• Title/Summary/Keyword: shield tunnel lining

Search Result 63, Processing Time 0.02 seconds

A study of tunnelling equipment development in a model test (터널굴착 시뮬레이션을 위한 터널굴착장비의 개발에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.199-207
    • /
    • 2003
  • Tunnel modelling in the field of geotechnical engineering essentially requires models of tunnelling machines and the simulation of tunnelling processes to clarify the detailed behaviour of tunnel construction. Modern advanced mechatronics, including construction processes, machinining and control technologies, are making it possible to fabricate such models. These technologies, however, are essentially developed in a gravity field condition and are needed to examine in a 1g or cenrifuge field condition. This paper presents the simulation method for tunnelling processes and the design method for tunnelling machines with special reference to the problem of earth pressure acting on the lining of a shield tunnel. The paper then introduces and verifies the design method for tunnelling machines in the 1g field by means of checking the reproduceability of experiment data and their comparison with data in the field.

  • PDF

Use of large-scale shake table tests to assess the seismic response of a tunnel embedded in compacted sand

  • Zhou, Hao;Qin, Xiaoyang;Wang, Xinghua;Liang, Yan
    • Earthquakes and Structures
    • /
    • v.15 no.6
    • /
    • pp.655-665
    • /
    • 2018
  • Shield tunnels are widely used throughout the world. However, their seismic performance has not been well studied. This paper focuses on the seismic response of a large scale model tunnel in compacted sand. A 9.3 m long, 3.7 m wide and 2.5 m high rigid box was filled with sand so as to simulate the sandy soil surrounding the tunnel. The setup was excited on a large-scale shake table. The model tunnel used was a 1:8 scaled model with a cross-sectional diameter of 900 mm. The effective shock absorbing layer (SAL) on the seismic response of the model tunnel was also investigated. The thickness of the tunnel lining is 60 mm. The earthquake motion recorded from the Kobe earthquake waves was used. The ground motions were scaled to have the same peak accelerations. A total of three peak accelerations were considered (i.e., 0.1 g, 0.2 g and 0.4 g). During the tests, the strain, acceleration and soil pressure on the surface of the tunnel were measured. In order to investigate the effect of shock absorbing layer on the dynamic response of the sand- tunnel system, two tunnel models were set up, one with and one without the shock absorbing layer of foam board were used. The results shows the longitudinal direction acceleration of the model tunnel with a shock absorbing layer were lower than those of model tunnel without the shock absorbing layer, Which indicates that the shock absorbing layer has a beneficial effect on the acceleration reduction. In addition, the shock absorbing layer has influence on the hoop strain and earth pressure of the model tunnel, this the effect of shock absorbing layer to the model tunnel will be discussed in the paper.

The First Case Study of TBM Pre-Excavation Type 2-Arch Tunnel in Korea (국내 최초 TBM선굴진 2-Arch터널 설계사례 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.255-264
    • /
    • 2023
  • As the demand for urban underground space increases recently, urban tunnel planning is actively progressing. In the urban area, a underground station is planned in consideration of the living environment of residents, and 2-arch tunnel is applied for the stability of existing structures and reduction of environmental damage. However, since the depth of weak rock mass is deeply distributed in the urban area due to severe weathering, careful planning is required to secure tunnel stability. In addition, if TBM mechanical excavation is applied as the main tunnel excavation method considering the composite ground in urban area, the construction connectivity with the 2-arch tunnel of the NATM concept may be deteriorated. In this study, the design case of applying TBM pre-excavation type 2-arch tunnel for the first time in Korea was mainly described. The main considerations for the segment design of TBM pre-excavation type 2-arch tunnel were explained for side tunnels. Also, a stability analysis was conducted to verify the effectiveness and adequacy of the TBM pre-excavation type 2-arch tunnel.

