• Title/Summary/Keyword: soil compaction

Search Result 640, Processing Time 0.032 seconds

Investigation of Stiffness Characteristics of Subgrade Soils under Tracks Based on Stress and Strain Levels (응력 및 변형률 수준을 고려한 궤도 흙노반의 변형계수 특성 분석)

  • Lim, Yujin;Kim, DaeSung;Cho, Hojin;Sagong, Myoung
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.386-393
    • /
    • 2013
  • In this study, the so-called repeated plate load bearing test (RPBT) used to get $E_{v2}$ values in order to check the degree of compaction of subgrade, and to get design parameters for determining the thickness of the trackbed foundation, is investigated. The test procedure of the RPBT method is scrutinized in detail. $E_{v2}$ values obtained from the field were verified in order to check the reliability of the test data. The $E_{v2}$ values obtained from high-speed rail construction sites were compared to converted modulus values obtained from resonant column (RC) test results. For these tests, medium-size samples composed of the same soils from the field were used after analyzing stress and strain levels existing in the soil below the repeated loading plates. Finite element analyses, using the PLAXIS and ABAQUS programs, were performed in order to investigate the impact of the strain influence coefficient. This was done by getting newly computed $I_z$ to get the precise strain level predicted on the subgrade surface in the full track structure; under wheel loading. It was verified that it is necessary to use precise loading steps to construct nonlinear load-settlement curves from RPBT in order to get correct $E_{v2}$ values at the proper strain levels.

A Study on the Improvement of a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 개선에 관한 연구)

  • Kim, Sung-Keun;Lim, So-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1063-1076
    • /
    • 2017
  • To improve the productivity of the earthwork, a fleet management system for construction equipment was suggested in previous studies. But there were some gaps between theory and practice. To overcome this problem, some opinions are gathered form experts and field engineers and four improvements have been proposed and reflected in the system. First, the previous system consists of one hardware module, so it is hard to install it at a control office and construction equipment at the same time. The server module for the office and the mobile module for construction equipment are separately developed. Second, the transportation algorithm that is used in the previous system can generate shortest paths for the earthwork distribution, but embankment areas are not gathered. This situation leads to a decrease in compaction productivity. A modified algorithm for earthwork distribution is suggested. Third, the automated coordinate transformation is performed to show the position of construction equipment on the 3D terrain in real-time. Fourth, construction equipment groups should be formed in the initial stage of earthwork and the number of equipment of each groups should be changed by operation status and site environment. But this functions did not work properly in the previous system. This problem is corrected in the proposed system. The improvements can make the proposed system much more realistic one and can leads to an increase in the productivity of earthwork operations.

Evaluation of Field Applicability of Pavement Materials Using Wood Chips (목재칩을 활용한 포장재의 현장 적용성 평가)

  • Lee, Jundae;Bang, Sungtak;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.11
    • /
    • pp.13-19
    • /
    • 2015
  • Construction materials using soil which is the most common material around us have many advantages, but their long-term durability and sensation of walking as pavements have problems. Therefore, they are used after compaction or mixed with various hardening agents such as lime and cement for strength enhancement. However, studies on the behavior of pavement materials mixed with environment-friendly hardening agents or admixtures to improve walking property are still insufficient. In this study, therefore, in order to evaluate the appropriate mixing ratio and field application characteristics of pavement materials using mixed soils with environment-friendly hardening agents and natural materials such as wood chips, mechanical tests were performed to evaluate the rational mixing ratios and the ball test was performed as an elasticity test to evaluate the field applicability. The results suggest that the content of wood chips should be selected at 1.5% or lower according to the purpose of the structure, and the hardening agent at 10~15%. The evaluation results for GB/SB coefficient ratio which indicates the walking property show that the appropriate mixing ratio of the hardening agent in terms of the sensation of walking is 15% of lower, but different mixing ratios should be chosen according to the proportion of wood chips.

