• Title/Summary/Keyword: site application

Search Result 2,597, Processing Time 0.03 seconds

A Comparative Study between the Application Group and Non-application Group of a Sand Bag on the Surgical Region after a Pediatric Cardiac Catheterization (환아의 심도자 시술 후 시술 부위의 모래주머니 적용효과)

  • Han Jin Kyung;Cho Kyoul Ja
    • Child Health Nursing Research
    • /
    • v.5 no.3
    • /
    • pp.340-348
    • /
    • 1999
  • The purpose of this study was to compare degree of complication and discomfort between application ' non-application of a sand bag after 3hours, 6hours, 18hours of a cardiac catheterization. The results were as follows : 1) There was no difference in a degree of occurrence of a complication and pain of the femoral punture site between application and non-application of a sand bag after the cardiac catheterization. 2) A degree of a discomfort between application and non-application of a sand bag after the cardiac catheterization recorded the highest scores in the application group of a sand bag 6 hours after the cardiac catheterization.

  • PDF

Factors that Influence Satisfaction of Shoppers Who have Internet Shopping Mall Experience. (인터넷 쇼핑몰 구매경험자들의 고객만족도에 영향을 미치는 요인)

  • Kim, Sung-Eon
    • The Journal of Information Systems
    • /
    • v.17 no.2
    • /
    • pp.27-47
    • /
    • 2008
  • The base of an internet shopping mall is web application system. However, this mall is a market place where selling and buying of products and services take place. Therefore, it should be considered both a commerce function and a web site design function. The commerce function and the web site design function are considered as variables that influence trust and familiarity. This trust and familiarity are considered as the main factors that influence satisfaction of shoppers of internet shopping malls. Analysis indicates that the web site design function significantly influences both trust and familiarity, but the commerce function significantly influence only familiarity negatively. Also trust and familiarity significantly influence user satisfaction.

A Study on the Research & Analysis of the Health and Safety Managing's Understanding on the Applied Construction Work Site Risk Assessment - Focus on Site Manager & Manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choi, Soo-Hwan;Kim, Chi-Kyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.62-67
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

the Development of Personalization Design framework for building Customized Website - focused on the Application of Design Recommender System (고객맞춤형 웹사이트 구현을 위한 개인화 디자인 프레임웍의 개발 - 디자인 추천 시스템의 활용을 중심으로)

  • 서종환
    • Archives of design research
    • /
    • v.16 no.2
    • /
    • pp.23-34
    • /
    • 2003
  • The need for personalized web site design has been increased these days. Current approach for personalized web site design is easily applied to web site with their cost-effective feature, but is hard to provide a more refined personalized service due to its lack of accumulation of user data. In this study, the design recommender system is investigated as a more advanced method for web site design personalization. We provide an overview of current recommender systems, and then outlined a newly developed design recommender system, which employs collaborative filtering technique to provide tailored recommendation for users.

  • PDF

Probabilistic real-time updating for geotechnical properties evaluation

  • Ng, Iok-Tong;Yuen, Ka-Veng;Dong, Le
    • Structural Engineering and Mechanics
    • /
    • v.54 no.2
    • /
    • pp.363-378
    • /
    • 2015
  • Estimation of geotechnical properties is an essential but challenging task since they are major components governing the safety and reliability of the entire structural system. However, due to time and budget constraints, reliable geotechnical properties estimation using traditional site characterization approach is difficult. In view of this, an alternative efficient and cost effective approach to address the overall uncertainty is necessary to facilitate an economical, safe and reliable geotechnical design. In this paper a probabilistic approach is proposed for real-time updating by incorporating new geotechnical information from the underlying project site. The updated model obtained from the proposed method is advantageous because it incorporates information from both existing database and the site of concern. An application using real data from a site in Hong Kong will be presented to demonstrate the proposed method.

Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

A study on the Research & Analysis of the Health and safety Managing's Understanding on the Applied Construction work site Risk Assessment - Focus on Site manager & manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choe, Su-Hwan;Bae, Jun-Tae;Lee, Yeon-Su;Kim, Chi-Gyeong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.1-11
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

  • PDF

A Study on Factors Affecting Changes in Estimating Standards in Plaster Work (미장공사의 품기준 변화 요인에 관한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.232-233
    • /
    • 2019
  • The plater work in the standard of estimate presents a variety of construction types. However, there is a part that does not fit the change of specification standards and on-site construction status, and it was revised in 2019's standard of estimate. In this study, we analyzed in detail the factors affecting the changes in estimating standards in the plater work. There were changes in the specification standards previously presented as primary coat, secondary coat, and formal coat as well as changes in on-site construction status such as thickness according to the number of plastering. Therefore, it is analyzed that the estimating standards can be classified by the number of finishes according to the site conditions by reflecting the analysis of the specification standards and site application status, and suggesting the finishing standards according to the number of plastering.

  • PDF

A Study on the Application of Quality Management to Fire Door Construction (방화문 시공시 현장품질관리지침 적용에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.90-91
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. Accordingly, on-site quality management and maintenance guideline for fire doors were presented. In this paper, we tried to explain the requirements for the construction of fire doors during the on-site quality management and maintenance guideline for fire doors presented in the study.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF