• 제목/요약/키워드: safety cost

검색결과 2,778건 처리시간 0.028초

안전성을 고려한 품질특성 선정 및 자원배분 (Quality Characteristic Choice and Resources Allocation under Consideration of Safety)

  • 김종걸;정진호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2004년도 추계학술대회
    • /
    • pp.245-252
    • /
    • 2004
  • This paper presents a method for choosing quality characteristics to consider safety by integrating QFD based on quality requirements and AHP based on safety requirements, also shows resources allocation method to maximize customer satisfaction by ranking the index of technical importance to cost.

  • PDF

건설공사 현장 안전관리 인적 체계 효율성 개선에 관한 연구 (A Study on Efficiency Improvement of the Safety Management Personnel System in Construction Site)

  • 유희재
    • 대한안전경영과학회지
    • /
    • 제20권1호
    • /
    • pp.11-21
    • /
    • 2018
  • Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's worker due to vertical integration, which is characteristic of the construction industry, together to the contractor, the safety management system is based on a safety construction system in which a worker who has a certain qualification condition such as career experience of the work type, work understanding of the work type, and management experience of the work type among the subcontractor, when we manage based on mutual personality which is the personality of interpersonal relationship that can communicate with each other by work type, process and grouping, it is concluded that effective and practical safety management can be achieved to reduce the accident rate and loss cost.

e-CA(e-Consequence Analysis)를 활용한 위험설비의 비용 분석에 관한 연구 : 강관제조업 사례를 중심으로 (A Study on the Cost Analysis of risk facilities using e-Consequence Analysis - Focusing Steel pipe Industry)

  • 권혁민;황용우;이익모;천영우;최영훈
    • 대한안전경영과학회지
    • /
    • 제20권3호
    • /
    • pp.27-36
    • /
    • 2018
  • The steel pipe manufacturing industry deals with facilities and materials. Especially thermal facilities are close to vapor cloud explosion (VCE) and may cause secondary damage to facilities because they deal with corrosive substances such as hydrofluoric acid, sulfuric acid and acid, fire, explosion, leakage etc. It is in danger. In this study, hazard identification method was conducted using HAZOP techniques and quantitative risk analysis was conducted using e-CA, a program that supports accident impact analysis. Equipment in the influence range of ERPG - 3 was determined to be a facility requiring replacement. It was decided that neutralization is necessary using slaked lime. Based on the cost of loss, We presented the proper replacement which is the timing of the dangerous facility. As a result, It was ideal to replace the facilities with 20 years of heat treatment facilities, one year of hydrofluoric acid storage tank, 20 years of sulfuric acid storage tank, and 5 years of hydrochloric acid storage tank.

도시가스 배관의 위험평가 방법론 제시 (An Approach to Risk Assessment of City Gas Pipeline)

  • 박교식;이진한;조영도;박진희
    • 한국가스학회지
    • /
    • 제7권1호
    • /
    • pp.33-40
    • /
    • 2003
  • 본 연구에서는 위험을 등급화하여 검사대상 및 주기를 결정하여 투자비용기 효용성을 높이는 기술의 접근방법을 도입하여, 위험의 정도뿐만 아니라 위험의 양(손실비용)을 평가 할 수 있는 활용 방법을 제시하였다. 위험의 정량화를 위해 가스배관의 손상확률과 영향을 예측하는 방법이 필요한데 손상확률의 경우 사고원인을 굴착공사, 외부부식, 지반침하 및 장치손상으로 구분하였고, 그 각각의 원인에 대해 사고발생빈도를 구하는 방법을 제시하였으며 영향을 예측하기 위하여 가스의 누출시 주로 피해를 유발하는 화제에 대해 사망, 화상 및 건물에 피해를 줄 수 있는 경우 그 피해범위를 산정하는 방법을 제시하였다. 또한, 이 확률과 영향을 결합하여 위험비용을 예측하는 방법과 그 결과를 예시하였는데 이 기술은 경제적인 측면을 고려한 종합적 안전관리 기술로서 위험관리가 중요한 도시가스업계에 적용된다면, 위험을 줄일 수 있는 최적의 위험감소 전략 수립에 유용한 정보를 제공할 수 있다.

