• Title/Summary/Keyword: standard work time.

Search Result 552, Processing Time 0.031 seconds

Korean Maintainability Prediction Methodology Reflecting System Complexity (시스템 복잡도를 반영한 한국형 정비도 예측 방법론)

  • Kwon, Jae-Eon;Hur, Jang-Wook
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.4
    • /
    • pp.119-126
    • /
    • 2021
  • During the development of a weapon system, the concept of maintainability is used for quantitatively predicting and analyzing the maintenance time. However, owing to the complexity of a weapon system, the standard maintenance time predicted during the system's development differs significantly from the measured time during the operation of the equipment after the system's development. According to the analysis presented in this paper, the maintenance time can be predicted by considering the system's complexity on the basis of the military specifications, and the procedure can be Part B of Procedure II and Method B of Procedure V. The maintenance work elements affected by the system complexity were identified by the analytic hierarchy process technique, and the system-complexity-reflecting weights of the maintenance work elements were calculated by the Delphi method, which involves expert surveys. Based on MIL-HDBK-470A and MIL-HDBK-472, it is going to present a Korean-style maintainability prediction method that reflects system complexity of weapons systems.

A Study on Work Measurement System Development Applying MODAPTS Technique (MODAPTS 기법을 이용한 작업시간 관리시스템에 관한 연구)

  • 신현표;송한상
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.27
    • /
    • pp.43-49
    • /
    • 1993
  • The purpose of this study is to develope a computer-generated work measurement system for creating and maintaining standard data as well as labor standards applying MODAPTS(Modular Arrangement of Predetermined Time Standards) technique. The system consists of three major parts. The first part is a work measurement program applying MODAPTS technique for work standards. The second part is a work scheduling program which calculate each operator's machine and job allocations, operation and load schedules, wage and wage incentives and direct labor costs etc. The last part is the case study application program for R-Instrument Manufacturing Industry. The whole system is programmed by dbase-Ⅲ and by pop-up mu for IBM PC compatibles.

  • PDF

Clinical Pathway Verification through Process Mining

  • Jung, Jong-Duk;Kim, Suk-Hoon;Yeo, Hyun-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.4
    • /
    • pp.115-120
    • /
    • 2018
  • A Clinical Pathway(CP) is standard process to way of treat diseases or injuries which is adapted to each hospital based on National Clinical Practice Guideline(CPG). Since CP is standard guideline for doctors and nurses working in a hospital, making and modifying CP is one of the most important administrational work for hospital and also rare work because once it is fixed, it's not changed whether there are new kind of disease discovered or new treatment is developed. However, in present, patient's waiting time during hospital residence process, is discussed as service competitive for patients. In this research, we utilize process mining tool to verify patients treatment process follows CP with EMR(Electronic Medical Record) in a sample hospital, and suggest modifcation point of CP through verification.

Work smart development framework based service scenarios (중소기업 스마트워크 표준화 추진방향)

  • Min, J.H.;Park, J.Y.;Kang, S.G.
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.10a
    • /
    • pp.811-814
    • /
    • 2014
  • There is increasing interest in the introduction of smart work as a flexible working form to perform a task without restrictions of time and place by using the information and communication technology as a creative innovative capacity has become an important element of enterprise competitiveness. However, because of the lack of understanding about smart work and concrete practices, most local SMEs are staying at the beginning of introducing the smart work. It is required to provide the standard of a smart work common structure and interface to quickly develop smart work services in a standardized way for SMEs and promote the deployment of the smart work in this environment. In this paper, we present standard development directions for the smart work service common structure and component interface to develop specialized services according to the size, the purpose and the needs of local SMEs.

  • PDF

Optimum Blind Control to Prevent Glare Considering Potential Time Error (잠재적 시간 오차에 따른 현휘의 발생 방지를 위한 최적 블라인드 제어)

  • Seong, Yoon-Bok
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.2
    • /
    • pp.74-86
    • /
    • 2012
  • For the improvement of environmental comfort in the buildings with the blind control, the objective of this study is to prevent the direct glare caused by the daylight inlet. During the process of solar profile prediction, time are significant factors that may cause error and glare during the blind control. This research proposes and evaluates the correction and control method to minimize prediction error. For the local areas with different longitude and local standard meridian, error occurred in the process of the time conversion from local standard time to apparent solar time. In order to correct error in time conversion, apparent solar time should be recalculated after adjusting the day of year and the equation of time. To solve the problems by the potential time errors, control method is suggested to divide the control sections using the calibrated fitting-curve and this method is verified through simulations. The proposed correction and control method, which considered potential time errors by loop lop leap years, could solve the problems about direct glare caused by daylight inlet on the work-plane according to the prediction errors of solar profile. And also these methods could maximize daylight inlet and solar heat gain, because the blocked area on windows could be minimized.

