• Title/Summary/Keyword: roof slope

Search Result 54, Processing Time 0.027 seconds

A Study on the Dwelling Sites of the Bronze Age - focused on the Relic of Seoktan-Ri - (청동기시대(靑銅器時代) 주거지(住居址)에 관한 연구(硏究) -석탄리유적(石灘里遺蹟)을 중심(中心)으로-)

  • Shin, Sang-Hyo;Cheon, Deuk-Youm
    • Journal of architectural history
    • /
    • v.4 no.1
    • /
    • pp.29-42
    • /
    • 1995
  • This study aims at examinating the change of architectural technique in the residential district of Seoktanri(石灘里), and then extracting the restorable types from it. The constructive technique was advanced in the composition of walls and the use of footing. The arrangement of columns was developed to standing them in a row and three rows in the center of interior space. In the light of excavated relics and the position of furnace, the interior space is seperated into cooking-heating, working and storing space. By the difference of height and the slope, the floor is divided into two parts which are low and high. According to the arrangement of column-holes, the types of roofs to be restored are as follows; the gable roof without column-hole, the hipped roof with center-column-holes(中央柱孔) in a row and the gable roof with center-column-holes in three rows.

  • PDF

A Study on the 'Perpendicular crossing Dori(Purlin)' Structure of the Ddeulzip(Courthouse) in Andong Cultural Area (안동문화권(安東文化圈) 뜰집의 '직교(直交)도리' 구조(構造)에 관한 연구(硏究))

  • Kim, Hwa-Bong
    • Journal of architectural history
    • /
    • v.9 no.2 s.23
    • /
    • pp.7-17
    • /
    • 2000
  • The purpose of this study is the analysis of 'perpendicular crossing Dori' with a structural character of Ddeulzip in Andong cultural area. There are many structural methods to solve the problems of Ddeuljip which is connected space in the rectangular type. There are 'Slope Base', 'Woosangak' roof, 'Seosangak' roof, and '4 beam roof framing' Moreover, they have been used 'perpendicular crossing Dori'. Its characters are as follows ; 1. The 'perpendicular crossing Dori' structure is occurred in different depth of width and length space of 'ㄱ' typed plan. At that time the beam of width is crossed in the middle of the beam of length without the order under them. 2. The 'perpendicular crossing Dori' structure is the method of free depth of width in regular distance of column which is different from general usage of balcony order. 3. The 'perpendicular crossing Dori' structure is founded north-western area of Andong Cultural Area(Bonghwa, Andong, Youngju, and Yeacheun). The best old sample was in Andong(16C) and the next is Yeacheun(17C) and the last is Bonghwa(18C). 4. The frequency in use of roof type of 'perpendicular crossing Dori' structure is 64% of 'Seosangak' and 36% of 'Woosangak'. The sample of 'Woosangak' house of 'perpendicular crossing Dori' structure is concentrated in Bonghwa. 5. The best merit of the 'perpendicular crossing Dori' structure is usage of double swing window in front of Anbang, It is the spacial success which overcomes the structural limits. And it is the structural rationality.

  • PDF

An Experimental Study on the Required Performances of Roof Concrete Placed in the In-ground LNG Storage Tank (지하식 LNG 저장탱크의 지붕 콘크리트의 요구성능에 관한 실험적 연구)

  • Kwon, Yeong-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.3
    • /
    • pp.339-345
    • /
    • 2013
  • This study is to derive from the required performances and the optimum mix proportion of the roof concrete placed in the in-ground LNG storage tank with a capacity of 200000 $m^3$, and propose the actual data for site concrete work. The concrete placing work without sliding and segregation in the fresh concrete condition is very important because the slope of domed roof is varied in the large range by its curvature. Also the control of hydration heat and the strength development at test ages are classified with massive section about 1.4 m thick and considered to the pre-stressing work and removal of air support after concrete placing work. Considering above condition, slump range is selected $100{\pm}25$ mm under the slope $20^{\circ}$ and $150{\pm}25$ mm over the slope $20^{\circ}$ s until 60 minutes of elapsed time. Also, the roof concrete is satisfied with compressive strength range including design strength at 91 days (30 MPa), pre-stressing work at 7 days (10 MPa), air support removal work at 21 days (14 MPa). Replacement ratio of limestone powder is determined by confined water ratio test and main design factors include water-cement ratio (W/C), sand-aggregate ratio and dosage of admixture. As test results, the optimum mix proportion of the roof concrete used low heat cement is as followings. 1) Replacement ratio of limestone powder 25% by confined water ratio test 2) Water-cement ratio 57.8% 3) Sand-aggregate ratio 42.0%. Also, test results for the adiabatic temperature rising test is satisfied with its criteria and shown the lower value compared to preceding storage tank (TK-13, 14). These required performances and the optimum mix proportion is to apply the actual construction work.