  • PDF

경사식 방파제의 비용 최적화에 기초한 부분안전계수 및 목표파괴확률 산정 (Estimation of Partial Safety Factors and Target Failure Probability Based on Cost Optimization of Rubble Mound Breakwaters)

  • 김승우;서경덕
    • 한국해안·해양공학회논문집
    • /
    • 제22권3호
    • /
    • pp.191-201
    • /
    • 2010
  • 방파제는 인명 피해의 우려가 적은 구조물이기 때문에 주로 비용 최적화를 고려하여 설계한다. 하지만 대부분의 국내 방파제는 비용최적설계를 고려하지 않았다. 본 연구에서는 비용최적설계를 국내의 경사식 방파제에 적용하여 최적설계중량과 목표파괴확률 그리고 부분안전계수를 산정하였다. 사용한 방법은 PIANC Working Group 47의 Hans F. Burcharth and John D. Sorensen에 의해 개발된 것이다. 최적재현기간은 많은 경우에 50년으로 계산되었고 실질이자율이 높을 경우에 100년으로도 계산되었다. 최적재현기간에 해당하는 파괴확률과 기존 구조물의 신뢰성 해석에서 얻은 파괴확률을 사용하여 목표파괴확률을 제안하였다. 국내 설계기준인 초기한계상태의 최종적인 목표파괴확률은 약 60%이며 이에 상응하는 전체안전계수는 1.09이다. 이는 현행 설계법보다 9% 큰 공칭직경과 30% 큰 설계중량을 요구한다. 또한 비용최적설계를 고려한 부분안전계수를 산정하여 비용을 고려하지 않는 Level 2의 부분안전계수와 비교하였고 목표파괴확률이 40% 미만일 때 두 방법이 비교적 잘 일치함을 보였다.

Design Improvement for the Cooling System of the Interim Spent Fuel Storage Facility Using a PSA Method

  • Ko, Won-Il;Park, Jong-Won;Park, Seong-Won;Lee, Jae-Sol;Park, Hyun-Soo
    • Nuclear Engineering and Technology
    • /
    • 제28권5호
    • /
    • pp.440-451
    • /
    • 1996
  • With emphasis on safety, this study addresses for better design condition for the cooling system in a wet-type interim spent fuel storage facility, using a probabilistic safety assessment method. To incorporate the design renovation into the design phase, a simple approach is proposed. By taking the cooling system of a reference design, a fault tree analysis was performed to identify the weak point of the considered system, and then basic factors for design renovation were defined. A total of 21 design alternatives were selected through the combination of the basic factors. Finally, the optimum design alternative for the cooling system is derived by means of the cost and effect analysis based on the estimated cost, system reliability and assumed probabilistic safety criteria. With the assumption that the failure frequency of at-reactor spent fuel cooling system compiles with probabilistic safety criteria for the interim spent fuel cooling system, it was shown that the optimum alternative should have l00% cooling loop redundancy with one pump per cooling loop and a cleanup system installed separately from the main loop. Furthermore, it also should be classified into safety system. The result of this study can be used as a useful basis to identify factors of safety concern and to establish design requirements in the future. The method also can be applied for other nuclear facilities.

  • PDF

How to Use an Optimization-Based Method Capable of Balancing Safety, Reliability, and Weight in an Aircraft Design Process

  • Johansson, Cristina;Derelov, Micael;Olvander, Johan
    • Nuclear Engineering and Technology
    • /
    • 제49권2호
    • /
    • pp.404-410
    • /
    • 2017
  • In order to help decision-makers in the early design phase to improve and make more cost-efficient system safety and reliability baselines of aircraft design concepts, a method (Multi-objective Optimization for Safety and Reliability Trade-off) that is able to handle trade-offs such as system safety, system reliability, and other characteristics, for instance weight and cost, is used. Multi-objective Optimization for Safety and Reliability Trade-off has been developed and implemented at SAAB Aeronautics. The aim of this paper is to demonstrate how the implemented method might work to aid the selection of optimal design alternatives. The method is a three-step method: step 1 involves the modelling of each considered target, step 2 is optimization, and step 3 is the visualization and selection of results (results processing). The analysis is performed within Architecture Design and Preliminary Design steps, according to the company's Product Development Process. The lessons learned regarding the use of the implemented trade-off method in the three cases are presented. The results are a handful of solutions, a basis to aid in the selection of a design alternative. While the implementation of the trade-off method is performed for companies, there is nothing to prevent adapting this method, with minimal modifications, for use in other industrial applications.

지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구 (A study on the safety improvement and productivity's increase through continuous preventive maintenance)

  • 양두진;이창호
    • 대한안전경영과학회지
    • /
    • 제7권1호
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.