Numerical Studies for the Safety Estimation of Box-Culvert in Levee (수치해석을 이용한 하천제방 배수통문의 안정성 평가 연구)

  • Kim Jin-Man;Choi Bong-Hyuck;Oh Se-Yong;Kim Kyung-Min
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.6 s.167
    • /
    • pp.479-486
    • /
    • 2006
  • In this study, 2-D seepage analysis is conducted for the evaluation of Box-Culvert installation, Cut-off Wall Length, permeability reduction of soil under the Box-Culvert effects on Levee Box-Culvert safety. The result of analysis it is obtained that the safety of seepage and slope stability of levee is declined by the installation of Box-Culver. And also obtained that the piping from poor compaction and cavity around Box-Culvert Is Prevented by the Cut-off wall installation below breast wall and levee toe, so it is recommended that the Cut-off Wall below breast wall and levee toe must be installed. And the Cut-off Wall installed below levee center is considered when the safety of piping is declined for the whole levee section. On the other hand, for the realistic analysis it is recommended that the 3-D seepage analysis is more suitable for the safety evaluation of Box-Culvert installed levee when it is considered that the saturated field is dispersed to the ground.

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (2) (필댐의 안정성 해석 연구 (II))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.189-207
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys and monitoring the buried geotechnical gauges, such as pore-pressure gauge, earth-pressure gauge, displacement gauge, multi-layer settlement gauge, leakage flow-meter, were conducted. In addition to these data, numerical analyses of behavior of dam were performed to predict and to compare the data which were obtained from the above methods. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geotechnical gauge data were also used to confirm the effects of reinforcement. Analyses of monitoring the data of geotechnical gauges buried in the dam, such as pore-pressure gauge, earth-pressure gauge, displacement gauge, multi-layer settlement gauge, and leakage flow-meter shows the load transfer of dam and the possibility of hydraulic fracturing. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF

Low-Cost CAP-type TDR Exploration Techniques for Leak Detection (누수탐지를 위한 저비용 CAP형 TDR 탐사기법)

  • Kim, Jin Man;Choi, Bong Hyuck;Cho, Jin Woo;Cho, Won Beom
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1479-1487
    • /
    • 2013
  • The river levee collapse and flood damages are dramatically increased due to the floods which caused by abnormal weather nowadays. The counterplan like TDR(Time Domain Reflectometry) river levee leaking exploration technique is needed to that levee failure causes of levee failure such as levee failure by penetration, piping, inadequate levee materials selection, poor compaction are almost 52% of the failure. This research practiced various comparing experiments of existing TDR(probe and tube types) and developing CAP type TDR to evaluate acrylic small CAP mould and low-cost TDR levee leaking monitoring system which was used probe type TDR. As the result, evaluated TDR system had 20cm critical exploration performance which was a leaking exploration performance, The functional ratio of TDR exploration sensitivity of dry density was sensitive more than 3 times than dry density, and weathered granite soil foundation water contents(w)-dielectric constant(${\epsilon}$) corelation formula was suggested to measure functional ratio on developing cap type TDR system.

Effects of Loading Method on the Behavior of Laterally Cyclic Loaded Piles in Sand (모래지반에서 재하방법이 반복수평하중을 받는 말뚝의 거동에 미치는 영향)

  • Paik, Kyu-Ho;Kim, Young-Jun;Lee, Seung-Yeon
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.3
    • /
    • pp.63-73
    • /
    • 2011
  • The behavior of laterally cyclic loaded piles is affected by the magnitude and number of cycles of cyclic lateral loads as well as loading method (1-way or 2-way loading). In this study, calibration chamber tests were carried out to investigate the effects of loading method of cyclic lateral loads on the behavior of piles driven into sand. Results of the chamber tests show that the permanent lateral displacement of 1-way cyclic loaded piles is developed in the same direction as the first loading, whereas that of 2-way cyclic loaded piles is developed in the reverse direction of the first loading. 1-way cyclic lateral loads cause a decrease of the ultimate lateral load capacity of piles, and 2-way cyclic lateral loads cause an increase of the ultimate lateral load capacity of piles. The change of ultimate lateral load capacity with loading method of cyclic lateral loads increases with increasing number of cycles. It is also observed that the 1-way cyclic loads generate greater maximum bending moment than 2-way cyclic loads for piles in cyclic loading step and generates smaller maximum bending moment for piles in the ultimate state. It can be attributed to the difference in compaction degree of the soil around the piles with loading method of cyclic lateral loads. In addition, it is founded that 1-way and 2-way cyclic lateral loads cause a decrease in the maximum bending moment of piles in the ultimate state compared with that of piles subjected to only monotonic loads.

