• Title/Summary/Keyword: storm hydrograph

Search Result 72, Processing Time 0.031 seconds

Flood Runoff Analysis of Small River Basin using Geographic Information System (지리정보시스템을 이용한 소하천유역의 홍수유출 해석)

  • Lee, Yeon-Kil;Park, Sung-Chun;Lee, Kwan-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.1
    • /
    • pp.24-36
    • /
    • 2003
  • Many rainfall-runoff model, which is applied discharge calculation for effective water-resource planning and management needs topographic and parameter of basin character. But it is very difficult to apply real a phase. Accordingly in this study filling up these problems. Applying GIS(geographic information system) through environment creating input data or concerning with GIS and rainfall runoff model. We built environment that analyze hydrograph showing discharge variation by time. GIS software for constructing input data is used by ArcView. For analysis of hydrograph in Basin, TOPMODEL applied topographic index. Besides for estimate of appliance to rainfall-runoff model, simple storm event and complex storm event are applied rainfall data which was before.

  • PDF

Estimation of Synthetic Unit Hydrograph by Cluster Analysis Using Geomorphic Characteristics of Mid-size Watershed (지형학적 인자에 따라 군집화된 중소규모유역의 합성단위도법 제시)

  • Kim, Jin Gyeom;Kim, Jong min;Kang, Boosik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.439-449
    • /
    • 2016
  • The methodology of synthetic unit hydrograph using geomorphic characteristics was suggested. Six geomorphic components over 19 watersheds were used to estimate synthetic unit hydrograph and the test watersheds were classified into two groups on the basis of the area of $200km^2$. The regression formulas between standardized geomorphic characteristics for each group and peak quantities of specific streamflow and time of representative unit hydrograph were suggested and the Nash and the Clark unit hydrographs were derived. For verifying the derived unit hydrographs, the resulting hydrographs were compared with the ones using the existing Clark unit hydrographs based on the empirical parameter estimation for the 145 storm events during 2010 to 2011 for the additional six watersheds. The results showed the relatively higher performance over the existing synthetic unit hydrograph methods, which could be a contribution to the hydrologic estimation in ungauged watersheds.

Comparing of Hydrograph Separation in deciduous and coniferous catchments using the End-Member Mixing Analysis (End-Member Mixing Analysis를 이용한 산림 소유역의 임상별 유출분리 비교)

  • Kim, Su-Jin;Choi, Hyung Tae
    • Journal of The Geomorphological Association of Korea
    • /
    • v.23 no.1
    • /
    • pp.77-85
    • /
    • 2016
  • To understand the difference of runoff discharge processes between Gwangneung deciduous and coniferous forest catchments, we collected hydrological data (e.g., precipitation, soil moisture, runoff discharge) and conducted hydrochemical analyses in the deciduous and coniferous forest catchments in Gwangneung National Arboretum in the northwest part of South Korea. Based on the end-member mixing analysis of the three storm events during the summer monsoon in 2005, the hillslope runoff in the deciduous forest catchment was higher 20% than the coniferousforest catchment during the firststorm event. Howerver, hillslope runoff increased from the second storm event in the coniferous catchment. We conclude that low soil water contents and topographical gradient characteristics highly influence runoff in the coniferous forest catchment during the first storm events. In general, coniferous forests are shown high interception loss and low soil moisture compared to the deciduous forests. It may also be more likely to be a reduction in soil porosity development when artificial coniferous forests reduced soil biodiversity. The forest soil porosity is an important indicator to determine the water recharge of the forest. Therefore, in order to secure the water resources, it should be managed coniferous forests for improving soil biodiversity and porosity.

Real-time Flood Forecasting Model Based on the Condition of Soil Moisture in the Watershed (유역토양수분 추적에 의한 실시간 홍수예측모형)

  • 김태철;박승기;문종필
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.5
    • /
    • pp.81-89
    • /
    • 1995
  • One of the most difficult problem to estimate the flood inflow is how to understand the effective rainfall. The effective rainfall is absolutely influenced by the condition of soil moisture in the watershed just before the storm event. DAWAST model developed to simulate the daily streamflow considering the meteologic and geographic characteristics in the Korean watersheds was applied to understand the soil moisture and estimate the effective rainfall rather accurately through the daily water balance in the watershed. From this soil moisture and effective rainfall, concentration time, dimensionless hydrograph, and addition of baseflow, the rainfall-runoff model for flood flow was developed by converting the concept of long-term runoff into short-term runoff. And, real-time flood forecasting model was also developed to forecast the flood-inflow hydrograph to the river and reservoir, and called RETFLO model. According to the model verification, RETFLO model can be practically applied to the medium and small river and reservoir to forecast the flood hydrograph with peak discharge, peak time, and volume. Consequently, flood forecasting and warning system in the river and the reservoir can be greatly improved by using personal computer.

