied, also various countries status about PBD were considered and then approaching methods on the system reliability were referred. Finally, several considerations for the development of PBD were explored. PBD should be considered as, not only a new structural design process that select sizes of structural member, but a industrial tool that can lead a development of more reliable wood products. A strongest point of PBD is independent of various construction materials and construction types.
This study analyzed the effects of building and greenhouse structural code on the structural design and the greenhouse construction cost. The over-design possibility of greenhouse was analyzed when building structural code was applied using standard smart greenhouse drawings. The possibility of decrease in greenhouse construction cost was investigated if the currently applied building structural code was replaced with greenhouse structural code. As a result of comparing the member sizes with the standard drawings, building structural code was designed with 13%~74% more steel than greenhouse structural code. When building construction estimate was replaced with greenhouse construction estimate, it was possible to reduce the total construction cost of the glass greenhouse by 17% and that of the vinyl greenhouse by 14%. Since there is no standard construction estimate suitable for greenhouses, the wage unit price is set excessively, and the construction cost of the smart greenhouse is increasing. In conclusion, it is necessary to establish greenhouse structural code and greenhouse construction estimate to lower the greenhouse construction cost.
본 연구는 강구조물의 실시설계 단계에서 브레이스 접합부의 구조설계 및 BIM 모델링의 효율성을 제고하기 위한 것으로 브레이스 접합부의 구조설계 인터페이스 모듈 개발을 목적으로 한다. 이를 위하여 국내 외의 구조설계기준을 분석하여 알고리즘을 작성하고 이를 바탕으로 구조설계모듈을 구축하였다. 또한 BIM 설계 도구와 연동하여 모델 데이터로부터 구조설계를 수행하기 위한 입 출력 데이터를 자동으로 생성하며, 구조설계 결과로부터 BIM 모델을 자동으로 생성할 수 있는 인터페이스 모듈을 개발하였다. 예제 모델을 통해 개발된 모듈의 효율성과 실용성을 검증하였다.
New generation of tall and complex buildings systems are now introduced that are reflective of the latest development in materials, design, sustainability, construction, and IT technologies. While the complexity in design is being overcome by the availability and advances in structural analysis tools and readily advanced software, the design of these buildings are still reliant on minimum code requirements that yet to be validated in full scale. The involvement of the author in the design and construction planning of Burj Khalifa since its inception until its completion prompted the author to conceptually develop an extensive survey and real-time structural health monitoring program to validate all the fundamental assumptions mad for the design and construction planning of the tower. The Burj Khalifa Project is the tallest structure ever built by man; the tower is 828 meters tall and comprises of 162 floors above grade and 3 basement levels. Early integration of aerodynamic shaping and wind engineering played a major role in the architectural massing and design of this multi-use tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria established at the onset of the project design. Understanding the structural and foundation system behaviors of the tower are the key fundamental drivers for the development and execution of a state-of-the-art survey and structural health monitoring (SHM) programs. Therefore, the focus of this paper is to discuss the execution of the survey and real-time structural health monitoring programs to confirm the structural behavioral response of the tower during construction stage and during its service life; the monitoring programs included 1) monitoring the tower's foundation system, 2) monitoring the foundation settlement, 3) measuring the strains of the tower vertical elements, 4) measuring the wall and column vertical shortening due to elastic, shrinkage and creep effects, 5) measuring the lateral displacement of the tower under its own gravity loads (including asymmetrical effects) resulting from immediate elastic and long term creep effects, 6) measuring the building lateral movements and dynamic characteristic in real time during construction, 7) measuring the building displacements, accelerations, dynamic characteristics, and structural behavior in real time under building permanent conditions, 8) and monitoring the Pinnacle dynamic behavior and fatigue characteristics. This extensive SHM program has resulted in extensive insight into the structural response of the tower, allowed control the construction process, allowed for the evaluation of the structural response in effective and immediate manner and it allowed for immediate correlation between the measured and the predicted behavior. The survey and SHM programs developed for Burj Khalifa will with no doubt pioneer the use of new survey techniques and the execution of new SHM program concepts as part of the fundamental design of building structures. Moreover, this survey and SHM programs will be benchmarked as a model for the development of future generation of SHM programs for all critical and essential facilities, however, but with much improved devices and technologies, which are now being considered by the author for another tall and complex building development, that is presently under construction.
Lim, Jinkang;Lee, Jaewook;Lee, Seunghye;Kim, Han Soo;Jung, Sungwon
한국BIM학회 논문집
/
제5권4호
/
pp.37-46
/
2015
In a construction project, collaboration amongst the project participants is a critical factor for high-quality results and successful completion of the project. Owing to the advance of information technologies, web-based systems have become more common in the construction industry, but research and development has been made for only limited areas. For organized and systematic collaboration in various fields, collaboration systems have to be developed in a holistic manner based on diverse needs from the whole construction industry. This study aims to investigate the current status of web-based collaboration systems from structural engineers' perspectives and propose an improvement plan. For a systematic analysis of selected cases, we apply a classification of three developmental stages depending on interoperability and organizational levels: structural design and analysis, collaborative design, and integrated design management. Thereafter, the characteristics of each stage are extracted and comparatively analyzed. Lastly, three functional factors were proposed for the improvement of web-based collaboration systems for structural design.
본 연구에서는 가상건설시스템 개발 연구를 통해 구축된 BIM 기반 구조설계 프로세스와 개발 시스템을 적용하여 오피스 건물을 대상으로 사례 연구를 수행하였으며, 그 결과로부터 프로세스 및 개발 시스템의 적용에 따른 업무의 생산성과 경제성을 평가하였다. 사례 연구는 강구조를 주요 대상으로 하여, 구조해석모델 및 기본설계도서를 시작으로 기본실시모델과, 실시구조모델의 생성을 단계적으로 수행하였으며, 완성된 실시구조모델을 IFC를 이용하여 통합모델을 구축하여 다양한 BIM 설계도구와의 상호운용성을 검토하였다. BIM 프로세스를 구축하여 업무환경을 효율적으로 개선할 수 있었고, 접합부 모델링 자동화로 업무의 생산성을 향상시킬 수 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.