• Title/Summary/Keyword: separation distance

Search Result 538, Processing Time 0.028 seconds

A Study on the Ignition Distance from a Leakage Point of the LP Gas Pipe (LP 가스 배관의 누출부로부터 점화가능 거리에 관한 연구)

  • Ryou, Young-Don;Kim, Young-Gu;Jo, Young-Do
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.5
    • /
    • pp.70-76
    • /
    • 2017
  • The standards related to the "Urban Gas Business Act" and the "Safety Control and Business Regulation of Liquefied Petroleum Gas Act" prescribe the separation distance between gas piping joint excluding welded joints and electric equipments(electric switch, watt meter, breaker, connector, etc). The "Korea Electro technical Regulation" also prescribes the distance between gas piping joints and electric equipments in accordance with the gas related standards. In case of the standards related to the "Urban Gas Business Act", the distance criteria stipulated in the standard of supplying facilities are different from those stipulated in the standard of using facilities. In this study, we have conducted pilot test on the possible ignition distance from the piping joint when LP gas is leaked from the point. We have also examined the adequacy of current standards on the separation distance between gas piping joint and electric equipments. As a result of the tests, we have found that ignition is able to occur at a distance of 30 cm as stipulated in the current standards or more when LP gas is leaked from the joint of the pipe. Therefore, we have made a decision that the criteria for separation distance between gas piping joint and electric equipment specified in the current standards related to the "Urban Gas Business Act" and the "Safety Control and Business Regulation of Liquefied Petroleum Gas Act" is appropriate.

Frictionless contact problem for a layer on an elastic half plane loaded by means of two dissimilar rigid punches

  • Ozsahin, Talat Sukru
    • Structural Engineering and Mechanics
    • /
    • v.25 no.4
    • /
    • pp.383-403
    • /
    • 2007
  • The contact problem for an elastic layer resting on an elastic half plane is considered according to the theory of elasticity with integral transformation technique. External loads P and Q are transmitted to the layer by means of two dissimilar rigid flat punches. Widths of punches are different and the thickness of the layer is h. All surfaces are frictionless and it is assumed that the layer is subjected to uniform vertical body force due to effect of gravity. The contact along the interface between elastic layer and half plane will be continuous, if the value of load factor, ${\lambda}$, is less than a critical value, ${\lambda}_{cr}$. However, if tensile tractions are not allowed on the interface, for ${\lambda}$ > ${\lambda}_{cr}$ the layer separates from the interface along a certain finite region. First the continuous contact problem is reduced to singular integral equations and solved numerically using appropriate Gauss-Chebyshev integration formulas. Initial separation loads, ${\lambda}_{cr}$, initial separation points, $x_{cr}$, are determined. Also the required distance between the punches to avoid any separation between the punches and the layer is studied and the limit distance between punches that ends interaction of punches, is investigated. Then discontinuous contact problem is formulated in terms of singular integral equations. The numerical results for initial and end points of the separation region, displacements of the region and the contact stress distribution along the interface between elastic layer and half plane is determined for various dimensionless quantities.

Effect of Separation Between Main and Divergent Tunnels in Divergence Section of Double-Deck Tunnel on the Stability (복층터널 분기구에서의 터널 이격에 따른 안정성 영향)

  • La, You-Sung;Kim, Bum-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.45-54
    • /
    • 2016
  • Double deck tunnels are considered to have a large demand in a near future for solving traffic congestion problems and overcoming the limitations in constructing new tunnels. This study presents a numerical investigation using finite element (FE) analysis on the behaviors of the tunnels and the stability of pillars in a divergence section where single tunnel is diverged from a main line double deck tunnel. The effects of the separation distance between the diverged and the main tunnels and the ground condition were examined through the FE analysis by varying the separation distance from 0.1D to 2.0D (D: diameter of main tunnel) and the rock class from class I to V, respectively, and the analysis results were compared with those using empirical methods, strength-stress ratio, and the volume of interference. The FE analysis results indicated that the separation distance has a larger effect on tunnel behaviors, compared with the rock strength, and a single tunnel with a large cross section is more favorable than two separated tunnels for tunnel stability when the separation distance is below 0.7D.

