Condition Estimation of Facility Elements Using XGBoost (XGBoost를 활용한 시설물의 부재 상태 예측)

  • Chang, Taeyeon;Yoon, Sihoo;Chi, Seokho;Im, Seokbeen
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.31-39
    • /
    • 2023
  • To reduce facility management costs and safety concerns due to aging of facilities, it is important to estimate the future facilities' condition based on facility management data and utilize predictive information for management decision making. To this end, this study proposed a methodology to estimate facility elements' condition using XGBoost. To validate the proposed methodology, this study constructed sample data for road bridges and developed a model to estimate condition grades of major elements expected in the next inspection. As a result, the developed model showed satisfactory performance in estimating the condition grades of deck, girder, and abutment/pier (average F1 score 0.869). In addition, a testbed was established that provides data management function and element condition estimation function to demonstrate the practical applicability of the proposed methodology. It was confirmed that the facility management data and predictive information in this study could help managers in making facility management decisions.

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

Failure Rate of Solar Monitoring System Hardware using Relex (Relex 를 이용한 태양광 모니터링 시스템 하드웨어 고장률 연구)

  • An, Hyun-sik;Park, Ji-hoon;Kim, Young-chul
    • Journal of Platform Technology
    • /
    • v.6 no.3
    • /
    • pp.47-54
    • /
    • 2018
  • Predictive analysis in the hardware industry can be performed at an appropriate point in time to prevent failure of production facilities and reduce management costs. This helps to perform more efficient and scientific maintenance through automation of failure analysis. Among them, predictive management aims to prevent the occurrence of anomalous state by identifying and improving the abnormal state based on the gathering, analysis, and scientific data management of facilities using information technology and constructing prediction model do. In this study, we made a fault tree through the Relex tool and analyzed the error code of the hardware to study the safety.

A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction (국내 철근공사 실태분석 및 개선방안에 관한 연구)

  • Park, U-Yeol;Kim, Gwang-Hui;Gang, Gyeong-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey

Automatic Guided Vehicle Design and Implementation for Intelligent Unmanned Mobile systems (지능형 무인 이동 시스템을 위한 Automatic Guided Vehicle 설계 및 구현)

  • Kang, Jin Gu
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.1
    • /
    • pp.73-79
    • /
    • 2014
  • In this study, the unmanned vehicle to develop a preliminary step, we were facilities for Automated Guided Vehicle (AGV) simulator is designed and implemented. Industry is increasingly the more advanced automation and management systems need to be efficient. These studies are at least 24-hour continuous unmanned vehicles and personnel can result in reduction of labor costs. In addition, safety accidents can be minimized in the industry as an effect of intelligent AGV is essential. This study is the initial step for the development of AGV. manufactured simulator to Simulation and drives the performance of the system is evaluated. The configuration of the simulator, ultrasonic sensors, infrared sensors, and using the obstacle were to follow a given path. In addition, two-way communication between the host computer and the main processor that was. communication method that IEE802.11 meets the standard is applied to high-speed wireless LAN systems, each of the sensor information is calculated. AGV having a drive shaft 4 of the four wheels are respectively independent structure. AGV's main processor is driven using a high-performance DSP, and the controller controls the steering device of the load could be significantly reduced.

COVID-19's Effect on a Hotel Construction: A Case Study

  • Kayastha, Rujan;Kisi, Krishna P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.649-657
    • /
    • 2022
  • The COVID-19 pandemic has unprecedented impacts on different sectors around the globe. The effects observed in developing countries are even more severe. Some projects stopped while many have cost and time overrun issues. This paper conducted a case study on the COVID-19's effects on a hotel construction project in Nepal. The study reviewed the literature on COVID-19 and its impact on construction sectors and conducted a semi-structured interview with the project's personnel. The interview response was analysed and the contributing factors that impacted the project and its performance were identified. The paper found financial, operational, contractual, safety, and risk management issues in the hotel project. Overall, the project cost increased by 32% where the material cost increased by 35% and labor cost increased by 28%. This research discusses causes, measures, and provides a broad perspective of the problems, significant challenges, and opportunities associated with the effects of COVID-19 on the construction industry. The Owner as well as the Contractors incurred added costs because of COVID-19. The paper identified contributing factors and presented the challenges which could be used as opportunities to minimize unforeseen impacts of the pandemics in near future. The lesson learned from this case study was that the labor cost and materials cost could have been minimized if the Owner and the Contractor had established alternative resources such as using locally available labor, materials, and alternative suppliers.