Mechanical characteristics of high-performance concrete shield segment containing ground granulated blast furnace slag and their improvement by steam curing (고성능 쉴드 세그먼트용 고로슬래그 미분말을 혼입한 콘크리트의 역학적 특성 및 증기양생 효과 분석)

  • Kim, Byoung-Kwon;Lee, Jin-Seop;Lee, Gyu-Phil;Chang, Soo-Ho;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.233-242
    • /
    • 2011
  • This study aims to evaluate the applicability of high-strength concrete mixed with blast furnace slag to shield segment lining in order to improve its performance and economic efficiency. Especially, it was also intended to derive the optimum replacing ratio of ground granulated blast furnace slag to ordinary cement as well as the optimum steam curing condition for shield segment concrete with the design strength of 60 MPa. From a series of experiments, the condition of 50% replacement of ordinary cement by ground granulated blast furnace slag and unit water content of 125 kg/$m^3$ was proposed as the optimum mixing condition. Comparing with standard curing conditions, it was also possible to expect approximately 110~442% strength improvement of concrete by steam curing in the same mixing condition.

Dynamic response of segment lining due to train-induced vibration (세그먼트 라이닝의 열차 진동하중에 대한 동적 응답특성)

  • Gyeong-Ju Yi;Ki-Il Song
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.4
    • /
    • pp.305-330
    • /
    • 2023
  • Unlike NATM tunnels, Shield TBM tunnels have split linings. Therefore, the stress distribution of the lining is different even if the lining is under the same load. Representative methods for analyzing the stress generated in lining in Shield TBM tunnels include Non-joint Mode that does not consider connections and a 2-ring beam-spring model that considers ring-to-ring joints and segment connections. This study is an analysis method by Break-joint Mode. However, we do not consider the structural role of segment lining connections. The effectiveness of the modeling is verified by analyzing behavioral characteristics against vibration loads by modeling with segment connection interfaces to which vertical stiffness and shear stiffness, which are friction components, are applied. Unlike the Non-joint mode, where the greatest stress occurs on the crown for static loads such as earth pressure, the stress distribution caused by contact between segment lining and friction stiffness produced the smallest stress in the crown key segment where segment connections were concentrated. The stress distribution was clearly distinguished based on segment connections. The results of static analysis by earth pressure, etc., produced up to seven times the stress generated in Non-joint mode compared to the stress generated by Break-joint Mode. This result is consistent with the stress distribution pattern of the 2-ring beam-spring model. However, as for the stress value for the train vibration load, the stress of Break-joint Mode was greater than that of Non-joint mode. This is a different result from the static mechanics concept that a segment ring consisting of a combination of short members is integrated in the circumferential direction, resulting in a smaller stress than Non-joint mode with a relatively longer member length.

Evaluation of Mechanical Performance of a Segment Lining coated by a Sprayed Waterproofing Membrane by a Full-scale Loading Test (실물 재하실험에 의한 뿜칠 방수 멤브레인이 타설된 세그먼트 라이닝의 역학적 성능 평가)

  • Kang, Tae-Ho;Choi, Soon-Wook;Lee, Chulho;Park, Byungkwan;Kim, Jintae;Choi, Myung-Sik;Chang, Soo-Ho
    • Tunnel and Underground Space
    • /
    • v.28 no.1
    • /
    • pp.97-110
    • /
    • 2018
  • The application of sprayed waterproofing membrane with high adhesion and ductility is considered to be promising as a measure for repair and reinforcement of a tunnel structure. Therefore, a powder-type and one-component membrane prototype with high tensile and bond strengths was made in this study. Then, its reinforcement effect on a shield segment was evaluated by carrying out a series of full-scale loading tests of segment specimens on which the membrane was sprayed. From the tests, it was confirmed that the initial cracking loads increased by approximately 34% due to cracking retardation by membrane coating. Even though the increase of failure loads were not so high as cracking loads, the strain-softening behaviors were observed from specimens coated by the membrane. Therefore, it is expected that the membrane coated on the inner surface of a lining might be effective in preventing its brittle failure.

Structural performance evaluation of precast concrete segment using synthetic fibres (프리캐스트 콘크리트 세그먼트의 합성섬유 보강재 적용에 따른 구조적 성능 평가)

