• Title/Summary/Keyword: scheduling framework

Search Result 182, Processing Time 0.027 seconds

Efficient Support for Adaptive Bandwidth Scheduling in Video Servers (비디오 서버에서의 효율적인 대역폭 스케줄링 지원)

  • Lee, Won-Jun
    • The KIPS Transactions:PartC
    • /
    • v.9C no.2
    • /
    • pp.297-306
    • /
    • 2002
  • Continuous multimedia applications require a guaranteed retricval and transfer rate of streaming data, which conventional file server mechanism generally does not provide. In this paper we describe a dynamic negotiated admission control and dick bandwidth scheduling framework for Continuous Media (CM : e.g., video) servers. The framework consists of two parts. One is a reserve-based admission control mechanism and the other part is a scheduler for continuous media streams with dynamic resource allocation to achieve higher utilization than non-dynamic scheduler by effectively sharing available resources among contending streams to improve overall QoS. Using our policy, we could increase the number of simultaneously running: clients that coo]d be supported and cot]d ensure a good response ratio and better resource utilization under heavy traffic requirements.

High -Level Synthesis for Asynchronous Systems using Transformational Approaches (변형기법을 이용한 비동기 시스템의 상위수준 합성기법)

  • 유동훈;이동익
    • Proceedings of the IEEK Conference
    • /
    • 2002.06b
    • /
    • pp.105-108
    • /
    • 2002
  • Although asynchronous designs have become a promising way to develop complex modern digital systems, there is a few complete design framework for VLSI designers who wish to use automatic CAD tools. Especially, high-level synthesis is not widely concerned until now. In this paper we Proposed a method for high-level synthesis of asynchronous systems as a part of an asynchronous design framework. Our method performs scheduling, allocation, and binding, which are three subtasks of high-level synthesis, in simultaneous using a transformational approach. To deal with complexity of high-level synthesis we use neighborhood search algorithm such as Tabu search.

  • PDF

Cost-Based Directed Scheduling : Part I, An Intra-Job Cost Propagation Algorithm (비용기반 스케쥴링 : Part I, 작업내 비용 전파알고리즘)

  • Kim, Jae-Kyeong;Suh, Min-Soo
    • Journal of Intelligence and Information Systems
    • /
    • v.13 no.4
    • /
    • pp.121-135
    • /
    • 2007
  • Constraint directed scheduling techniques, representing problem constraints explicitly and constructing schedules by constrained heuristic search, have been successfully applied to real world scheduling problems that require satisfying a wide variety of constraints. However, there has been little basic research on the representation and optimization of the objective value of a schedule in the constraint directed scheduling literature. In particular, the cost objective is very crucial for enterprise decision making to analyze the effects of alternative business plans not only from operational shop floor scheduling but also through strategic resource planning. This paper aims to explicitly represent and optimize the total cost of a schedule including the tardiness and inventory costs while satisfying non-relaxable constraints such as resource capacity and temporal constraints. Within the cost based scheduling framework, a cost propagation algorithm is presented to update cost information throughout temporal constraints within the same job.

  • PDF

Scheduling and Power Control Framework for Ad hoc Wireless Networks

  • Casaquite, Reizel;Yoon, Myung-Hyun;Hwang, Won-Joo
    • Journal of Korea Multimedia Society
    • /
    • v.10 no.6
    • /
    • pp.745-753
    • /
    • 2007
  • The wireless medium is known to be time-varying which could affect and result to a poor network's performance. As a solution, an opportunistic scheduling and power control algorithm based on IEEE 802.11 MAC protocol is proposed in this paper. The algorithm opportunistically exploits the channel condition for better network performance. Convex optimization problems were also formulated i.e. the overall transmission power of the system is minimized and the "net-utility" of he system is maximized. We have proven that an optimal transmission power vector may exist, satisfying the maximum power and SINR constraints at all receivers, thereby minimizing overall transmission power and maximizing net-utility of the system.

  • PDF

Project scheduling by FGP to Time-Cost-Quality trade off: construction case study

  • Faregh, Najmeh;Ketabi, Saeedeh;Ghandehari, Mahsa
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.53-59
    • /
    • 2014
  • Project managers are responsible to conduct project on time with least amount of costs and the most possible quality with respect to shortage of resources and environmental certainties. They have to make the best decision to reach such conflicting objects. In this study the project scheduling with multi goals-multi modes was planned in fuzzy conditions under resource constraints and expanded by fuzzy goal programing (FGP). The project cost was calculated by the price of renewable resources and the quality criteria were evaluated by the quality function deployment method (QFD). Finally the model was verified by a construction case study with 22 activities along with solving by GAMS. The results showed that this model could provide a systematic framework to facilitate the decision making process and made the project managers to be able to schedule the project closer to reality.

Analysis on a Combined Model of Competitive Bidding and Strategic Maintenance Scheduling of Generating Units (발전력의 경쟁적 입찰전략과 전략적 보수계획에 대한 결합모형 연구)

  • Lee, Kwang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.9
    • /
    • pp.392-398
    • /
    • 2006
  • Maintenance scheduling of generating units (MSU) has strategic dimension in an oligopolistic market. Strategic MSU of gencos can affect a market power through capacity withdrawal which is related to bidding strategy in an generation wholesale market. This paper presents a combined framework that models the interrelation between competitive bidding and strategic MSU. The combined game model is represented as some sub-optimization problems of a market operator (MO) and gencos, that should be solved through bi-level optimization scheme. The gradient method with dual variables is also adopted to calculate a Nash Equilibrium (NE) by an iterative update technique in this paper. Illustrative numerical example shows that NE of a supply function equilibrium is obtained properly by using proposed solution technique. The MSU made by MO is compared with that by each genco and that under perfect competition market.

Machine Diagnosis and Maintenance Policy Generation Using Adaptive Decision Tree and Shortest Path Problem (적응형 의사결정 트리와 최단 경로법을 이용한 기계 진단 및 보전 정책 수립)

  • 백준걸
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.33-49
    • /
    • 2002
  • CBM (Condition-Based Maintenance) has increasingly drawn attention in industry because of its many benefits. CBM Problem Is characterized as a state-dependent scheduling model that demands simultaneous maintenance actions, each for an attribute that influences on machine condition. This problem is very hard to solve within conventional Markov decision process framework. In this paper, we present an intelligent machine maintenance scheduler, for which a new incremental decision tree learning method as evolutionary system identification model and shortest path problem as schedule generation model are developed. Although our approach does not guarantee an optimal scheduling policy in mathematical viewpoint, we verified through simulation based experiment that the intelligent scheduler is capable of providing good scheduling policy that can be used in practice.

Reservation based Resource Management for SDN-based UE Cloud

  • Sun, Guolin;Kefyalew, Dawit;Liu, Guisong
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.12
    • /
    • pp.5174-5190
    • /
    • 2016
  • Recent years have witnessed an explosive growth of mobile devices, mobile cloud computing services offered by these devices and the remote clouds behind them. In this paper, we noticed ultra-low latency service, as a type of mobile cloud computing service, requires extremely short delay constraints. Hence, such delay-sensitive applications should be satisfied with strong QoS guarantee. Existing solutions regarding this problem have poor performance in terms of throughput. In this paper, we propose an end-to-end bandwidth resource reservation via software defined scheduling inspired by the famous SDN framework. The main contribution of this paper is the end-to-end resource reservation and flow scheduling algorithm, which always gives priority to delay sensitive flows. Simulation results confirm the advantage of the proposed solution, which improves the average throughput of ultra-low latency flows.

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF