The Journal of Korean Institute of Communications and Information Sciences
/
v.38B
no.3
/
pp.207-215
/
2013
This paper is channel assignment and scheduling techniques for efficient wireless AMI network. In AMI system, the multi-channel cluster network to be proposed defines the communication channel between NC (Network Coordinator) and CDA (Clustered Data Aggregator) as the network channel. CDA and OMD(Out Meter display) and communication channel between SMD(Smart Meter Device) are defined as the group channel. AMI network of the multi-channel cluster based in which the network channel and group channel is mixed increases the administration efficiency through the physical/logical consumer channel clustering. The reliability of inspection data through the channel use distinguished between the adjacent cluster is enhanced. In addition, the fast aggregation of data is possible and the size of a metering network is increased through the channel allocation of the multichannel cluster based.
This article is about using information technology to apply with water loss inspection system in District Metering Area (DMA). Inspector can check Flow rate and Minimum Night Flow; NMF via Smart Phone or PDA include sending SMS Alert in case the Pressure, Flow rate and NMF is over the range of controlling. This will be used as equipment to implement water loss in international proactive and can keep on water loss reduction more efficiency. The system consists of Data Logger which collects data of Flow rate from DMA Master Meter. PC is Wap Server which dial via modem in order to get data through FTP Protocal that will convert text file to Microsoft Access Database. Wappage will use xhtml language to show database on Wapbrowser and can show the result on Smart Phone or PDA by graph and table for system analysis.
Proceedings of the Korea Information Processing Society Conference
/
2012.04a
/
pp.208-211
/
2012
전력시스템에서 MDMS(Meter Data Management System)는 HAN(Home Area Network)과 Smart Meter, SUN(Smart energy Utility Network)와 같은 AMI(Advanced Metering Infrastructure) 기반 환경에서 수많은 전력 또는 수도 가스 사용량과 같은 데이터를 수집, 취득하고, 이들 데이터를 처리, 가공, 분석하여 가치 있는 정보로 변환시켜, 요금서비스 및 다양한 부가서비스 창출에 활용되는 소프트웨어 인프라이다. 최근 MDMS 개발은 기능의 중요성 뿐만 아니라 다른 응용 시스템들과의 상호 운용성을 고려하여 개발하는 요구 기능을 가진다. 본 논문에서는 스마트그리드 환경에 적합한 AMI의 전력처리시스템(MDMS) 개발을 위한 설계 방안을 기술하였다.
The Smart grid refers to the technology that enables efficient usage of electric power by collecting information concerning the power usage and power lines grafting information and communications technology to onto power grids. There are Zigbee, PLC or IEEE 802.11 WLAN MAC as a core technology of the Smart grid, but in this paper, the discussion is focused on the PLC. The PLC is the technology that carries out data communications using power lines and put into practical use in the field of lights or home appliances control recently but PLC-applied communications between electronic devices are rarely seen. For the reason that the PLC uses high-voltage power lines and has a disadvantage of experiencing higher data loss rate caused by the noises produced by going through transformers, the technology is yet to be used in many areas. Nevertheless, the PLC has been studied widely recently in respect that it's the low-cost communication solution for the Smart Metering [1]. Moreover, this technology is emerging as a novel data communication method and discussed as an important technology lately due to the developments of the Smart grid systems and Internet of things (IoT). Thus, in this paper, the results obtained from designing and performing implementation scenario for the PLC-based Smart grid home network system were compared and analyzed with that of IEEE 802.11 WLAN MAC (the foundation technology at Jeju Smart grid Test bed)-based Smart grid home network. Thus, in this paper, OPNET 14.5 PL8, OSI 7 layer, PLC router nodes and PLC nodes had been used for the designing and implementation simulations of both systems. Additionally, QoS was not considered in order to guarantee that all the traffics would not have the same processing priority.
Korea's modern waterworks began with construction of DDukdo water treatment plant in 1908 and has been growing rapidly along with the country's economic development. As a result, water supply rates have reached 98.5% based on 2013. Despite multilateral efforts for high-quality water supply, such as introduction of advanced water treatment process, expansion of waterworks infrastructure and so on, distrust for drinking tap water has been continuing and domestic consumption rate of tap water is in around 5% level and extremely poor comparing to advanced countries such as the United States(56%), Japan(52%), etc. Recently, the water management has been facing the new phase due to water environmental degradation caused by climate change, aging facilities, etc. Therefore, K-water has converted water management paradigm from the "clean and safe water" to the "healthy water" and been pushing the Smart Water City(SWC) Pilot Project in order to develop and spread new water supply models for consumers to believe and drink tap water through systematic water quality and quantity management combining ICT in the whole water supply process. The SWC pilot projects in Pa-ju city and Go-ryeong county were an opportunity to check the likelihood of the "smart water management" as the answer to future water management. It is needed to examine the necessity of smart water management introduction and nationwide SWC expansion in order to improve water welfare for people and resolve domestic & foreign water problems.
