• Title/Summary/Keyword: rubble-mound

Search Result 179, Processing Time 0.021 seconds

Development of Stochastic Markov Process Model for Maintenance of Armor Units of Rubble-Mound Breakwaters (경사제 피복재의 유지관리를 위한 추계학적 Markov 확률모형의 개발)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.2
    • /
    • pp.52-62
    • /
    • 2013
  • A stochastic Markov process (MP) model has been developed for evaluating the probability of failure of the armor unit of rubble-mound breakwaters as a function of time. The mathematical MP model could have been formulated by combining the counting process or renewal process (CP/RP) on the load occurrences with the damage process (DP) on the cumulative damage events, and applied to the armor units of rubble-mound breakwaters. Transition probabilities have been estimated by Monte-Carlo simulation (MCS) technique with the definition of damage level of armor units, and very well satisfies some conditions constrained in the probabilistic and physical views. The probabilities of failure have been also compared and investigated in process of time which have been calculated according to the variations of return period and safety factor being the important variables related to design of armor units of rubble-mound breakwater. In particular, it can be quantitatively found how the prior damage levels can effect on the sequent probabilities of failure. Finally, two types of methodology have been in this study proposed to evaluate straightforwardly the repair times which are indispensable to the maintenance of armor units of rubble-mound breakwaters and shown several simulation results including the cost analyses.

Stochastic Reliability Analysis of Armor Units of Rubble-Mound Breakwaters Subject to Multiple Loads (다중하중에 따른 경사제 피복재의 추계학적 신뢰성 해석)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.24 no.2
    • /
    • pp.138-148
    • /
    • 2012
  • A stochastic reliability analysis model has been developed for evaluating the time-dependent stability performance of armor units of rubble-mound breakwaters subjected to the multiple loads of arbitrary magnitudes which could be occurred randomly. The initial structural capacities and the damage rates of armor units of rubble-mound breakwaters could be estimated as a function of the incident wave height with a given return period by using the modified Hudson's formula and Melby's formula. The structural stability performances of armor units of rubble-mound breakwaters could be analyzed in detail through the lifetime reliability investigations according to the limit states such as the serviceability or ultimate limit state and the conditions of multiple loads. Finally, repair intervals for the structural management of armor units of rubble-mound breakwaters could quantitatively be evaluated by a new approach suggested in this paper that has been based on the target probability for repair and the accumulated probabilities of failure obtained from the present stochastic reliability analysis model.

Experiments on Stability of Armor Rocks on Rear Slope of Rubble Mound Structures under Wave Overtopping Condition with Rectangular Crest Element (월파조건에서 직사각형 상치콘크리트가 설치된 경사제 항내측 사면에 거치된 피복석의 안정성 실험)

  • Young-Taek Kim;Jong-In Lee
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.35 no.5
    • /
    • pp.102-108
    • /
    • 2023
  • In this study, hydraulic model tests were performed to investigate the stability of armor units at harbor side slope for rubble mound structures. The armor units on the rear slope were rocks. The Korean design standard for harbor and fishery port suggested the design figures that showed the ratio of the armor weight for each location of rubble mound structures and it could be known that the same weight ratio was needed to the sea side and rear side slope of rubble mound structures. The crest elements were commonly applied to the design process of rubble mound structures in Korea and the investigation of the effects of super structures would be needed. The damage rate (S =2) was applied and the stable wave height was measured for each test condition. The results were suggested as the armor weight ratio of the rear side slope(armor rock) to the sea side slope (tetrapod) in relation to the relative crest height.

A Study of the Economic Design of Rubble Mould Breakwaters Using ADS(Automated Design Synthesis) Optimization Program (ADS 최적화 프로그램을 이용한 사석 방파제의 경제성 설계에 관한 연구)

  • 민석진;김성득
    • Journal of Ocean Engineering and Technology
    • /
    • v.17 no.6
    • /
    • pp.16-22
    • /
    • 2003
  • In this paper, the method of determining the economically-optimal design section of rubble mound breakwater, using ADS program, was studied to supplement the deterministic approach. First of all, the design waves are computed, according to the return periods, using the Weibull distribution from the data of waves at the location of the breakwater. In order to take an optimal section, according to the return periods, the ADS program was used. The restriction conditions and objective functions are decided from the references of the specifications and standard manuals for Coastal and Harbor Construction Work. Results from this study support the ADS program as an appropriate method for determining the economically-optimal section of rubble mound breakwater, comparing the construction costs and the initial and damage repair costs for its life time.

Wave Overtopping Characteristics of Rubble Mound Revetment and Wave Absorbing Revetment (사석 경사제 및 소파블록 경사제 호안의 월파특성)

  • Lee, Won;Park, Jin-Ho;Cho, Yong-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.443-445
    • /
    • 2008
  • Determination of allowable overtopping rate for coastal structure is a key point to determine the application of background of coastal structure while considering safety and economic efficiency. Thus, the accurate estimation of overtopping rate against coastal structure is essential. In general, estimation of overtopping against the coastal structure is based on an empirical formula or hydraulic experiment. In this study, we investigate the behavior of overtopping for rubble mound coastal structure with rubble armor stone and wave dissipating block using hydraulics experiment, and domestic or foreign design standard.

