• Title/Summary/Keyword: start-up transformer

Search Result 8, Processing Time 0.033 seconds

A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method (최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구)

  • Choe, Gyu-Sik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod (FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구)

  • Che, Gyu-Shik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.5
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF

Start-up Control of LLC Resonant Inverter for Microwave Oven Application (전자레인지용 LLC 공진형 인버터의 기동 제어)

  • Kang, Kyelyong;Kim, Heung-Geun;Cha, Honnyong
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.22 no.5
    • /
    • pp.463-468
    • /
    • 2017
  • One of the most critical part for magnetron driving in microwave oven is start-up control. For this, switching frequency of resonant inverter should be carefully controlled in order to supply sufficient power to the filament of the magnetron and to prevent rectifier diode from destruction caused by the excessive voltage across them. This paper proposes a novel start-up control strategy for LLC resonant inverter for microwave oven considering the non-oscillation mode time and the magnetron voltage during the start-up process. The validity of the proposed method is verified through the experiment with 1,200W microwave oven using LLC resonant inverter.

The Neural-Fuzzy Control of a Transformer Cooling System

  • Lee, Jong-Yong;Lee, Chul
    • International Journal of Advanced Culture Technology
    • /
    • v.4 no.2
    • /
    • pp.47-56
    • /
    • 2016
  • In transformer cooling systems, oil temperature is controlled through the use of a blower and oil pump. For this paper, set-point algorithms, a reset algorithm and control algorithms of the cooling system were developed by neural networks and fuzzy logics. The oil inlet temperature was set by a $2{\times}2{\times}1$ neural network, and the oil temperature difference was set by a $2{\times}3{\times}1$ neural network. Inputs used for these neural networks were the transformer operating ratio and the air inlet temperature. The inlet set temperature was reset by a fuzzy logic based on the transformer operating ratio and the oil outlet temperature. A blower was used to control the inlet oil temperature while the oil pump was used to control the oil temperature difference by fuzzy logics. In order to analysis the performance of these algorithms, the initial start-up test and the step change test were performed by using the dynamic model of a transformer cooling system. Test results showed that algorithms developed for this study were effective in controlling the oil temperature of a transformer cooling system.

Signal Amplifying Gate Driver of Self-Excited Electronic Ballast for High Pressure Sodium (HPS) Lamp (고압 나트륨램프용 자려식 전자식 안정기의 신호 증폭형 게이트 구동회로)

  • Young, Yong-Sik;Cho, Gyu-Hyeong
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1304-1306
    • /
    • 1996
  • A regenerative signal amplifying gate driver of self-excited electronic ballast is presented. It can be used for high pressure sodium (HPS) lamp without auxiliary external ignitor. Since the HPS lamp requires very high ignition voltage at start up, the resonant frequency of the circuit must be increased to obtain high voltage oscillations in spite of relatively small resonant current. The presented gate driver amplifies the current of gate drive transformer and raises the gate-source voltage Quickly to turn on the MOSFET switches. Hence, the resonant frequency can be increased more than 100kHz. The HPS lamp used in the simulation and experiment has the rating of 400W input power at 220V input ac voltage source. The experiments show that the resonant frequency is above 150kHz at start up.

  • PDF

Primary Restorative Transmission Line Selection for Myanmar's Electric Power System

  • Kim, Yong-Hak;Song, In-Jun;Jang, Byung-Tae;An, Yong-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.2
    • /
    • pp.191-196
    • /
    • 2010
  • Power system restoration following a massive or complete blackout starts with energizing the primary restorative transmission system. During this primary restoration process, unexpected overvoltage may happen due to nonlinear interaction between the unloaded transformer and the transmission system. In the case of the Myanmar electric power system, there are so many wide outage experiences, including complete blackout cases, caused by 230kV line faults and so on. Consequently, Myanmar's system operators have been well trained to deal with wide blackouts. Howver, system blackout restoration has been conducted by relying on the experience of only a few specialists. So, more scientific analysis is required to meet the requirements necessary to ensure fast and reliable system restoration. This paper presents analytical results on the primary restorative transmission system of Myanmar, focusing on the problems during the early restoration process. Methodologies are presented that handle load pick-up, terminal voltage and the reactive capability limitation of black-start generators to compensate the Ferranti effect. Static and dynamic simulation with the PSSolution and EMTDC programs respectively for the six cases are performed in order to select the primary restorative transmission lines.

Analysis of Impact on Voltage Stability by Starting Synchronous Condenser in Jeju AC Network (제주계통에서 동기조상기 기동에 따른 전압안정도 영향 검토)

  • Choi, Soon-Ho;Lee, Seong-Doo;Kim, Chan-Ki
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.23-28
    • /
    • 2015
  • Two old synchronous condensers in Jeju are being replaced by new machines to operate Jeju AC network with Haenam-Jeju HVDC system stably. Before new synchronous condensers operate on site, voltage stability analysis is conducted to verify stable operation of jeju AC network. Through impedance analysis of the synchronous machine, transformer and ac network, the equivalent circuit is constructed and the voltage drop during start-up is calculated. Then, PSS/E fault analysis is performed to acquire short-circuit capacity according to the generator operation scenarios. Voltage variation when starting synchronous condenser is simulated in PSCAD/EMTDC and satisfies the operating condition of jeju AC network and HVDC #1 system.

Three-Phase ZVS DC-DC Converter with Low Transformer Turn Ratio for High Step-up and High Power Applications (낮은 변압기 턴비를 갖는 고승압.대전력용 3상 ZVS DC-DC컨버터)

  • Kim, Joon-Geun;Park, Chan-Soo;Choi, Se-Wan;Park, Ga-Woo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.16 no.3
    • /
    • pp.242-249
    • /
    • 2011
  • The proposed converter has easy device selection for high step-up and high power applications since boost half bridge and voltage doubler cells are connected, respectively, in parallel and series in order to increase output power and voltage. Especially, optimized design of high frequency transformers is possible owing to reduced turn ratio and eliminated dc offset, and distributed power through three cores is beneficial to low profile and thermal distribution. The proposed converter does not necessitate start-up circuit and additional clamp circuit due to the use of whole duty range between 0 and 1 and is suitable for applications with wide input voltage range. Also, high efficiency can be achieved since ZVS turn on of switches are achieved in wide duty cycle range and ZCS turn on and off of diodes are achieved. The proposed converter was validated through 5 kW prototype.