A Study on the Multi-Laser Image Tracking Method using the Latest Approach Angle (최근접 각도를 이용한 복수 레이저 영상 추적 방법 연구)

  • Jo, Jin-Pyo;Ko, Ho-Jeong;Kim, Jeong-Ho
    • Journal of Internet of Things and Convergence
    • /
    • v.6 no.2
    • /
    • pp.37-43
    • /
    • 2020
  • The paper proposed the method of calculating the latest approach angle that can reliably recognize multiple laser images even with the change in separation distance between screen and laser launch device. This method recognizes the angle of the laser pattern angle by using the distance of the laser pattern angle, and the angle extraction of the laser detects the laser image from the acquired image using the labeling algorithm, and performs the huff conversion to extract the angle of the straight line. The distance of the reference angle and angle of the laser image extracted using Euclidean distance among similarity scales is calculated, and the furnace is recognized using the calculated distance result value. Experiments with changing the separation distance to "200 cm to 400 cm" showed 100% recognition of individual strands at all separation distances. The experiment confirmed the reliability of the proposed method.

A Study on the Effect of the Stemming Hole medium to the Blasting Separation Distance of Structure (공내 매질이 구조물의 발파이격거리에 미치는 영향에 관한 연구)

  • Kang, Hee-Seop;Jeong, Jung-Gyu;Bang, Myung-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.1
    • /
    • pp.100-108
    • /
    • 2017
  • Because of urbanization, Industrialization and expansion of transportation network, blasting works are recently increasing in construction field. The blasting work influences environmental effects to residents and the safety of facilities around the working place, so the development of blasting technology is needed to reduce the damage to residents. The blasting mechanism in the hole was studied and tested in the blasting sites by the difference of diameter between explosives and drilling hole, which is named by the decoupling effect. This effect was tested by changing the medium between explosives and hole wall in three working sites(railway, highway and industrial complex). The vibration velocity of blasting was recorded and vibration equations were produced by regression analyses. Finally, the structure separation distance was derived using these equations. The testing results show that the specific gravity of medium is larger, the separation distance is smaller and the duration time of blasting is shorter in case of large specific gravity of medium, so the vibration effect stops more fastly in the water compared with the air.

A study on the contactless generator and recharge system for a bicyle (비접촉식 자전거 발전기 및 충전 시스템 개발에 관한 연구)

  • Park, Wang-Geun;Won, Si-Tae
    • Design & Manufacturing
    • /
    • v.11 no.2
    • /
    • pp.29-36
    • /
    • 2017
  • In this study, the non-contact type bicycle generator system considering the recharge is developed to use the eco-friendly energy source when the bicycle is operating. The following three main factors are considered in this study. One of factors is that the intensity of the rotating magnet is in the range of 2,700~4,300 [Gause]. The next factor is that the separation distance of rotating magnet and bicycle rim is in the range of 1.5-3.0 mm. The last factor is that the pedaling speed is in the range of 55 RPM [Wheel speed 5.6Km]~150 RPM [Wheel speed 15.25Km] consirering with the 5 staged gear transmission. The obtained results are as followed. (1) The generator output voltage gradually increases from 3V to 10V with the pedaling speed increases, at the separation distance is less than 2.5 mm and the operating voltage of the LED lamp is generated at a pedaling speed of 60 RPM or more. (2) The output current of the generator increases from 20mA to 40mA with the pedaling speed increases, at a separation distance is less than 2.0 mm and the operating current of the LED lamp is generated at a pedaling speed of 60 RPM or more. (3) When the separation distance was 3.0 mm, the output voltage and current are significantly lower than those of the bicycle LED lamp is generated. (4) The charging time is expected to be 12.24 ~ 17.65 hours when the magnitude of the magnet is 3,400[Gauss] at a pedaling speed of 55 RPM or more. (5) As a result of this study, it is thought that the non-contact type bicycle generator system considering the recharge can replace the conventional friction power generation system.

Interactions between pre-existing large pipelines and a new tunnel (기존 대구경 파이프라인과 신설터널간의 상호작용)

  • Jeong, Sun-Ah;Choi, Jung-In;Hong, Eun-Soo;Chun, Youn-Chul;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.175-188
    • /
    • 2009
  • When a new tunnel is excavated by the drill and blast method near pre-existing underground structures or tunnels due to the region restricted condition such as urban area, the ground will be relaxed by the excavation. In this case, issues can be created in terms of stability of pre-existing underground structures. One of major factors determining the stability of pre-existing underground structures can be a separation distance between pre-existing underground structures and a newly excavated tunnel. The region of ground relaxation defined by the plastic zone due to new excavation can be varied by separation distance. In this study, in other to estimate an influence of new tunnel excavation in terms of separation distance on the stability of pre-existing large pipelines, two-dimensional scaled model tests using plaster were performed for six models which have a different separation distance, The results show that based on the analysis of induced displacement during tunnel construction, the displacement decreases as the separation distance between large pipeline and new tunnel is increased until the distance is 2.5 times of pipeline diameter. Beyond this point, however, the displacement has become stabilized.