Planning Method of Roof Framing through Inner Building of Changgyeonggung in 19th Century (19세기 창경궁(昌慶宮) 내전(內殿) 전각(殿閣)의 지붕가구(架構) 계획기법(計劃技法)에 관한 연구(硏究))

  • Kim, Ki Deoka;Han, Wook;Kim, Derk Moon
    • Korean Journal of Heritage: History & Science
    • /
    • v.42 no.2
    • /
    • pp.134-153
    • /
    • 2009
  • This study is to examine closely the frame structure of buildings in the royal palace of Josen dynasty, focused on inner buildings of Changgyeonggung(昌慶宮) which is built in 19th century, through considering the member size of main structure and analyzing the slope of a rafter. The plans of a size on main member are as follows ; firstly, a length of the perimeter column was accorded with Gunggwolji(宮闕誌) and the planning size of interior column was shown to a Chon(a Korean inch, 寸) unit. The slope of long common rafter that is formed between the perimeter and interior columns was grasped with limits of a definite value. This is that the perimeter column is trimmed to a Chon unit, as Yeongchunheon(迎春軒), In the roof frame of Korean traditional timber architecture, the slope of rafter, first of all, is to decide the slope of long common rafter and then to decide a height of ridge piece settled whole height of a building. And it is regulated with position and height of a post so as to set up middle rafter. Especially, the slope of long common rafter, it is not to be decide through scale of a building but through a length of the perimeter column and composition of bracket structure. And in case middle rafter, the process of its slope is to devide the central bay on the side of a building into equality, and then to adjust position and length of a post.

A Numerical Study of the Turbulent Flow Characteristics in the Inlet Transition Square Duct Based on Roof Configuration (4각 안내덕트 루프형상에 의한 난류특성변화 수치해석)

  • Yoo, Geun-Jong;Choi, Hoon-Ki;Choi, Kee-Lim;Shin, Byeong-Ju
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.7
    • /
    • pp.541-551
    • /
    • 2009
  • Configuration of the inlet transition square duct (hereinafter referred to as "transition duct") for heat recovery steam generator (hereinafter referred to as "HRSG") in combined cycle power plant is limited by the construction type of HRSG and plant site condition. The main purpose of the present study is to analyze the effect of a variation in turbulent flow pattern by roof slop angle change of transition duct for horizontal HRSG, which is influencing heat flux in heat transfer structure to the finned tube bank. In this study, a computational fluid dynamics(CFD) is applied to predict turbulent flow pattern and comparisons are made to 1/12th scale cold model test data for verification. Re-normalization group theory (RNG) based k-$\epsilon$ turbulent model, which improves the accuracy for rapidly strained flow and swirling flow in comparison with standard k-$\epsilon$ model, is used for the results cited in this study. To reduce the amount of computer resources required for modeling the finned tube bank, a porous media model is used.

Structural Safety Analysis of Newly Developed Roof-Typed Falling Rock Protection System (루프형 낙석방지안전시설의 구조적 안전성 검토 연구)

  • Park, Cheol-U;Lee, Hak-Yong
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.50
    • /
    • pp.84-96
    • /
    • 2009
  • Road is typically constructed along ridge area of mountain because of topographical and economic reasons. Therefore, road may face lots of open cut slope which can easily cause rock falling. This study evaluates the structural safety of newly developed falling rock protection system which has a roof deck plate. The structural performance under self-weight, snow load and load from failing rock was investigated using a finite element numerical analysis method. From the analysis results, the H-beam space was limited not to exceed 2.2m. The deck plate was also safe under the examined loading condition. A hinge and connection in the system were investigated through detailed modelling and analysis. The results showed that the hinge was safe enough and that the connection should strengthened with appropriate stiffeners.

