• Title/Summary/Keyword: spillway

Search Result 163, Processing Time 0.032 seconds

Evaluation on the leakage of ground-water through fractured rock under a spillway (여수로 구조물 하부 암반 내 발달한 절리들을 통한 지하수 누수량 분석)

  • Kim, Hyoung-Soo;Lee, Ju-Hyun;Jeong, Ui-Jin;Lee, Joong-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.69-74
    • /
    • 2006
  • Recently, spillways are need to control stable water level for supporting main dams because of floods by unusual change of weather such as Typhoon Rusa. This study has been focused on the amount of leakage through the rock mass distributed fractures and joints under the opened emergency spillway. It is very important to evaluate the amount of leakage as these affect stability of spillway by interaction between effective stress and pore pressure. The commercial program MAFIC has been used for analyzing groundwater flow in fractured rock mass. The results showed that the values of range, average and deviation of leakage were $2.85\sim\;3.79\times10^{-1}$, $3.32\times10^{-1}$ and $1.70\times10^{-2}\;m^3/day/m^2$ respectively. Secondary, we have estimated the effect of grouting after the transmissivity$(T_f)$ of joint 1 as main pathway of leakage known from above results was changed from $1.78\times10^{-7}$ to $1.59\times10^{-9}\;m^2/s$. The results showed that the values of range, average and deviation of leakage were $7.80\times10^{-4}\sim1.53\times10^{-3}$, $1.18\times10^{-3}$ and $1.32\times10^{-4}\;m^3/day/m^2$ respectively. As the result, the amount of leakage after grouting has been decreased by a ratio of 1 to 277.

  • PDF

Stability analysis of tunnel spillway under internal water pressure (내부수압이 작용하는 여수로터널의 안정성 검토)

  • Park, Inn-Joon;Park, Moo-Jong;Kim, Sung-In;Kwak, Chang-Won;Jang, Seo-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.63-72
    • /
    • 2005
  • The influence of internal water pressure under the Probable Maximum Flood (PMF) on tunnel spillway is analysed using 3D FDM analysis. HEC-RAS program including 1-D hydrologic numerical model was also implemented to estimate the maximum pressure on the lining under the PMF, thereafter determined rational internal water pressure. Tunnel spillway was designed as twin tunnel and excavation and supporting stage are fully considered. Analysis was classified into the 3 cases; pressure is applied only to the left tunnel, only to right tunnel, and to both tunnels. The maximum tensile stress and axial force in supporting materials induced by water flow were compared with the critical values to assess the stablilty of the tunnel and the locations of stress concentration parts were also examined.

  • PDF

Behavior of Failure on Agricultural Reservoirs Embankment by Riprap Reinforcement Method (Riprap으로 보강된 농업용 저수지 제체의 붕괴거동)

  • Lee, Dal Won;Noh, Jae Jin
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.6
    • /
    • pp.63-73
    • /
    • 2014
  • In this study, the large scale test was performed to investigate the behavior of failure on the embankment and spillway transitional zone by overtopping. The pore water pressure, earth pressure, settlement and failure behaviors according to several reinforcing method were compared and analyzed. The pore water pressure showed a small change in the spillway transition zone and core, indicating that the riprap and geotextile efficiently reinforced the embankment, but non-reinforcement showed a largely change in pore water pressure. The earth pressure by riprap and geotextile at upstream slope and bottom core increased rapidly with the infiltration of the pore water by overtopping. And the earth pressure at crest showed a smally change due to effect of the inclined core. A settlement by riprap showed a small change and the geotextile decreased a rapidly due to failure of crest. The width of failure by riprap at intermediate stage (50 min) showed a largely due to sliding of crest. But, the width and depth of the seepage erosion after the intermediate overtopping period (100 min) were very small due to the effect of riprap than geotextile and non-reinforcement which delayed failure. It has the effect that protect reservoir embankment from erosion in the central part. The pore water pressure at the spillway transition zone due to overtopping increased a rapidly in the case of non-reinforcement, but the reinforced methods by geotextile and riprap showed a smally change. Therefore, the reinforced method by riprap and geotextile was a very effective method to protect permanently and the emergency an embankment due to overtopping, respectively.

