Biotechnology has reached the level of giving birth to new forms of life and with this is a growing controversy in the conflict between science and ethics. Especially, GMOs are closely linked to the food products we consume and thus, the majority of the public shows a very sensitive reaction to the safety of GMO food products. Many perspectives arose surrounding the issues of safety on the human body and the ecology. This outlines diverse structural mechanisms to be set up to ensure safety such as risk assessment, risk management etc. Despite the precautionary principle guaranteed in many ways, the problem arises whether and how this principle can be taken in the safety assessment. GMOs due to its uniqueness do not end with just the possession of the technology involved but must also be considered with the prerequisite that they could be cultured again. Therefore the reinforcement of safety assessment system is necessary. That is, the reinforcement of risk assessment including field tests, the consideration of socio-economic effects, the coordinated system of relevant authorities, the development of technology for safety assessment.
The Railway Safety Management System is based on risk management and the basic purpose of risk management is safety management activities to prevent railway accidents and operational obstacles in advance. In order to manage risk, an acceptable risk standard must be established. This risk criterion is used to evaluate the railway risk with both frequency and severity. In the case of overseas railway or other industrial sectors, various factors are reflected in the main variables that constitute the occurrence frequency, but this is no the case in the domestic railway sector. In particular, the current risk assessment criteria in the railway sector remain at a level that exploits the incidents that have occurred in the past and the severity of the property damage and it dose not properly reflect complex and diverse environmental and situational changes in railway operations. Therefore, in this study, it is possible to calculate the potential occurrence of future events instead of occurrence frequency as a component of the risk assessment criteria, focusing on the High-Speed Railway. In addition to the property damage to the consequence, we suggest a rational methodology, development direction, and theoretical implications for constructing accurate and reasonable risk criteria including actual damage such as human injury and time loss.
Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.
Tae Hyun Park;Ji Hwan Song;Sa Ho Chun;Hee Rae Joe;Pil Jun Yoon;Ho Yeon Kang;Myeong Seon Ku;Jin Hyeok Son;Cheol Min Lee
Journal of Environmental Health Sciences
/
v.50
no.2
/
pp.138-145
/
2024
Background: Appropriateness issues have emerged regarding the non-application of hazardous substance safety standards for items classified as 'other textile products'. Objectives: Testing for formaldehyde (HCHO) and risk assessment were conducted on 'other textiles products' to provide reference data for promoting product safety policies. Methods: Testing was conducted on five items (102 products) classified as 'other textile products' according to relevant standards (textile products safety standards), and the risk of each product was assessed using the evaluation methodologies of the European Centre for Ecotoxicology and Toxicology of Chemicals (ECETOC) and European Chemical Agency (ECHA). Results: Out of the 102 products tested, HCHO was detected above the quantification limit in five. Based on these results, the screening risk assessment indicated that three products exceeded the criteria. Upon reassessing the emission and transfer rates of products exceeding the criteria, it was confirmed that there were no instances of exceeding the criteria. Conclusions: Risk assessment results can be used as supporting data for non-application of hazardous substance standards. However, it is deemed necessary to transition towards a management approach based on risks in order to addressing emerging trends such as convergence/new products.
Sawmilling industry remained a high risk with the average 4.73% of industrial accidents in 2010-2012 that was eight times that of general manufacturing. Sawmilling industry had 200 industrial accidents victim in average. Manufacturing process in sawmill industry contained dangerous machinery such as conveyors, roller, saw ( band saw, circular saw) etc. It may be effective to figure out the type of industrial accidents occurred in the past and extend risk assessment which can predict hazard such as near miss when implementing exposure or potential dangers in sawmill industry. This study conducted research on the actual condition on the place of industrial accident occurrence, detailed work and contact object when injured, and injured part targeting 643 businesses which had industrial accidents in 2010-2012. As the results, RPN of general sawmill industry was the highest 'ganglip saw' with 36,157. RPN of the following order were 'moving truck' with 25,454, 'special machining operations' with 22,283. Also, probability of general sawmill industry was a lots within 1 year, while risk appeared a lots within 5 years. So, risk assessment shall be needed to emphasis on accident prevention of sawmill industry. And additional work will be needed on the risk assessment in hazard prevention work of supervisors.
