• 제목/요약/키워드: small hydro power

검색결과 175건 처리시간 0.023초

Technical feasibility study for power generation from a potential mini hydro site nearby Shoolini University

  • Pundir, Anil;Kumar, Anil
    • Advances in Energy Research
    • /
    • 제2권2호
    • /
    • pp.85-95
    • /
    • 2014
  • Small Hydro-Power (SHP) is an environmental friendly technology. Usually hydro power generation projects are viewed as constructing large dams and reservoirs but available new research and engineering techniques have helped hydro power generation without large dams and without large reservoirs. In India, there are several water installations, irrigation dams, canals, streams or running rivers not tapped to generate power. In these cases the existing system and facilities can help in generating power with less investment and time. This area is yet unexplored. Harnessing a stream for hydroelectric power is a major undertaking for the energy crises and the global issues to go green. In this technical note a potential site for mini hydro power plant nearby Shoolini University is identified and examined for the economic feasibility.

해양소수력발전소 튜블러 수차 성능평가를 위한 현장시험 (Field Test for Performance Evaluation of a Tubular Turbine in Marine Small Hydro Power Plant)

  • 황영호;이영호;최영도
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권8호
    • /
    • pp.1070-1077
    • /
    • 2011
  • 본 연구는 해양소수력발전소에서의 튜블러 수차의 성능평가를 위한 현장시험 및 그 결과에 대한 내용을 포함하고 있다. 현장시험용 수차의 발전기 최소출력은 측정된 유효낙차, 출력 그리고 효율을 이용하여 검토되었다. 정격 및 최대 출력시험은 수차 설치현장의 조수간만의 차에 의한 영으로 인하여 동일한 실험조건을 확보할 수 없었기 때문에 모델시험에 의한 성능 데이터를 이용하여 환산된 값을 사용하였다. 현장시험에 의한 수차의 성능은 최소출력, 정격출력, 최대출력 운전점에서 보증출력 및 보증효율을 만족시키는 결과를 나타냄을 확인하였다.

소수력 발전설비 성능평가 시스템 구축 (Construction of small hydropower facilities performance evaluation system)

  • 김영준;김용열;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.193.2-193.2
    • /
    • 2010
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

소수력 발전설비 성능평가 시스템 구축 (Construction of small hydropower facilities performance evaluation system)

  • 김영준;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.206.2-206.2
    • /
    • 2011
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

소수력발전용 횡류수차의 러너 블레이드 깃수에 따른 성능해석 (Performance Analysis of a Cross Flow Hydro Turbine by Runner Blade Number)

  • 최영도;김창복;임재익;김유택;이영호
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제32권5호
    • /
    • pp.698-706
    • /
    • 2008
  • Performance improvement of Small hydro turbine is a very important subject to solve in the stage of introduction and development of the turbine. Cross-flow hydro turbine should be also studied more in detail for the turbine performance in order to extend the sites of application. In order to improve the turbine performance, the effect of the turbine shape on the turbine performance should be examined. Therefore, the effect of runner blade number on the turbine performance is investigated by use of a commercial CFD code. The results show that runner blade number gives remarkable effect on the efficiency and output power of the turbine. Pressure on the surface of the runner blade changes considerably by the blade number at Stage 1, but relatively small change of velocity distribution occurs in the flow passage.

물관련 설비를 이용한 소수력발전 성능분석 (Performance Analysis for Small Hydro Power at Existing Water Treatment Facilities)

  • 박완순;이철형
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.134-137
    • /
    • 2008
  • A methodology to evaluate the performance analysis for small hydropower at existing water treatment facilities has been studied. It consists of two main parts; flow duration function which can describe existing water treatment facilities and performance analysis to estimate the output characteristics of small hydro power plants. The output performance characteristics for Mi-ho reservoir, Sum-kang low dam, Sun-cheon sewage treatment plant and Nam-dong purification plant were analyzed, using developed model. According to the simulation results, the predicted data show that the data were in good agreement with measured results. Also, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power at existing water treatment facilities.

  • PDF

한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영- (A Framework for Investment Justification and Economic Operation-)

  • 이승규;박용삼
    • 한국경영과학회지
    • /
    • 제12권1호
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

블레이드 형상 변화에 따른 마이크로 튜블러 수차의 CFD 성능해석 (CFD Performance analysis of Micro Tubular-type hydro turbine by blade shape)

  • 박지훈;황영철;모장오;김유택;이영호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.206.1-206.1
    • /
    • 2011
  • Recently, various developments in the area of small hydropower have being made and small hydro turbines are suitable for domestic use because it is a clean and renewable energy source. A small hydropower generator produces power by using the different water pressure levels in pipe lines and energy which was initially wasted by use of a reducing valve at the end of the pipeline is instead collected by a tubular-type hydro turbine in the generator. In this study, in order to acquire the performance of tubular-type hydro turbine applied, the output power, head, efficiency characteristics due to the different guide vane and runner vane angle are examined in detail. Moreover, influences of pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  • PDF

소수력 발전시스템을 위한 IED의 정정치에 관한 연구 (A Study on Setting of IED for Small Hydro Generation System)

  • 안태풍;박철원
    • 전기학회논문지P
    • /
    • 제66권1호
    • /
    • pp.15-20
    • /
    • 2017
  • In order to advance and improve the performance of domestic aged power plants, IEDs have been developed for power generation systems. For smooth installation and operation of the protection relays, a detail settings study of IED is required. This paper deals with an analysis based on PSCAD and setting investigation of IED for loss of field, reverse power protection in Small Hydro Generation System.

터널식 소수력 발전소의 최적 설계유량에 관한 연구 (A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro-Power Plants)

  • 이철형;박완순
    • 물과 미래
    • /
    • 제24권1호
    • /
    • pp.63-71
    • /
    • 1991
  • 본 연구는 터널식 소수력 발전소의 타당성 검토 기법에 관한 것으로 개발 후보지의 유량지속곡선을 작성하기 위해서 Weibull분포의 누적밀도함수와 Thiessen법을 채택하였고, 터널식 소수력 발전소의 성능예측 모델과 건설비 산정 모델이 개발되었다. 또한 한강 수계에 산재한 8개소의 개발후보지를 선정, 실측하여 이들을 대상으로 성능 특성 및 경제적 타당성을 분석하였다. 분석 결과, 터널식 소수력 발전소의 경우 발전단가를 가장 낮게 하여 주는 최적 설계유량은 유량지속곡선상의 시간비가 20%에서 30%사이에 해당하는 유량이라는 것이 밝혀졌다. 또한 개발 후보지의 설계유량, 유효낙차, 설비용량, 년평균 가동율, 년간 전기 생산량 등과 같은 초기설계제원이 산정되었다.

  • PDF