• Title/Summary/Keyword: seismic detonator

Search Result 2, Processing Time 0.02 seconds

Estimation of the continuity of inclined pits by tunnel channel wave investigation (터널 채널파를 이용한 사갱 연장성 규명)

  • 김중열;방기문;정현기
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.229-236
    • /
    • 2002
  • In this paper, a new novel technique of seismic survey is introduced to estimate the continuity of inclined pits filled with water, It was assumed that the pits would be connected to an abandoned railway tunnel that might be constructed in the past. Thus, detection of pit end was needed for the design of a new highway tunnel(Yukshimreong tunnel) that was likely to be met with a pit. In the beginning of exploration, no reliable, cost effective method was available. Hence, focus of interest moved toward the high impedance contrast(reflection coefficient k∼0.8) between water and rock. In this special model of sequence rock-water-rock, total reflection occurs and the seismic energy, when it is generated in the pit water, is nearly confined to the pit so that seismic waves can propagate much further within the pit. As a matter of convenience, this is called“tunnel channel wave”. With these considerations in mind, seismic detonator(2g) was used as a source at the entrance of pit, whereas hydrophone chain(hydrophone interval=1m) was placed on the bottom of pit. With this appropriate source-receiver arrangement, desirable down-going and up-going waves could be observed that will help conform the continuity of pits. After about one year, it was ascertained that the inclined pit of interest was just nearby crossed with the newly excavated tunnel, as it was predicted.

  • PDF

Estimation of reclaimed stone body by combined geophysical methods (정밀 물리탐사 병합기술에 의한 사석 투하량 조사)

  • Kim, Jung-Yul;Kim, Yoo-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.491-498
    • /
    • 2004
  • In recent years, as an effort to grasp the leading position in the field of maritime trading, new ports and container terminals arc now under construction. Old ports are extended. At the beginning, stones were thrown down to form stone embankments, that is stone-dams, in the outer and inner boundaries of the planned reclamation-land. S.C.P(Sand Compaction Pile) works are often needed to improve the stability of stone-dams, where marine sediments arc relatively thick. Here, interests are centered on the shape of stone body. In this, drilling work won't provide a sufficient resolution. In addition, the result corresponds to only one borehole point information. Thus, the aim of this paper is to introduce an affordable technology, that is, a combined geophysical method(seismic tomography + Televiewer) enables to get the whole information about stone-dam section. The measuring and evaluating procedure is described in detail with an emphasis on dealing with the use of seismic detonator, proper borehole deployment and integrated data analysis. Examples of field experiments at Busan new port are illustrated, which will prove the benefit of combined geophysical method.

  • PDF