• Title/Summary/Keyword: rock tunnel

Search Result 2,166, Processing Time 0.027 seconds

Shear strength behaviors of grouts under the blasting induced vibrations

  • Sagong, Myung;Choi, Il Yoon;Lee, Jun S.;Cho, Chung-sik
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.207-213
    • /
    • 2020
  • Umbrella Arch Method (UAM) often employed in the tunnel construction under poor rock mass conditions in Korea. Insertion of steel pipes at the periphery of the tunnel and infiltration of grouts along the pipes into the rock masses increases tunnel stability. There are two major effects of grouts expected at the tunnel face: 1) increase of face stability by enhancing the frictional resistance of discontinuities and 2) decrease of permeability along the rock masses. Increase of resistance and decrease of permeability requires a certain curing time for the grout. In Korea, we require 24 hours for curing of grout, which means no progress of excavation for 24 hours after infiltration of grouts. This step delays the tunnel construction sequences. To eliminate such inefficiency, we propose MTG (Method for Tunnel construction using Grouting technology), which uses extended length of steel pipes (14 m) compared to conventional pipe roof method (12 m). The merit of MTG is the reduction of curing time. Because of the approximately 2 m extension of the length of steel pipe, blasting can be done after infiltration of grouting. For this paper, we conducted experiments on the shear strength behaviors of grout infilled rock joint with elapsing of curing time and blasting induced vibration. The results show that blasting induced vibration under MTG does not influence the mechanical features of grout material, which indicates no influence on the mechanical behaviors of grout, contributing to the stability of tunnels during excavation. This result indicates that MTG is a cost effective and fast construction method for tunneling in Korea.

Study on mechanism of macro failure and micro fracture of local nearly horizontal stratum in super-large section and deep buried tunnel

  • Li, Shu-cai;Wang, Jian-hua;Chen, Wei-zhong;Li, Li-ping;Zhang, Qian-qing;He, Peng
    • Geomechanics and Engineering
    • /
    • v.11 no.2
    • /
    • pp.253-267
    • /
    • 2016
  • The stability of surrounding rock will be poor when the tunnel is excavated through nearly horizontal stratum. In this paper, the instability mechanism of local nearly horizontal stratum in super-large section and deep buried tunnel is revealed by the analysis of the macro failure and micro fracture. A structural model is proposed to explain the mechanics of surrounding rock collapse under the action of stress redistribution and shed light on the macroscopic analytical approach of the stability of surrounding rock. Then, some highly effective formulas applied in the tunnel engineering are developed according to the theory of mixed-mode micro fracture. And well-documented field case is made to demonstrate the effectiveness and accuracy of the proposed analytical methods of mixed-mode fracture. Meanwhile, in order to make the more accurate judgment about yield failure of rock mass, a series of comprehensive failure criteria are formed. In addition, the relationship between the nonlinear failure criterion and $K_I$ and $K_{II}$ of micro fracture is established to make the surrounding rock failure criterion more comprehensive and accurate. Further, the influence of the parameters related to the tension-shear mixed-mode fracture and compression-shear mixed-mode fracture on the propagation of rock crack is analyzed. Results show that ${\sigma}_3$ changes linearly with the change of ${\sigma}_1$. And the change rate is related to ${\beta}$, angle between the cracks and ${\sigma}_1$. The proposed simple analytical approach is economical and efficient, and suitable for the analysis of local nearly horizontal stratum in super-large section and deep buried tunnel.

A Numerical Study on the Reinforcement Method of a Pillar Using Tension Bolts at the Connecting Part between 2-Arch Tunnels and Parallel Tunnels (2-Arch 터널과 병렬 터널 접속부에서의 텐션볼트를 사용한 필라 보강 방법에 대한 수치해석)

  • Park, Yeon-Jun;Choi, Jae-Jin
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.470-486
    • /
    • 2015
  • Two-arch tunnels require minimal spacing between the 2 tunnels and thus occupy small amount of land compared to parallel tunnels. But it is rather expensive. The parallel tunnel is not as expensive, but it requires more land than 2-arch tunnels. This may cause a problem when there is a land shortage. The new design is to connect these two types of tunnels by another pair of parallel tunnels where the separation distance is gradually increasing. The applicability of this new design to the cases where rock condition is not even fair has to be verified since the width of the pillar between the connecting tunnels can be quite narrow. Therefore both two and three dimensional numerical analyses were conducted and pillar stability was examined for rock classes IV and V in two different ways. Results showed that this new design is still effective for poor rock conditions if central pillar is properly reinforced by tension bolts as long as overburden is less than five times of the tunnel diameter.