  • PDF

A Study on The Design and Structural Strength of L-Type Davit with Electric Cylinder Type Actuator for Offshore Plant and Ship (해양플랜트·선박용 전기실린더형 액추에이터를 탑재한 L타입 데빗의 설계 및 구조강도에 관한 연구)

  • Young-Hun Kim;Da-Seoung Kwak;Ki-Hyun Park;Jae-Rin Shim;Yong-Won Cho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.1
    • /
    • pp.175-181
    • /
    • 2023
  • In offshore plants, various equipments including cranes and davits are used for safety management. Hydraulic cylinder type actuators are mainly used for luffing operations such as cranes and davits. However, in the case of a cylinder using hydraulic pressure, a separate power pack is required to supply hydraulic pressure. When used for a long time, maintenance costs such as sticking of hydraulic valves, contamination of hydraulic oil and deterioration of hydraulic hoses occur. In addition, a lot of hydraulic oil is used in the handling of cranes and davits, which causes marine pollution due to management problems. As a result, as interest in marine pollution prevention has increased recently, interest in actuators that do not use hydraulic pressure is also increasing. Therefore, in this study, we intend to develop a davit with an electric cylinder type actuator that uses electricity rather than hydraulic pressure by the SOLAS regulation. In other words, the conceptual design of the davit driven through the linear motion of the ball screw using electricity is performed, and the structural safety of the drive is also reviewed so that it can be utilized in the industrial field.

A Deep Learning Framework for Prediction of Apartment Repair and Maintenance Costs (아파트 수선유지 비용 예측을 위한 딥러닝 프레임워크 제안)

  • Kim, Ji-Myong;Son, Seunghyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.355-362
    • /
    • 2024
  • The sustained upkeep of apartment buildings necessitates ongoing maintenance and timely repairs, particularly given their complex nature due to extensive areas, common facilities, and multiple residential and service structures. Additionally, the need for cost-effective maintenance is paramount for ensuring safety, preserving value, and maintaining economic efficiency. However, the multitude of external variables influencing apartment complex maintenance, coupled with the challenges in data collection, have resulted in limited research in this domain. To address this gap, the current study aims to develop a framework for predicting maintenance costs utilizing deep learning techniques, grounded in real-world apartment complex maintenance cost data. This study intends to provide a practical and valuable contribution to the field of apartment complex management, empowering stakeholders with enhanced predictive capabilities for optimizing maintenance strategies and resource allocation.

Improvement Plan for Construction Management and Legislation of Donation Collection Facilities (기부채납 시설의 건설관리 및 법제에 관한 개선방안)

  • Lee, Juyong;Jung, Youngchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.3-12
    • /
    • 2024
  • The donation collection system to secure infrastructure and land necessary for public development projects has been actively applied as an effective means of realizing public interest and the concept of recovering development profits, and has contributed greatly to society in public difficult financial conditions. However, due to the ambiguous legal standards and lack of legal grounds for the operation of the donation collection system, it has been arbitrarily used for administrative convenience in the form of granting a donation collection assistant to install infrastructure. In addition, infrastructure is a facility that is constructed and donated within development profits to obtain licenses, and is promoted to minimize construction costs to improve profitability, posing a risk of poor infrastructure planning, design, and construction, resulting in increased safety and maintenance costs for citizens. Continuous system and legal improvement are needed to improve the excellence, convenience, and safety of facilities that citizens will use for half a century through the improvement of the donation system.

A Study on the Scope of the Recognized Equity Capital of Developer in Real Estate Project Finance Loan Screening (부동산 PF를 위한 시행사의 자본금 인정범위에 관한 연구)

  • Lim, Suhong;Jang, Hokwan;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.75-83
    • /
    • 2020
  • This study intends to explore the scope of the recognized equity capital of developer in real estate project finance loan screening. The factors which can be recognized as equity capital are categorized into 24 factors with 3 upper categories and 6 mid categories. In order to develop the importance weight of factors, AHP and Fuzzy methodologies are implemented based on survey analysis by experts in financial institutions. Research findings indicate that the land cost, evacuation cost, and real estate acquisition tax as land-related direct costs, and the design cost, traffic impact assessment cost, underground safety impact assessment cost, boundary surveying cost, and geological survey cost as the construction permit-related costs are higher than any others. On the other hand, the supplementary costs related to the operation of the developer show very low importance weight. Accordingly, the hierarchy of factors for equity capital should be clearly developed in order to minimize any dispute and prevent non-performing loans to real estate project finance.