  • PDF

Empirical Formula for Wave Runup of Rubble-Mound Structure Covered by Tetrapods: 1:1.5 Slope Condition (TTP로 피복된 경사식구조물의 처오름높이 산정식: 사면경사 1:1.5 조건)

  • Lee, Jong-In;Bae, Il-Ro
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.845-852
    • /
    • 2015
  • The runup height is an important design parameter to determine the crest elevation of coastal structures and seawalls. In this study, two dimensional wave runup tests for rubble-mound structure covered by tetrapods were conducted. Incident waves at the toe include nonbreaking, breaking and broken random wave conditions. A empirical formula to predict runup elevation of rubble-mound structure with 1:1.5 front slope was proposed on the basis of physical model test results using a surf similarity parameter. The test results from this study were compared with those from van der Meer and Stam(1992).

Determination of Minimum Weight of Armor Unit of Rubble-Mound Breakwater (방파제 사석 중량 산정)

  • 유동훈;이대석;구석근
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.13 no.4
    • /
    • pp.319-326
    • /
    • 2001
  • This paper reports on a recent investigation to determine criteria for the design of rubble-mound breakwaters. Existing theories and empirica] equations have been carefully reviewed and a new relation is proposed for the determination of optimum weight of armor unit of rubble-mound breakwater. A new parameter is introduced into the new semi-theoretical equation, which is closely related with the surface particle velocity of wave motion. The laboratory data reported by van der Meer(1987) were used for the determination of proper relations of empiricat parameters introduced into the new empirical equation.

  • PDF

Study on Assessment of Displacement by Wave Force for Rubble Mound Breakwater and its Application to Design (파랑하중을 받는 굴착치환 사석경사식 방파제의 침하량 산정과 설계 적용성에 관한 연구)

  • Ahn, Ik-Seong;Park, Sang-Kil
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.4
    • /
    • pp.413-420
    • /
    • 2008
  • Wave force is an important factor which gives a direct affect to stability of the rubble mound breakwater. Particularly wave force has been considered as the main cause of displacement for replaced rubble mound breakwater which permits a little displacement to some degree. But the effect on displacement by wave force has not been considered and reflected in design. Therefore in this study, we compared numerical analysis displacement with field measured displacement so that the effect of wave force on displacement can be reflected in design. Result of the numerical analysis displacement was well consistent with field measured displacement data.

Expected Overtopping P개bability Considering Real Tide Occurrence

  • Kweonl, Hyuck-Min;Lee, Young-Yeol;Oh, Young-Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.479-483
    • /
    • 2004
  • A new calculation method of expected overtopping probability of rubble mound breakwater considering real tide occurrence has been proposed. A calculation method of expected overtopping probability of rubble mound breakwater was proposed by Kweon and Suh (2003). In their calculation, the fluctuation of tidal elevation was expressed by the sinusoidal change that yields the uniform distribution of occurrence frequency. However, the realistic distribution of tidal elevation should influence on the overtopping chance. In this study, the occurrence frequency of tidal elevation obtained from the real sea is included. The tidal elevation used in this study is collected from the east coastal part of Korean peninsular. Analyzing the annual data of the tidal fluctuation measured hourly during 355 days, the distribution of occurrence frequency is formulated utilizing by the normal distribution with one peak. Among the calculation procedures of annual maximum wave height, wave height-period joint distribution, wave run-up height and occurrence frequency of tide, only the annual maximum wave height is again chosen randomly from normal distribution to consider the uncertainty. The others are treated by utilizing the distribution function or relationship itself, It is found that the inclusion of the variability of tidal elevation has great influence on the computation of the expected overtopping probability of rubble mound breakwater. The bigger standard deviation of occurrence frequency is, the lower the overtopping probability of rubble mound breakwater is.

  • PDF

Reliability Analysis of the Expected Overtopping Probability of Rubble Mound Breakwater (마루높이 설정을 위한 월파확률의 신뢰성 해석)

  • Kweon, Hyuck-Min;Suh, Kyung-Doug;Lee, Young-Yeol
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 2003.08a
    • /
    • pp.376-381
    • /
    • 2003
  • The reliability analysis of overtopping probability is proposed. In order to estimate the expected overtopping probability of the rubble mound breakwater, the experimental results of individual wave runup height is applied for the analysis of irregular wave system. The joint distribution of wave heights and periods is used for the input data of runup calculation because the runup height depends on the wave height and period. The runup heights during the one event that the design wave attacks the rubble mound breakwater extend to the one life cycle of 60 years. Utilizing the Monte-Carlo method, the one life cycle is tried more about 60 times for obtaining the expected value of overtopping probability. It is found that the inclusion of the variability of wave tidal and wave steepness has great influence on the computation of the expected overtopping probability of rubble mound breakwater. The previous design disregarding the tidal fluctuation largely overestimates or underestimates the expected overtopping probability depending on tidal range and wave steepness.

  • PDF