This paper discusses the state-of-the-art techniques in real-time state estimation for the Smart Microgrids. The most popular method used in traditional power system state estimation is a Weighted Least Square(WLS) algorithm which is based on Maximum Likelihood(ML) estimation under the assumption of static system state being a set of deterministic variables. In this paper, we present a survey of dynamic state estimation techniques for Smart Microgrids based on Belief Propagation (BP) when the system state is a set of stochastic variables. The measurements are often too sparse to fulfill the system observability in the distribution network of microgrids. The BP algorithm calculates posterior distributions of the state variables for real-time sparse measurements. Smart Microgrids are modeled as a factor graph suitable for characterizing the linear correlations among the state variables. The state estimator performs the BP algorithm on the factor graph based the stochastic model. The factor graph model can integrate new models for solar and wind correlation. It provides the Smart Microgrids with a way of integrating the distributed renewable energy generation. Our study on Smart Microgrid state estimation can be extended to the estimation of unbalanced three phase distribution systems as well as the optimal placement of smart meters.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.5
/
pp.93-99
/
2019
In this paper, we propose a smart meter that uses GRU model, which is one of artificial neural networks, for the efficient energy management. We collected power consumption data that train GRU model through the proposed smart meter. The implemented smart meter has automatic power measurement and real-time observation function and load control function through power consumption prediction. We determined a reference value to control the load by using Root Mean Squared Error (RMS), which is one of performance evaluation indexes, with 20% margin. We confirmed that the smart meter with automatic load control increases the efficiency of energy management.
KIPS Transactions on Computer and Communication Systems
/
v.5
no.10
/
pp.311-318
/
2016
IoT(Internet of Things areas) rich information based on the user easy access to service creation must be one of the power system of specificity due following: The IoT spread obstacle to the act be, and 'Smart Grid information of this is not easy under power plants approach the Directive on the protection measures, particularly when stringent security policies IoT technologies applied to Advanced Metering Infrastructure sector has been desired. This is a situation that occurs is limited to the application and use of IoT technologies in the power system. Power Information Network is whilst closed network operating is has a smart grid infrastructure, smart grid in an open two-way communication for review and although information security vulnerabilities increased risk of accidents increases as according to comprehensive security policies and technologies are required and can. In this paper, the IoT platform architecture design of information systems as part of the power of research and development IoT-based energy information platform aims. And to establish a standard framework for a connection to one 'Sensor-Gateway-Network-platform sensors Service' to provide power based on the IoT services and solutions. Framework is divided into "sensor-gateway" platform to link information modeling and gateways that can accommodate the interlocking standards and handling protocols variety of sensors Based on this real-time data collection, analysis and delivery platform that performs the role of the relevant and to secure technology.
In Home Area Network (HAN) of the smart grid, Power Line Communication (PLC) technology and ZigBee communication technology can be used in the communication among the Advanced Metering Infrastructure (AMI) devices. However, according to performance evaluation results of the PLC technology, we find that using the PLC technology is unsuitable for the remote meter reading service. It is worth noting that some parts of the PLC are converted to the ZigBee communication technology in Jeju, Korea. Compared with PLC, ZigBee has no restriction of the place, where the equipments can be freely set up, due to the advantage of radio communication. However, number of usable devices will impact the network performance which is depended on the address assignment. In addition, due to the restriction of transmission range among devices, it is difficult to apply the ZigBee address assignment method to the practical circumstance. In this paper, we examine the previous ZigBee address assignment schemes and the corresponding routing algorithms, and propose a novel address assignment scheme compared with the existing methods, the performance of the proposed one is improved. In particular, evaluation results show that the proposed scheme reduces the average number of hop count, the transfer time and the processing time.
Smart metering systems have become widespread around the world. RF mesh communication systems have contributed to the creation of smarter and more reliable power systems. This paper presents an algorithm for positioning GPRS concentrators to attain delay constraints for a ZigBee-based mesh network. The proposed algorithm determines the number and placement of concentrators using integer linear programming and a queueing model for the given mesh network. The solutions given by the proposed algorithm are validated by verifying the communication network performance through simulations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.