• 제목/요약/키워드: slack mooring

검색결과 5건 처리시간 0.023초

열대 태평양에서 운영되는 TRITON 부이와 비교를 통한 KORDI 부이 시스템 개선 연구 (A Study for Improving the KORDI Buoy System in Comparison with TRITON Buoys in the Tropical Pacific Ocean)

  • 김동국;전동철;김응;황근춘;황상철
    • Ocean and Polar Research
    • /
    • 제33권spc3호
    • /
    • pp.359-369
    • /
    • 2011
  • This study documents KORDI's experience of successfully deploying a deep ocean buoy for monitoring oceanic and atmospheric variabilities in the tropical western Pacific Ocea nsince May 2010. The primary focus of this study was to compare TRITON (big and old type) with m-TRITON (smaller and new type) buoys within the JAMSTEC's buoy management system. The objective of operating a KORDI buoy is to ascertain oceanic variability in the tropical western Pacific. We adopted a slack-line mooring type to observe water temperatures at six layers from surface to 400 m depth. However, we could not acquire satisfactory results due to lack of expertise in buoy management system. A new KORDI buoy has been developing, which has been modified from both buoys, and ARGOS-3 satellite system and a slack-type mooring line.

장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계 (Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel)

  • 김원석
    • 수산해양교육연구
    • /
    • 제25권3호
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.

긴장재 느슨해짐에 따른 해중 터널의 동적 불안정 거동 (Dynamic Instability of Submerged Floating Tunnels due to Tendon Slack)

  • 원덕희;김승준
    • 한국강구조학회 논문집
    • /
    • 제29권6호
    • /
    • pp.401-410
    • /
    • 2017
  • 본 연구에서는 긴장재로 계류된 해중 터널에서 긴장재의 느슨해짐에 따른 동적 불안정 거동에 대해 다룬다. 해중 터널의 설계는 파랑 및 조류 등 유체력에 의해 지배받는다. 특히 시간에 따라 지속적으로 크기 및 작용방향이 변하는 파랑은 해중 터널의 동적 거동을 직접적으로 야기하게 되는데, 파랑에 의한 부유 튜브의 운동은 계류선 내력의 동적 변동을 유발하게 되고, 이 힘의 변화는 계류선의 강도설계 뿐 만 아니라 피로 설계에도 직접적인 영향을 미친다. 파랑에 의한 터널의 운동이 극심할 경우, 계류선의 장력은 모두 소실될 수 있는데, 이 때 계류선이 느슨해짐에 따라 일시적으로 부유 터널의 운동에 대한 저항성이 사라져 동적 불안정 거동이 유발 될 수 있다. 이에 본 연구에서는 유체-구조동역학 해석기법을 통해 해중 터널 긴장재의 느슨해짐 발생 시 부유 튜브의 동적 불안정 거동에 대해 분석하였다. 특히 해중터널의 중요 설계 인자인 흘수, 부력-자중 비율(Buoyancy-Weight Ratio, BWR), 긴장재 기울임이 동적 불안정 거동에 미치는 영향에 대해 분석하였다.

Dynamic analysis of slack moored spar platform with 5 MW wind turbine

  • Seebai, T.;Sundaravadivelu, R.
    • Ocean Systems Engineering
    • /
    • 제1권4호
    • /
    • pp.285-296
    • /
    • 2011
  • Spar platforms have several advantages for deploying wind turbines in offshore for depth beyond 120 m. The merit of spar platform is large range of topside payloads, favourable motions compared to other floating structures and minimum hull/deck interface. The main objective of this paper is to present the response analysis of the slack moored spar platform supporting 5MW wind turbine with bottom keel plates in regular and random waves, studied experimentally and numerically. A 1:100 scale model of the spar with sparD, sparCD and sparSD configuration was studied in the wave basin ($30{\times}30{\times}3m$) in Ocean engineering department in IIT Madras. In present study the effect of wind loading, blade dynamics and control, and tower elasticity are not considered. This paper presents the details of the studies carried out on a 16 m diameter and 100 m long spar buoy supporting a 90 m tall 5 MW wind turbine with 3600 kN weight of Nacelle and Rotor and 3500 kN weight of tower. The weight of the ballast and the draft of the spar are adjusted in such a way to keep the centre of gravity below the centre of buoyancy. The mooring lines are divided into four groups, each of which has four lines. The studies were carried out in regular and random waves. The operational significant wave height of 2.5 m and 10 s wave period and survival significant wave height of 6 m and 18 s wave period in 300 m water depth are considered. The wind speed corresponding to the operational wave height is about 22 knots and this wind speed is considered to be operating wind speed for turbines. The heave and surge accelerations at the top of spar platform were measured and are used for calculating the response. The geometric modeling of spar was carried out using Multisurf and this was directly exported to WAMIT for subsequent hydrodynamic and mooring system analysis. The numerical results were compared with experimental results and the comparison was found to be good. Parametric study was carried out to find out the effect of shape, size and spacing of keel plate and from the results obtained from present work ,it is recommended to use circular keel plate instead of square plate.

Reliability of TLP tethers under extreme tensions

  • Siddiqui, N.A.;Ahmad, Suhail
    • Structural Engineering and Mechanics
    • /
    • 제16권3호
    • /
    • pp.317-326
    • /
    • 2003
  • The tension leg platform (TLP) is a moored floating offshore structure whose buoyancy is more than its weight. The mooring system, known as tethers, is vulnerable to failure due to extreme (maximum and minimum) tensions. In the present study the reliability of these tethers under maximum and minimum tension (ultimate limit state) has been studied. Von-Mises failure criteria has been adopted to define the failure of a tether against maximum tension. The minimum tension failure criteria has been assumed to meet when the tethers slack due to loss of tension. First Order Reliability method (FORM) has been adopted for reliability assessment. The reliability, in terms of reliability index, and probability of failure has been obtained for twelve sea states. The probabilities of failure so obtained for different sea states have been adopted for the calculation of annual and life time probabilities of failure.