• Title/Summary/Keyword: road operation

Search Result 674, Processing Time 0.022 seconds

Optimization of Earthwork Operation for Energy-saving using Discrete Event Simulation

  • Yi, Chang-Yong;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.537-539
    • /
    • 2015
  • considerate operation is a major issue in the equipment-intensive operation. Identifying an optimal equipment combination is important to achieve low-energy operations. An Earthwork operation planning system, which measures the energy consumption of construction operations by taking into account construction equipments' engineering attributes (e.g., weight, capacity, energy consumption rate, etc.) and operation conditions (e.g., road condition, attributes of materials to be moved, geometric information, etc.), is essential to achieve the low-energy consumption. This study develops an automated computerized system which identifies an optimal earthmoving equipment fleet minimizing the energy consumption. The system imports a standard template of earthmoving operation model and compares numerous scenarios using alternative equipment allocation plans. It finds the fleet that minimizes the energy consumption by enumerating all cases using sensitivity analysis. A case study is presented to verify the validity of the system.

  • PDF

On the Supplementary Study on DSM-Based Interface Requirements through Analysis of the Operation Scenario of the Urban Subway Logistics System

  • Hwang, Sunwoo;Kim, Joouk;Park, Jaemin;Lee, Sangmin;Kim, Youngmin
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.14 no.1
    • /
    • pp.152-161
    • /
    • 2022
  • Recently, it is recognized as a high-cost and inefficient logistics system that increases traffic congestion and environmental problems due to an increase in traffic volume due to the activation of the online market. In order to solve inefficient problems such as unavoidable traffic congestion and environmental problems caused by the increase in traffic volume, it is necessary to develop a freight transport system technology using the existing urban railway infrastructure and freight-only urban railway. The urban subway logistics system is a logistics system that requires a combination of various technologies to solve the nationwide demand for urban logistics and road traffic problems. This paper recognized the existing traffic congestion and environmental pollution of road traffic as problems, and supplemented the contact point requirements presented above by identifying the sub-systems constituting the target system and supplementary points for each part-level contact point. In this study, as a complex system operated for one purpose by grafting various technologies, a plan is required to secure the reliability and safety of operation from various viewpoints. The results of this study can contribute to the initial configuration and basic data to solve the interface bottleneck of the urban subway logistics system to be promoted in the future.

Prioritization of Potential Technology for Establishing a Safe Work Zone Environment (안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정)

  • Kim, Jin Guk;Yang, Choong Heon;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

An Application of Simulation Method to Planning of Road Pavement Operation (시뮬레이션을 이용한 도로포장 공정계획의 수립방안)

  • Ohn, Seong-Won;Kim, Ok-Ki;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.124-131
    • /
    • 2007
  • Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.

Optimize TOD Time-Division with Dynamic Time Warping Distance-based Non-Hierarchical Cluster Analysis (동적 타임 워핑 거리 기반 비 계층적 군집분석을 활용한 TOD 시간분할 최적화)

  • Hwang, Jae-Yeon;Park, Minju;Kim, Yongho;Kang, Woojin
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.5
    • /
    • pp.113-129
    • /
    • 2021
  • Recently, traffic congestion in the city is continuously increasing due to the expansion of the living area centered in the metropolitan area and the concentration of population in large cities. New road construction has become impossible due to the increase in land prices in downtown areas and limited sites, and the importance of efficient data-based road operation is increasingly emerging. For efficient road operation, it is essential to classify appropriate scenarios according to changes in traffic conditions and to operate optimal signals for each scenario. In this study, the Dynamic Time Warping model for cluster analysis of time series data was applied to traffic volume and speed data collected at continuous intersections for optimal scenario classification. We propose a methodology for composing an optimal signal operation scenario by analyzing the characteristics of the scenarios for each data used for classification.