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

A feasibility study on the estimation of a potential relaxed zone in the discontinuum coupled analysis of a subsea tunnel (해저터널의 불연속체 연계해석 시 잠재적 이완영역 평가 방법의 타당성 연구)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.141-150
    • /
    • 2009
  • When constructing a subsea tunnel in discontinuous rock mass, fluid flow in joints has a great influence on the behavior of the tunnel so that hydro-mechanical coupled analysis should be performed for the stability estimation. In practice, relaxed rock load is generally used for the design of tunnel concrete lining. In a continuum analysis, a method based on the distribution of local safety factor around a tunnel was proposed for the estimation of a potential relaxed zone. However, in the case of discontinuous rock mass in which joints are developed, the whole stability of tunnels depends on the behavior of the joints. In this study, therefore, a method is proposed for the estimation of a potential relaxed zone occurred by the excavation of a tunnel in discontinuous rock mass. The suggested method is validated by sensitivity analysis and the comparison with the results of continuum analysis.

Development of Countermeasure Expert System for Tunneling Failure (터널 붕락특성과 시공 중 보강공법 선정방법 개발)

  • 김창용;박치현;배규진;홍성완;오명렬
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2000.09a
    • /
    • pp.171-181
    • /
    • 2000
  • Many Studies of tunnel and tunnelling safety have been developed continuously based on the increasing social interests in underground space since 1990's in Korea. Because the growth of population in metropolitan has been accelerated at a faster pace than the development of the cities, underground facilities have been created as a great extent in view of less land space available. In this study, a lot of types of tunnel failure were surveyed and the detail causes were studied after many cases of tunnel failure were collected. There were suggested brief countermeasure of tunnel failure through case study. An expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river. This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

Numerical Modelling of Tunnel Blasting (터널발파의 수치해석적 모델링)

  • 이인모;최종원;김상균;김동현
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.133-140
    • /
    • 2000
  • Drilling and blasting method for excavating rock mass is generally used in underground construction; but this technique has some shortcomings. For instance, rock mass damage is inevitable during drilling and blasting, and blast-induced vibration frequently causes some problems. Until now, field measurement method is used to predict the overbreak and vibration; but it has many limitations. Therefore, numerical analysis method is needed to overcome such limitations, and to estimate and predict damage and vibration due to tunnel blasting in the design stage. In this study, damage zone of rock mass due to stoping and contour blasting is compared based on standard tunnel blasting pattern, and the propriety of the standard tunnel blasting pattern is estimated. Then, blasting pattern is optimized so that the damage zone due to sloping blasting with reduced charge is consistent with that due to contour blasting.

  • PDF

Theory and Analysis Method of Tunnel Convergence (터널 내공변위의 이론과 계측결과의 분석)

  • 김호영;박의섭
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.80-95
    • /
    • 1993
  • Convergence measurements play very important role in the assessment of stability of a tunnel and of the economics of rock reinforcements. The characteristics of convergences are both due to the face advance effect and the time-dependent behaviour of rocks. As the convergence law can be modeled as a specific function of two variables of distance and time, we can determine the type of function and the related parameters from the field measurements. By using the regression method based on the Levengberg-Marquardt algorithm, an analysis of convergence of two different tunnels and one numerical example is described. It is shown that the convergence can be modeled as following function, C(x)=a{1-exp(-bx)} or C(t)=a{1-exp(-bt)} in case of a tunnel excavated in elastic rocks, in case of elasto-plastic or over stressed rocks.

  • PDF

Development of a Back Analysis Program for Rock Tunnel using FLAC (FLAC을 이용한 터널 역해석 프로그램의 개발)

  • 양형식;전양수
    • Tunnel and Underground Space
    • /
    • v.12 no.1
    • /
    • pp.37-42
    • /
    • 2002
  • A back analysis algorithm was developed to determine the major parameters for tunnel design; the elastic modulus(E) and the ratio of horizontal to vertical stress(K). The algorithm is based on direct search method and was coded by FISH language of FLAC, a commercial finite difference program. Developed code was applied on some models to verify the validity and estimate the efficiency of the algorithm. Verification by theoretical solutions and published results of Gens' research, was successful.