  • Lee, Hoseong;Kim, Changyong;Lee, Sean S.;Kim, Seungjun;Lee, Kyeongjin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.469-483
    • /
    • 2018
  • Steel bars have been widely used as the primary reinforcement for Precast Segmental Concrete Lining for TBM Tunnels. Previously, studies have been carried out to gauge the potential for steel fiber reinforcement to replace the use of steel bar reinforcements in the segmental lining to reduce the amount of the steel bar reinforcement. Steel fiber reinforcements have been investigated and widely applied to SFRC TBM linings to improve the constructability of SFRC TBM linings worldwide. However, the steel fiber reinforcement often caused punctures to the water membranes inside tunnel lining and had long-term durability deterioration issues caused by steel corrosion, as well as cosmetic problems. Therefore, this paper sought to gauge the potential of synthetic fiber reinforcements, which have proven to be very attractive substitutes for steel fiber reinforcements. This study analyzed the performance of both steel and synthetic fiber reinforcements in segmental linings and evaluated the applicability of the fiber reinforcements to the TBM Precast Concrete Segmental Linings of TBM tunnels. As a conclusion, this study demonstrates that the potential use of steel and synthetic fibers in various combination, can substitute the rebar reinforcement in the concrete mix for segmental concrete linings.

Forward probing utilizing electrical resistivity and induced polarization for predicting soil and core-stoned ground ahead of TBM tunnel face (전기비저항과 유도분극을 활용한 TBM 터널 굴착면 전방 토사지반 및 핵석지반 예측 기법)

  • Kang, Daehun;Lee, In-Mo;Jung, Jee-Hee;Kim, Dohyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.323-345
    • /
    • 2019
  • It is essential to predict ground conditions ahead of a tunnel face in order to successfully excavate tunnels using a shield TBM. This study proposes a forward prediction method for a mixed soil ground and/or a ground containing core stones by using electrical resistivity and induced polarization exploration. Soil conditioning in EPB shield TBM is dependent upon the composition of mixed soils; a special care need to be taken when excavating the core-stoned soil ground using TBM. The resistivity and chargeability are assumed to be measured with four electrodes at the tunnel face, whenever the excavation is stopped to assemble one ring of a segment lining. Firstly, the mixed ground consisting of weathered granite soil, sand, and clay was modeled in laboratory-scale experiments. Experimental results show that the measured electrical resistivity considerably coincides with the analytical solution. On the other hand, the induced polarization has either same or opposite trend with the measured resistivity depending on the mixed ground conditions. Based on these experimental results, a method to predict the mixed soil ground that can be used during TBM tunnel driving is suggested. Secondly, tunnel excavation from a homogeneous ground to a ground containing core stones was modeled in laboratory scale; the irregularity of the core stones contained in the soil layer was modeled through random number generation scheme. Experimental results show that as the TBM approaches the ground that contains core stones, the electrical resistivity increases and the induced polarization fluctuates.

Analysis of segment lining cracking load considering axial force by varying boundary condition (경계조건 변화에 의해 발생한 축력을 고려한 세그먼트 라이닝의 균열하중 분석)

  • Lee, Gyu-Phil;Bae, Gyu-Jin;Kang, Tae-Sung;Chang, Soo-Ho;Choi, Soon-wook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.173-180
    • /
    • 2014
  • In the design of tunnel segment structure, axial and moment forces are considered as significant forces. Since axial force is much greater than moment force, the whole section of segment remains in compression. Therefore crack width can be reduced. But the axial force is not considered in criteria for serviceability check. This fact leads service condition more severe compared to ultimate condition and makes the required steel reinforcement increase to meet the serviceability criteria. In this study, the effect of axial force on serviceability of tunnel segment is evaluated, experimentally and analytically. Mock-up tests on segments with actual size were performed and investigated in terms of initial crack resistance. The evaluation proves that more comprehensive design could be achieved when the axial force is considered in the procedure for the serviceability check in design of tunnel segment.

The Behaviours of Existing Tunnels in response to Multiple side-by-side Tunnel Construction in Soft Ground (연약지반 다수의 터널 병렬시공 시 기존터널의 거동)

  • Ahn, Sung Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.193-204
    • /
    • 2008
  • This paper describes laboratory experiments modelling multiple tunnel construction in soft ground. A series of small-scale model tests have been conducted at approximately 1/50 scale in order to investigate the behaviours of existing tunnels in response to the construction of new tunnels in close proximity. The model tunnels were constructed in a consolidated Speswhite Kaolin clay using a tunnelling device involving an auger type cutter within a shield. Strain gauges and LVDTs were used for instrumenting the existing tunnels. The findings obtained from the analyses of these tests were compared to the field measurements involving the reconstruction of the Northern Line London Underground Ltd. tunnels at Old street, United Kingdom. The results were also compared to the ground movement measurements obtained from a separate set of tests undertaken using the same apparatus and experimental procedures.