  • PDF

Structural Safety Analysis of Newly Developed Roof-Typed Falling Rock Protection System (루프형 낙성방지안전시설의 구조적 안전성 검토 연구)

  • Park, Cheol-Woo;Lee, Hak-Yoog
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.3
    • /
    • pp.47-53
    • /
    • 2009
  • Road is typically constructed along ridge area of mountain because of topographical and economic reasons. Therefore, road may face lots of open cut slope which can easily cause rock falling. This study evaluates the structural safety of newly developed falling rock protection system which has a roof deck plate. The structural performance under self-weight, snow load and load from falling rock was investigated using a finite element numerical analysis method. From the analysis results, the H-beam space was limited not to exceed 2.2m. The deck plate was also safe under the examined loading condition. A hinge and connection in the system were investigated through detailed numerical modelling and analysis. The results showed that the hinge was safe enough and that the connection should strengthened with appropriate stiffeners.

Finite Element Analysis of Gabled Hyperbolic Paraboloid Shells Subjected to Support Movements (지점변형을 하는 모임지붕형 쌍곡포물선쉘의 유한요소 해석)

  • Kim, Seung-Nam;Yu, Eun-Jong;Rha, Chang-Soon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.12 no.4
    • /
    • pp.57-69
    • /
    • 2012
  • This study investigated the behaviors of the gabled hyperbolic paraboloid shell structure subjected to differential settlement and the horizontal displacement due to the elongation of tie rod/beam on supports. Two types of shell structure with different roof slopes are used in study; conventional type which has perimeter beams around the shell panel, and simple type which removes the edge beams along the slab edge line. The effect of the removal of edge beam under vertical or horizontal displacement on supports, and the roof slope was compared using the finite element analysis.

A Study on the Type and Spread of Framed Structure of Gable Roof Meeting at Right Angle in the early Joseon Dynasty (조선전기 맞배직교형 건축의 유형과 전파)

  • Kim, Bue-Dyel;Lee, Jong-Seo
    • Journal of architectural history
    • /
    • v.27 no.2
    • /
    • pp.39-50
    • /
    • 2018
  • This study investigates the types and spread of framed structures of gable roofs meeting at right angle showed in old architecture and documentary paintings of houses, which were well liked in the early Joseon Dynasty. The conclusions of this study were as follows. First, the framed structure of gable roof meeting at right angle can be divided or recognized in 4 types according to their structure's size and purlin's position. Three of those types were noted to be in Seoul. Second, the framed structure of gable roofs meeting at right angle begun from the awareness of their independence from one another. Each space was divided based on their functions. Therefore, it could be extended in various forms, not only in the square plan physique but also in many different forms. And allowed free plan configuration regardless of column layouts or size of structure. Third, 5 purlins and 3 purlins crossing structure were preferred in Han-yang, the early Joseon Dynasty. It is related to the specific construction conditions of urban houses, such as the slope of land, limited land area, and economic power. Fourth, urban housing techniques were diffused throughout the country by officials who lived in Kae-gyeong and Han-yang at the end of Goryeo and early Joseon Dynasty. In other regions, framed structure of gable roof meeting at right angle households decreased, but in some regions of Gyeongsang-province, framed structure of gable roof meeting at right angle has maintained with Staggered purlin.

Effect of roof slope on the transmissivity of direct and diffuse solar radiation in multispan glasshouse by a computer simulation (컴퓨터 시뮬레이션에 의한 연동 유리온실내의 직달일사 및 산란일사 투과율에 미치는 지붕경사각의 영향)

  • 김용현;이석건
    • Proceedings of the Korean Society for Bio-Environment Control Conference
    • /
    • 1998.05a
    • /
    • pp.27-32
    • /
    • 1998
  • 국내에 보급되어 있는 유리온실은 네덜란드에서 수입된 벤로형(Venlo type or Dutchlite)과 벤로형에 비해서 동고가 높으며 온실 한 동의 폭이 상대적으로 큰 광폭형(widespan type)이 대부분을 차지하고 있다. 벤로형 은실의 측고는 3.5~4.0m로서 다소 차이가 있으나, 한 동의 폭과 지붕경사면의 길이가 일정하기 때문에 온실의 지붕경사각은 대부분 22$^{\circ}$를 나타낸다. (중략)

  • PDF