Relation between Multiple Markers of Work-Related Fatigue

  • Volker, Ina;Kirchner, Christine;Bock, Otmar L.
    • Safety and Health at Work
    • /
    • v.7 no.2
    • /
    • pp.124-129
    • /
    • 2016
  • Background: Work-related fatigue has a strong impact on performance and safety but so far, no agreed upon method exists to detect and quantify it. It has been suggested that work-related fatigue cannot be quantified with just one test alone, possibly because fatigue is not a uniform construct. The purpose of this study is therefore to measure work-related fatigue with multiple tests and then to determine the underlying factorial structure. Methods: Twenty-eight employees (mean: 36.11; standard deviation 13.17) participated in five common fatigue tests, namely, posturography, heart rate variability, distributed attention, simple reaction time, and subjective fatigue before and after work. To evaluate changes from morning to afternoon, t tests were conducted. For further data analysis, the differences between afternoon and morning scores for each outcome measure and participant (${\Delta}$ scores) were submitted to factor analysis with varimax rotation and each factor with the highest-loading outcome measure was selected. The ${\Delta}$ scores from tests with single and multiple outcome measures were submitted for a further factor analysis with varimax rotation. Results: The statistical analysis of the multiple tests determine a factorial structure with three factors: The first factor is best represented by center of pressure (COP) path length, COP confidence area, and simple reaction time. The second factor is associated with root mean square of successive difference and useful field of view (UFOV). The third factor is represented by the single ${\Delta}$ score of subjective fatigue. Conclusion: Work-related fatigue is a multidimensional phenomenon that should be assessed by multiple tests. Based on data structure and practicability, we recommend carrying out further studies to assess work-related fatigue with manual reaction time and UFOV Subtest 2.

Safe Speed Limit of Robot Arm During Teaching and Maintenance Work (로보트 교시.정비작업시의 안전속도한계)

  • 김동하;임현교
    • Journal of the Korean Society of Safety
    • /
    • v.8 no.1
    • /
    • pp.64-70
    • /
    • 1993
  • Serious injuries and deaths due to multi-jointed robot occur when a man mispercepts. especially during robot teaching and maintenance work. Since industrial robots often operate with unpredictable motion patterns, establishment of safe speed limit of robot arm is indispensable. An experimental emergency conditions were simulated with a multi-jointed robot. and response characteristics of human operators were measured. The result showed that failure type, robot arm axis. and robot arm speed had significant effects on human reaction time. The reaction time was slightly increased with robot arm speed. though it showed somewhat different pattern owing to failure type. Furthermore the reaction time to the axis which could flex or extend. acting on a workpiece directly. was fastest and its standard deviation was small. The robot arm speed limit securing a‘possible contact zone’based on overrun distance was about 25cm/sec. and in this sense the validity of safe speed limits suggested by many precedent researchers were discussed.

  • PDF

Detection of Complaints of Non-Face-to-Face Work before and during COVID-19 by Using Topic Modeling and Sentiment Analysis (동적 토픽 모델링과 감성 분석을 이용한 COVID-19 구간별 비대면 근무 부정요인 검출에 관한 연구)

  • Lee, Sun Min;Chun, Se Jin;Park, Sang Un;Lee, Tae Wook;Kim, Woo Ju
    • The Journal of Information Systems
    • /
    • v.30 no.4
    • /
    • pp.277-301
    • /
    • 2021
  • Purpose The purpose of this study is to analyze the sentiment responses of the general public to non-face-to-face work using text mining methodology. As the number of non-face-to-face complaints is increasing over time, it is difficult to review and analyze in traditional methods such as surveys, and there is a limit to reflect real-time issues. Approach This study has proposed a method of the research model, first by collecting and cleansing the data related to non-face-to-face work among tweets posted on Twitter. Second, topics and keywords are extracted from tweets using LDA(Latent Dirichlet Allocation), a topic modeling technique, and changes for each section are analyzed through DTM(Dynamic Topic Modeling). Third, the complaints of non-face-to-face work are analyzed through the classification of positive and negative polarity in the COVID-19 section. Findings As a result of analyzing 1.54 million tweets related to non-face-to-face work, the number of IDs using non-face-to-face work-related words increased 7.2 times and the number of tweets increased 4.8 times after COVID-19. The top frequently used words related to non-face-to-face work appeared in the order of remote jobs, cybersecurity, technical jobs, productivity, and software. The words that have increased after the COVID-19 were concerned about lockdown and dismissal, and business transformation and also mentioned as to secure business continuity and virtual workplace. New Normal was newly mentioned as a new standard. Negative opinions found to be increased in the early stages of COVID-19 from 34% to 43%, and then stabilized again to 36% through non-face-to-face work sentiment analysis. The complaints were, policies such as strengthening cybersecurity, activating communication to improve work productivity, and diversifying work spaces.

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.