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

An Evaluation and Prediction of Performance of Road Snow-melting System Utilized by Ground Source Heat Pump (지열원히트펌프를 활용한 도로융설시스템의 성능 평가 및 예측)

  • Choi, Deok-In;Hwang, Kwang-Il
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.138-145
    • /
    • 2012
  • Because of the climate changes and the development of building technologies, the cooling loads have been increased. Among the various renewable energies, geothermal energy is known as very useful and stable energy for heating and cooling of building. This study proposes a road snow-melting system of which heat is supplied from GSHP(Ground source heat pump) in viewpoint of the initial investment and annual running performance, which is also operating as a main facility of heating and cooling for common spaces. The results of this study is as followings. From the site measurement, it is found out that the road surface temperature above the geothermal heating pipe rose up to $5^{\circ}C$, which is the design temperature of road snow-melting, after 2 hours' operation and average COP(Coefficient of performance) was estimated as 3.5. The reliability of CFD has confirmed, because the temperature difference between results of CFD analysis and site measurement is only ${\pm}0.4^{\circ}C$ and the trend of temperature variation is quite similar. CFD analysis on the effect of pavement materials clearly show that more than 2 hours is needed for snow-melting, if the road is paved by ascon or concrete. But the road paved by brick is not reached to $5^{\circ}C$ at all. To evaluate the feasibility of snow-melting system operated by a geothermal circulation which has not GSHP, the surface temperature of concrete-paved road rise up to $0^{\circ}C$ after 2 hour and 40 minutes, and it does never increase to $5^{\circ}C$. And the roads paved by ascon and brick is maintained as below $0^{\circ}C$ after 12 hours geothermal circulation.

Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road - (벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 -)

  • Woo, Bo-Myeong;Kim, Kyung-Hoon;Park, Jae-Hyeon;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF

Operation Analysis of Downstream Intersections at Urban Freeway Off-ramps (도시고속도로 진출램프 하류부교차로 운영 분석 (중동 IC 사례 분석을 중심으로))

  • Jeon, Jae-Hyeon;Kim, Young-Chan;Jeoung, Young-Je
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.7-16
    • /
    • 2008
  • Severe congestion is happening at urban freeway off-ramps in Seoul. Major causes of congestion at off-ramps are a shortage of capacity and inefficient signal operations at the downstream intersection at off-ramps. It is necessary to control congestion by improving design or operations in the downstream intersection. In this study, the authors analyzed the case of the Jungdong interchange that was improved for design in the downstream intersection. When a freeway and an arterial road cross, diamond interchanges are usually selected with a single-point urban interchange (SPUI) as an alternative. To compare the effectiveness of a diamond interchange with a SPUI, the authors applied these two configurations to the Jungdong interchange using a simulation. The result of the analysis shows that congestion at off-ramps in diamond interchanges can be reduced by improving signal operations such as the application of "4 phase with overlaps" and that diamond interchanges are more efficient than a SPUI with a frontage road. Efficient operation of the downstream intersection by these findings can minimize congestion of not only the downstream intersection but also the freeway mainline.

Development of Predicting Models of the Operating Speed Considering on Traffic Operation Characteristics and Road Alignment Factors In Express Highways (고속도로 교통운영 특성 및 도로선형요소를 반영한 주행속도 예측모형 개발)

  • Lee, Jeom-Ho;Hong, Da-Hui;Lee, Su-Beom
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.109-121
    • /
    • 2006
  • The road should be designed in the consistent alignment which the driver can drive safely. Also, proper highway environments in order to maintain optimal operational speeds on highway sections should be provided In design stage, for highway environments, it is essential for an operational speed estimation model to different highway environments. If a method which could evaluate the status of the road safety is developed through this operational speed estimation model, it is possible to provide safe and more comfortable highways to road users. In the study factors to effect on operational speeds are classified into three groups horizontal & vertical alignments and traffic operation characteristic factors. Factors are chosen to effect on operational speeds by using collation analysis as classifications of tangent sections, horizontal curve sections and vertical curve sections. In order to develop operational speed estimation models in express highways, multi-regression analysis has been used in this study using the selected factors. This study has meaning that the developed estimation models for operational speeds and evaluation of degree of safety to horizontal and vortical alignments simultaneous. In order to represent whole area of the country with the developed models, the models should be re-analyzed with vast data related with road alignment factors in the near future.