Two-Dimensional Flow Analysis of Approach Channel for the Design of Spillway Guidewall (여수로 유도벽 설계를 위한 접근수로의 2차원 흐름해석)

  • Lee, Gil-Seong;Kim, Nam-Il
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.491-501
    • /
    • 1998
  • Numerical simulations were performed to analyse the flow pattern of the approach channel and to design the spillway guidewall for stable flow conditions. RMA-2, two dimensional finite element model which can easily represent complicated geometry was used, and model parameters were estimated from the observation data of hydraulic model test. Numerical experiments were made separately for the approach region and for the upstream region, and upstream boundary position of the hydraulic model beyond which the boundary effects are negligible was determined from the numerical results. For the stable flow condition in approach channel, alternative designs for guidewall were developed, and flow analysis for alternative designs was done through the numerical simulation. From the analysis of alternative design, we can see that the flow pattern in the approach channel is stable and the lateral stage difference disappears mostly before the spillway crest.

  • PDF

A Study on Reconstruction Models of Side-channel Spillway for Discharge Capacity Improvement (측수로형 여수로의 홍수배제능력증대를 위한 월류부 개축방안에 관한 연구)

  • Park, Sae-Hoon;Moon, Young-Il
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.3
    • /
    • pp.9-18
    • /
    • 2007
  • The small and medium sized dams have the fill dam type of a lot of occasions, which are often weak in cases of major floods. For this reason, although a countermeasure is in great need, due to the importance of the facilities and financial situations, no direct safety measures have been taken. In this study, in order to minimize construction expenditure for practical safety measures in cases of major floods, the overflow section of spillway has been analyzed focusing on how the overflow capacity will increase in the case of partially rebuilding a part of the overflow section of spillway favorable for hydraulic conditions. The labyrinth weir and movable weir was chosen for reconstruction models of the overflow section. Moreover, for analyzing the after-effects of the reconstruction, a small scale dam was temporarily chosen for various experiments such as the hydraulic model testing and the three dimension numerical evaluation through the use of Flow-3D.

Overtopping Model Experiments and 3-D Seepage Characteristics of the Embankment of Deteriorated Homogeneous Reservoirs (노후화된 균일형 저수지 제체의 월류모형실험과 3차원 침투특성)

  • Lee, Young Hak;Lee, Tae Ho;Lee, Dal Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.2
    • /
    • pp.13-23
    • /
    • 2019
  • In this study, an overtopping model experiments and three dimensional seepage characteristics at the deteriorated homogeneous reservoirs were performed to investigate the behavior of failure for embankment and spillway transitional zone due to overtopping. The failure pattern, pore water pressure, earth pressure and settlement by overtopping were compared and analyzed. The pattern of the failure by overtopping was gradually enlarged towards reservoirs crest from the spillway transition zone at initial stage. In the rapid stage and peak stage, the width and depth of failure gradually increased, and the pattern of the failure appeared irregular and several direction of the erosion. In the early stage, the pore water pressure at spillway transitional zone was more affected as its variation and failure width increased. In the peak stage, the pore water pressure was significantly increased in all locations due to the influence of seepage. The earth pressure increased gradually according to overtopping stage. The pore pressure by the numerical analysis was larger than the experimental value, and the analysis was more likely to increase steadily without any apparent variation. The horizontal and vertical displacements were the largest at the toe of slope and at the top of the dam crest, respectively. The results of this displacement distribution can be applied as a basis for determining the position of reinforcement at the downstream slope and the crest. The collapse in the overtopping stage began with erosion of the most vulnerable parts of the dam crest, and the embankment was completely collapsed as the overtopping stage increased.

Numerical Investigation of Hydraulic Jump in a Spillway (여수로에서 도수 수치해석 연구)

  • Paik, Joongcheol;Ryu, Yong Uk;Lee, Nam-Ju
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.66-66
    • /
    • 2017
  • Hydraulic jump is typically designed to occur over low-haed dam spillways and weirs in the river. An important engineering application of the hydraulic jump is to dissipate the intense kinetic energy of the flows over such hydraulic structures. Turbulent flow and roller-like vortex riding up the free sureface of the jump cause most of the energy dissipation. We carry out a high resolution three-dimensional numerical simulations of a submerged hydraulic jump in a spillway and compare numerical results with a laboratory measurement obtained by the PIV. The numerical results further show the dynamic behavoirs of the inner and outer layers of the submerged wall-jet and the recirculating roller of the hydraulic jump.

  • PDF