The change of somatic cell embryogenesis in Kalanchoe pinnata because of agar concentration in stimulating root stress (뿌리 스트레스를 유발하는 agar농도에 따른 Kalanchoe pinnata의 체세포 배 형성 변화)

  • Park, Jongbum;Kim, Jin-Seok;Kim, Donggiun
    • Journal of Plant Biotechnology
    • /
    • v.44 no.3
    • /
    • pp.320-324
    • /
    • 2017
  • Development of modern agricultural machinery and accompanying agricultural development cause soil compaction and reduce growth by stressing roots. Kalanchoe pinnata was used to investigate the impact of stress on rooting and changes in plant growth and reproduction. K. pinnata forms somatic embryos capable of asexual reproduction at the edge of leaves. Impact of root pressurization of K. pinnata on somatic embryogenesis and organ differentiation according to external stress factors was investigated by using a high concentration of agar and this phenomenon was studied histologically. Agar concentration in culture media ranged from 0.5%-1.5% to induce a compression effect on roots. The stem and leaf of K. pinnata were subjected to a microtechnique process to study changes in tissue. In vivo, K. pinnata produced 2nd and 3rd plantlets at edges of leaves from lack of water and excessive lighting conditions. In in vitro culture studies, the lower the concentration of agar, the higher the population and the higher the biomass, but plantlet did not occur in leaf bends. Conversely, as concentration of agar increased, increase in the number of individuals was low. Plantlet development occurred only in agar 1.5% medium. The difference in agar concentration was a stressor in the root of K. pinnata, and thus the pattern of asexual reproduction changed from the division method in root to a plantlet generation in leaf. This suggests root pressurization may act as stress and change in the plant reproduction pattern.

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF

Studies on Resource Plants of the Mireukbong and Manduksan in Jeollabuk-do (전라북도 만덕산과 미륵봉 일대의 자원식물상 연구)

  • Kim, Young-Ha;Beon, Mu-Sup;Oh, Hyun-Kyung
    • Korean Journal of Plant Resources
    • /
    • v.19 no.4
    • /
    • pp.447-458
    • /
    • 2006
  • The resource plants at the Manduksan and Mireukbong was listed 550 taxa: 107 families, 339 genera, 481 species, 1 subspecies, 65 varieties and 3 forms. Among 550 taxa listed was confirmed 323 taxa of edible plants (58.7%), 384 taxa of medicinal plants (69.8%), 267 taxa of ornamental plants (48.5%) and 268 taxa of the others (48.7%). Based on the list of the rare plants by the Forest Research Institute, 4 taxa were recorded in the studied areas; Lilium distichum (Preservation priority order: No. 159), Tricyrtis dilatata (No. 97), Aristolochia contorta (No. 151), Prunus yedoensis (No. 110) and based on the list of Korean endemic plants, 11 taxa were recorded; Cephalotaxus koreana, Carex okamotoi, Lilium amabile, Populus tomentiglandulosa, Salix purpurea var. japonica, Pseudostellaria multiflora, Prunus yedoensis, Forsythia koreana, Paulownia coreana, Weigela subsessilis, Aster koraiensis. Specific plant species by floral region were total 30 taxa; Prunus yedoensis in class V, Wistaria floribunda in class IV, 3 taxa (Spiraea salicifolia, Acer palmatum, Asperula lasiantha) in class III, 3 taxa (Potentilla dickinsii, Viola tokubuchiana var. takedana, Caryopteris incana) in class II, 22 taxa (Pinus koraiensis, Hosta capitata, Chloranthus japonicus, Salix glandulosa, Juglans mandshurica, etc.) in class I. This site needs urgent countermeasures, because there have increased many man-made damages like planting exotic plants, picking wild plants and soil compaction induced by human trampling.