• Title/Summary/Keyword: sediment budget in the channel

Search Result 2, Processing Time 0.015 seconds

Natural and Artificial Bed Change Analysis through Sediment Budget Analysis of Nakdong River Channel (before the Four Rivers Restoration Project) (낙동강 하도의 유사수지 분석을 통한 자연적 그리고 인위적 하상변동 분석(4대강살리기 사업 이전))

  • Son, Kwang Ik;Ji, Un
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.1
    • /
    • pp.1-8
    • /
    • 2015
  • General features of sediment budget for the Nakdong River before the Four Rivers Restoration Project were analyzed using surveying, dredging, and mining data for the past 20 years, as well as sediment data measured from the tributaries, and numerical modeling, etc. As a result of the sediment budget analysis of the Nakdong River before the Four Rivers Restoration Project, sediment inflow supplied from the watershed is $2,100,000m^3/yr$ and sediment outflow including mining and dredging volumes is $10,180,000m^3/yr$. Therefore, the bed change volume estimated by the sediment budget analysis is $-8,080,000m^3/yr$ of the bed erosion volume which is similar to the analysis result ($-8,300,000m^3/yr$) of natural and artificial bed changes using the surveyed data.

The Movable Hydraulic Model Test for Exchange of Intake Weir in the Nakdong River (낙동강 취수보개체를 위한 이동상 수리모형실험)

  • 김성원
    • Journal of Environmental Science International
    • /
    • v.9 no.1
    • /
    • pp.35-42
    • /
    • 2000
  • In this study, the movable bed model testing was carried out so as to analyze bed profile changes including predicting scouring and deposition of bed profile and to solve hydraulic problems affecting with bed and both-bank between upstream and downstream of intake weir in the Nakdong river channel. The movable bed model testing consists of fundamental test, movable model test and numerical analysis method respectively. The fundamental test was enforced to analyze relationship of discharge and sediment load in the tilting flume. When the movable model test was worked, it was shown that sediment budget between input sediment load and output sediment load was balanced exactly. As a result of movable model test, it was presented that scouring and deposition changes in quantities between the upstream and downstream of modification weir were less than those of nature and planning weir. Finally, numerical analysis method was operated by 1-dimensional bed profile changes model ; HEC-6 model so as to complement unsolving hard problems during movable model test. So, modification weir will sustained the stable bed profile changes than any other weirs in the study channel.

  • PDF