  • PDF

Estimation of initial abstraction to calculate effective rainfall by considering soil moisture content in watershed (유역 토양 수분량을 고려한 초기손실 추정)

  • Lee, Jung-Sun;Lee, Dong-Hyun;Kim, Tai-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.245-248
    • /
    • 2002
  • The Soil Conservation Service (SCS) developed a unique procedure for estimating direct runoff from storm rainfall. But, It is very difficult to estimate accurately flood hydrograph by SCS method, because the initial ion of Ia(0.2Sa) itself has lots of systematic errors and there is no investigation on Ia in the Korean watershed. The maximum storage capacity of Umax is calibrated in the DAWAST model and is related to the present ability of rainfall to be infiltrated into the unsaturated soil. Effective rainfall for design and real-time flood hydrograph can be estimate more reasonably by introducing new Ia relationship made from the rainfall-runoff data observed in the Korean watersheds.

  • PDF

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Evaluation of the Clark Unit Hydrograph Parameters Considering Basin and Meteorologic at Conditions : 1. Selection and Analysis of Representative Storm Events (유역 및 기상상태를 고려한 Clark 단위도의 매개변수 평가: 1. 대표 호우사상의 선정 및 분석)

  • Yoo, Chul-Sang;Kim, Kee-Wook;Lee, Ji-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.2 s.175
    • /
    • pp.159-170
    • /
    • 2007
  • This study evaluated the parameters of Clark unit hydrograph (UH) estimated using the rainfall-runoff measurements and evaluated their variability. This also includes the quantification of basin and meteorological factors using probability density functions, selection of storm events with mean affecting factors, and derivation of average parameters of the Clark UH from storm events selected. Summarizing the results from this procedure are as follows. (1) It is not easy to avoid much uncertainty on the decision of runoff characteristics (that is, the concentration time and storage coefficient) even with some rainfall-runoff events are available. (2) As the distribution function of concentration time is very skewed, a simple arithmetic mean may lead a biased estimate. That is, the arithmetic mean based on the normal distribution can not be representative anymore. The mode may well be the representative in this case. On the other hand, the storage coefficient shows a symmetric distribution function, so the arithmetic mean may be used use for its representative. For the basin in this study, the concentration time in this study is estimated to be about 7 hours, and the storage coefficient about 22 hours.

A Derivation of the Representative Unit Hydrograph from Multiperiod Complex Storm by Linear Programming (선형계획법(線型計劃法)에 의한 대표단위도(代表單位圖) 유도(誘導))

  • Kwon, Oh Hun;Ryu, Tae Sang;Yoo, Ju Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.2
    • /
    • pp.173-182
    • /
    • 1993
  • This paper presents an algorithm to derive the representative unit hydrograph for the real environment of a watershed. For a given watershed, the conventional methods give several different unit hydrographs by storm events. In this study the LP model is somewhat modified based on the previous study by Mays et also as follows: the objective function is designed to minimize the sum of weighted residuals. An additional constraint of moving average is added to prevent the unit hydrograph from the occurence of oscillation which was not active in Mays's paper. Configuration of rainfall matrix was improved to reduce its dimension in accordance with Diskin's review point. In spite of the superiority of LP approach in terms of representativeness, all the methods were very sensitive to the validity of baseflow separation and rainfall-loss. Several methods of the separations for rainfall excesses and direct runoffs were applied and no preferred methods were identified. This is the matter of judgement considering catchment and rainfall characteristics. This algorithm was applied to a real watershed of the Wi stream in the Nak-dong river. Compared with the IHP results by conventional methods, this optimized representative unit hydrograph demonstrated relatively smaller and shorter values in terms of the peak discharge and the basin lag respectively, and the oscillation of its falling limb successfully eliminated owing to the additional constraints of moving averages.

  • PDF

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

Estimation of Design Flood Runoff in Ungaged Forest Watershed to Reduce Flood Damage within the National Park (국립공원내 홍수피해 저감을 위한 미계측 산림지역의 설계홍수량 추정)

  • Kim, Sang-Min;Im, Sang-Jun;Lee, Sang-Ho;Kim, Hyung-Ho;Ma, Ho-Seop;Jeong, Won-Ok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.107-113
    • /
    • 2009
  • The purpose of this study is to estimate the design flood runoff for ungaged forest watershed to reduce the flood damage in national park. Daewonsa watershed in Jirisan National Park was selected as study watershed, of which characteristic factors were obtained from GIS data. Flood runoff was simulated using SCS unit hydrograph module in HEC-HMS model. SCS Curve Number (CN) was calculated from forest type area weighted average method. Huff's time distribution of second-quartile storm of the Sancheong weather station, which is nearest from study watershed, was used for design flood runoff estimation. Critical storm duration for the study watershed was 3 hrs. Based on the critical duration, the peak runoff for each sub-watershed were simulated. It is recommended to monitor the long-term flow data for major stream stations in National Park for a better reliable peak runoff simulation results.