Thermal Performance Analysis of Multiple Thermal Energy Storage (TES) Caverns with Different Separation Distances Using Computational Fluid Dynamics (전산유체역학을 이용한 다중 열저장공동의 이격거리별 열적 성능 분석)

  • Park, Dohyun;Park, Eui-Seob;Sunwoo, Choon
    • Tunnel and Underground Space
    • /
    • v.24 no.3
    • /
    • pp.201-211
    • /
    • 2014
  • In the present study, the thermal performance of multiple rock caverns for large-scale thermal energy storage (TES) was numerically investigated for different separation distances between the caverns through heat transfer analysis using a computational fluid dynamics code, FLUENT. The thermal performance of multiple caverns was assessed in terms of the thermal stratification within the caverns and the heat loss to the surroundings, and the heating characteristics of the rock around the caverns were investigated. The results of numerical simulation showed that there was little difference in thermal performance between multiple TES caverns with different separation distances when the surrounding rock was less heated and it reached thermal steady-state, which represent the thermal states of the surrounding rock at the early and long-term operational stages of the TES caverns, respectively. However, as the separation distance decreased, the rock between the caverns reached thermal steady-state more quickly, and thus the heat loss from the caverns tended to converge rapidly to the value of heat loss occurred under thermal steady-state conditions in the surrounding rock. This result implies that the operating cost of heating the surrounding rock (i.e., rock heating) can be reduced with a reduction in the separation distance between multiple caverns, and suggests that the separation distance should be determined by considering the operating cost of rock heating as well as the construction cost of the caverns.

Probabilistic pounding analysis of high-pier continuous rigid frame bridge with actual site conditions

  • Jia, Hongyu;Zhao, Jingang;Li, Xi;Li, Lanping;Zheng, Shixiong
    • Earthquakes and Structures
    • /
    • v.15 no.2
    • /
    • pp.193-202
    • /
    • 2018
  • This paper studied the probability of pounding occurred between decks and abutments of a long span high-pier continuous rigid fame bridge subjected to ground motions with local soil effect. A pounding probability analysis methodology has been proposed using peak acceleration at bedrock as intensity measure (IM) for multi-support seismic analysis. The bridge nonlinear finite element (FE) models was built with four different separation distances. Effect of actual site condition and non-uniform spatial soil profiles on seismic wave propagating from bedrock to ground surface is modelled. Pounding probability of the high-pier bridge under multi-support seismic excitations (MSSE) is analyzed based on the nonlinear incremental dynamic analysis (n-IDA). Pounding probability results under uniform excitations (UE) without actual local site effect are compared with that under MSSE with site effect. The study indicates that the required design separation length between deck and abutment under uniform excitations is larger than that under MSSE as the peak acceleration at bedrock increases. As the increase of both separation distance between deck and abutment and the peak acceleration, the probability of pounding occurred at a single abutment or at two abutments simultaneously under MSSE is less than that under UE. It is of great significance considering actual local site effect for determining the separation distance between deck and abutment through the probability pounding analysis of the high-pier bridge under MSSE.

Probabilistic analysis of structural pounding considering soil-structure interaction

  • Naeej, Mojtaba;Amiri, Javad Vaseghi
    • Earthquakes and Structures
    • /
    • v.22 no.3
    • /
    • pp.289-304
    • /
    • 2022
  • During strong ground motions, adjacent structures with insufficient separation distances collide with each other causing considerable architectural and structural damage or collapse of the whole structure. Generally, existing design procedures for determining the separation distance between adjacent buildings subjected to structural pounding are based on approximations of the buildings' peak relative displacement. These procedures are based on unknown safety levels. This paper attempts to evaluate the influence of foundation flexibility on the structural seismic response by considering the variability in the system and uncertainties in the ground motion characteristics through comprehensive numerical simulations. Actually, the aim of this study is to evaluate the influence of foundation flexibility on probabilistic evaluation of structural pounding. A Hertz-damp pounding force model has been considered in order to effectively capture impact forces during collisions. In total, 5.25 million time-history analyses were performed over the adopted models using an ensemble of 25 ground motions as seismic input within OpenSees software. The results of the study indicate that the soil-structure interaction significantly influences the pounding-involved responses of adjacent structures during earthquakes and generally increases the pounding probability.