A Safety Case is an railway organization's formal arrangement, through the provision of policies, resources and processes, to ensure the safety of its work activity within safety management system. An effective system helps the organization to identify and manage risks effectively. It allows an organization to demonstrate its capability in achieving its safety objectives and in meeting regulatory requirements. The purpose of this research is to give how to the risk assessments are described within Railway Safety Cases can be prepared and maintained to meet the criteria specified by the upcoming railway regulations. Through this research, we propose the elements of safety management system that include arrangements for the ongoing identification of hazards, assessment of risks and the implementation of necessary control measures.
Kim, Min-Su;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
Journal of the Korean Society of Safety
/
v.24
no.3
/
pp.96-101
/
2009
In this study, a risk-appearance frequency evaluation model for railway level-crossing accidents is developed with the frequency estimation based on the accident history. It follows the worldwide common safety management approach and reflects the operation conditions and accident properties of the domestic railway system. The risk appearance frequency evaluation process contains a development of accident scenarios by defining the system configurations and functions, and a frequency estimation of hazardous events based on the accident history. The developed model is verified with the accident history during 5 years('03-'07) for 3 hazardous events: 'Being trapped in level crossing(Hl)', 'Crossing during warning signal(H2)' and 'Breaking through/detouring the barrier(H3)'. This risk appearance frequency evaluation model will be combined with a consequence evaluation model so as to offer full risk assessment for the railway accident. The accident risk assessment will contribute to improving the safety management of the railway system.
Proceedings of the Safety Management and Science Conference
/
2011.04a
/
pp.719-730
/
2011
The live-line works are very dangerous works on direct contacts or neighboring contacts with the distribution line. But most of domestic electrical construction companies that have performed live-line works are small-scale companies. Accordingly, safety management system and manuals to insure worker's safety haven't sufficiently had. In this paper, risk and status of accidents for the live-line works were analyzed and the necessity of introducting risk assessment for live-line works was identified by a questionnaire survey of electrical construction companies and education institutions.
The Fukushima Dai-Ichi accident in 2011 has affected various aspects of the nuclear society worldwide. The accident revealed some problems in the conventional approaches used to ensure the safety of nuclear installations. To prevent such disastrous accidents in the future, we have to learn from them and improve the conventional approaches in a more systematic manner. In this paper, we will cover three issues. The first is to identify the key issues that affected the progress of the Fukushima Dai-Ichi accident greatly. We examine the accident from a defense-in-depth point of view to identify such issues. The second is to develop a more systematic approach to enhance the safety of nuclear installations. We reexamine nuclear safety from a risk point of view. We use the concepts of residual and unknown risks in classifying the risk space. All possible accident scenarios types are reviewed to clarify the characteristics of the identified issues. An approach is proposed to improve our conventional approaches used to ensure nuclear safety including the design of safety features and the safety assessments from a risk point of view. Finally, we address some issues to be improved in the conventional risk assessment and management framework and/or practices to enhance nuclear safety.
The railway system consists of rolling stocks, facilities, electrical system, signaling and operation and so on, organically bound. Recently due to lots of train failures and accidents, especially the derailment related to track irregularity this year, all the people using the train are worried about railway safety and we paved the way for letting them knowing that all components of railway system are so important. As a result, most of developed countries operating railway have used to risk assessment methods about safety management to prevent railroad accidents in advance. The purpose of this paper is to find out how to closely apply to track field for risk assessment methods. Because there is no case to apply to and we're not interested in yet, despite of importance of track, in situations of higher train speed. Therefore, in this study we're going to investigate risk assessment methods and compare enire railway system with track system, eventually we want us try to present to safety management conditions necessary and secure safety improvement in track field.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.