• Title/Summary/Keyword: stabilizing pile

Search Result 34, Processing Time 0.019 seconds

Mechanical and Hydraulic Stabilizing Method of Steel Pipe Propulsion Tunneling Using Liquid Nitrogen (액체질소를 이용한 강관압입공법의 역학적 수리학적 안정화공법)

  • Ji, Subin;Lee, Kicheol;Lee, Ju-hyung;Kim, Dongwook
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.3
    • /
    • pp.57-66
    • /
    • 2016
  • In this study, to prevent possible collapse caused by hydraulic or mechanical instability, liquid nitrogen injection method is developed and implemented at the tip of drilling auger of steel pipe propulsion tunneling. In this study, 1/5-scale model auger and sand chamber were manufactured. The prototype diameter of steel pile (or casing) is assumed about 1,000 mm. For the frictional sandy soils and plastic weathered soils, liquid nitrogen injection methods were tested varying water contents of the soils. For the induced hydraulic instability, the ground near the drilling auger was frozen within approximately 5 minutes preventing mechanical collapse and water infiltration. Securing stability of steel pile propulsion tunneling using liquid nitrogen was much more effective for which the water content of the soil somewhat exceeds the optimum water content.

Analysis of the Correlation between the velocity speed of High-Speed Railways and the Suppressing Effect of lateral Displacement of retaining wall according to the Arrangement of Stabilizing Piles (억지말뚝의 배치에 따른 흙막이의 수평변위 억제효과와 고속철도의 속도와의 상관성 분석)

  • Son, Su-Won;Im, Jong-Chul;Seo, Min-Su;Hong, Seok-Woo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2021
  • In urban areas, structures are installed deep underground in the lower part of the structure to utilize space. Therefore, a retaining wall is used to prevent earth pressure from the ground when constructing a structure. Due to the development of construction technology, retaining wall applied to excavation work are used to prevent danger such as falling rocks and landslides in temporary facilities when construction or retaining walls are installed. In general, the application of a retaining wall to a temporary facility during the embankment construction is the case of expanding an existing roads or railways. Therefore, it is necessary to study the retaining wall applied to the embankment construction such as the double-track site of the high-speed railway. In this study, two types of common one row H-pile retaining wall and two types of IER retaining wall were analyzed, and the stability of the retaining wall applied to the construction of double-track of the high-speed railway was analyzed. The earth retaining wall is a construction method that combines forced pile applied to the stabilization of the slope with the wall of the earth retaining wall. As a result of the analysis, the IER retaining wall had maximum lateral displacement of 19.0% compared to the type with H-plie installed only in the front while dynamic load was applied. In addition, the slower the speed of high-speed railway, the more displacement occurred, and the results show that more caution is needed when designing the ground in low-speed sections.

Study on the Optimal Construction Method for the Compaction Method of Hydraulic Filling in Metropolitan Areas (도심지 물다짐 공법의 적정 시공방법에 관한 연구)

  • Jeong, Dal-Yeong;Jang, Jong-Hwan;Chung, Jin-Hyuck
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.175-181
    • /
    • 2020
  • This paper suggests a proper hydraulic filling method in downtown areas. Road subsidence on roadways and sidewalks in downtown areas can result in vehicle damage and casualties. The representative cause of road subsidence is the fraudulent construction in nearby construction sites. A deficiency of excavation restoration causes approximately 25~49% of subsidence. This is performed by equipment or manpower. Hydraulic filling is used in backfilling narrow pipe conduits and spaces between structures. On the other hand, standard specifications and quality assurance standards regarding hydraulic filling principles and construction conditions are insufficient. Therefore, in-door model experiments on hydraulic filling principles, backfilling material, and compaction efficiency were performed. This paper suggests guidelines by investigating and analyzing construction status. In conclusion, thrown backfilling material has a particle size distribution and permeability coefficient as major factors, and detailed standards of the factors are suggested. To improve the compaction efficiency, 90% or more, compaction by the floor should be in units of 0.3m while ensuring a lower drainage layer. When an H-shape stabilizing pile is pulled out after filling, additional hydraulic filling should be in the disturbance range.

Fundamental Studies on Stabilization of Shallow Slope Failure Using Lime Pile - Changes of Clayey Properties with Lime Addition - (생석회 파일을 이용한 얕은 사면 파괴의 안정화에 대한 기초 연구 - 생석회 첨가에 따른 점성토의 특성 변화 중심으로 -)

  • Kwon, Moonam;Goo, Jeungmin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.5
    • /
    • pp.49-55
    • /
    • 2006
  • Quick lime made from limestone that are deposited abundantly in Korea has excellent potentials for stabilization of clayey soils. If Korea is able to take advantage of its abundant supply, economical efficiency could be achieved through mass production as well as being able to take advantage of utilization of natural resources. For stabilizing of clayey soil with lime, it is necessary to determine the required quantities of lime firstly and to evaluate the degree of stabilization with lime content. In this test, the quantity of lime required for 2 clayey soils which located in Seunggok and Bugok province respectively, and for 2 clay minerals-kaolinite and montmorillonite-were determined by ASTM C 977-92 and were evaluated for solidification of each samples with changing lime contents by Atterberg limit test and pH test. It was also evaluated for the improvement of each sample with lime content and curing time. The sample which added lime content determined by ASTM C 977-92 increased plastic limit, unconfined compression strength, and decreased pH in increasing trend.

  • PDF