• Title/Summary/Keyword: road budget

Search Result 134, Processing Time 0.022 seconds

Study on Improvement Method and Performance Analysis About Occupied Existing Roadside Barriers in Expressway (고속도로에서 공용중인 노측용 차량방호울타리의 성능분석 및 개선방안에 관한 연구)

  • Joo, Jae-Woong;Jang, Dae-Young;Ha, Jong-Moon;Park, Je-Jin
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.9-17
    • /
    • 2011
  • It is possible to set up the Roadside Barrier which is suitable for Performance Evaluation Criteria by domestic standard. But a number of section of expressway roadside have old guardrail that was installed before reform the guideline. These poor performance guardrails threaten driver's life. There is lots of difficult problem to change old guardrails that are installed 2,777km in expressway of whole road side at the same time. Especially budget problem. The purpose of study is to develop performance improvement guardrails by the minimum reinforcement. In this study, guardrail improvement method(SB1, 3, 5 grade) is developed through crash simulation using LS-DYNA 3D and vehicle crash test. And it's expected not only to decrease of collision accident but to increase safe level. Of course one thing that can't be missing is to reduce a lot of budget of guardrail change.

A Study of Information Strategy Plan for Korea Institute of Oriental Medicine(KIOM) (한국한의학연구원 정보화전략계획 연구)

  • Kim, Chul;Yea, Sang-Jun;Kim, Sang-Hyun;Jang, Hyun-Chul;Song, Mi-Young
    • Korean Journal of Oriental Medicine
    • /
    • v.14 no.3
    • /
    • pp.137-148
    • /
    • 2008
  • Computerization is recognized as simple supporting tools up to recently but Information is made for the improvement of company's outcome beyond the assistant tools and is emerged as core tools of creating new opportunities for company in point of management strategy. But Information plays minor role in Korean Institute of Oriental Medicine(KIOM) yet. Information has not processed systematically because of lack of understanding and budget in KIOM. The purpose of this research is to make plan for knowledge information which is aimed to make effective supporting and strengthening the ability of KIOM's research, until 2013. Also we tried to find new project s for information and to apply the result to planned information projects. The final goal of this study is to make mid/long-term information plan of KIOM. We applied the general information strategy planning(ISP) method which is progressed as analysis of information technology, analysis of information status, design of future model and extraction of action plan order. First, we examined the information elements for the advanced management from analysis of management environment and analyzed information technology trends. Second, we list up the gaps and problems of KIOM's information status and define the future model to solve this problems. It is showed the road map of time and budget for future model to progress systematically inner-information of purpose. We hope that information of KIOM will be conducted successfully.

  • PDF

Development of Korean Life Cycle Cost Analysis Model for Road Pavement Asset Management (도로포장자산관리를 위한 한국형 생애주기비용 모형 개발)

  • Han, Daeseok;Do, Myungsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1639-1650
    • /
    • 2013
  • Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.

Legal and Institutional Framework and Feasibility Analysis for the Application of PPP in Forest Road Construction (임도 개설에서의 민간투자사업 적용을 위한 법제도 및 타당성 검토)

  • Seunghyun Song;Ho-Sang Lee;Eui-Gyeng Kim;Soo-Im Choi;Dong-Hyun Kim
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.6_3
    • /
    • pp.1859-1869
    • /
    • 2024
  • This paper proposes institutional improvements to enhance public-private partnerships (PPP) in the construction of forest roads. It revisits the historical 'Deferred Sale System', which allowed timber buyers to construct forest roads, deduct the cost from timber payments, and pay the remaining balance later. However, this system was discontinued due to outdated technology and equipment, and it currently lacks a robust legal framework for implementation. The study also examines the unique characteristics of forest roads compared to the road sector. Unlike roads, revenue from forest roads is generated by forestry operators, not end-users, requiring long-term investment strategies. The BTL (Build-Transfer-Lease) model is identified as useful for urgent projects due to its ability to ensure timely completion. However, without continuous budget increases, its long-term viability may be compromised by the financial burden on the government. In contrast, the BTO (Build-Transfer-Operate) model is more viable in areas where private investors can recover costs through thinning profits. Accurate assessments of timber value and harvesting areas are critical for its success. In conclusion, regulatory consistency and resource mobilization from stakeholders, including forest owners and private enterprises, are essential for sustainable forest road development. This study highlights the need for further discussions on effective implementation and long-term investment strategies to enhance the applicability of PPP models to the unique context of forest road construction.

A Study on Automatic Threshold Selection in Line Simplification for Pedestrian Road Network Using Road Attribute Data (보행자용 도로망 선형단순화를 위한 도로속성정보 기반 임계값 자동 선정 연구)

  • Park, Bumsub;Yang, Sungchul;Yu, Kiyun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.4
    • /
    • pp.269-275
    • /
    • 2013
  • Recently, importance of pedestrian road network is getting emphasized as it is possible to provide mobile device users with both route guidance services and surrounding spatial information. However, it costs a tremendous amount of budget for generating and renovating pedestrian road network nationally, which hinder further advances of these services. Hence, algorithms extracting pedestrian road network automatically based on raster data are needed. On the other hand, road dataset generated from raster data usually has unnecessary vertices which lead to maintenance disutility such as excessive turns and increase in data memory. Therefore, this study proposed a method of selecting a proper threshold automatically for separate road entity using not only Douglas-Peucker algorithm but also road attribute data of digital map in order to remove redundant vertices, which maximizes line simplification efficiency and minimizes distortion of shape of roads simultaneously. As a result of the test, proposed method was suitable for automatic line simplification in terms of reduction ratio of vertices and accuracy of position.

Building up User-Oriented Road Planning and Design Schemes (국민참여형 도로계획의 수립방향)

  • Kim, Eung-Cheol;Kwon, Young-In;Yun, Seong-Soon;Kang, Jin-Goo
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.47-55
    • /
    • 2005
  • Roads deeply affect the life of people and keep doing an important role to support economic growth of a country. According to the budget plan of the ministry of construction and transportation of Korea, 8.1 trillion won have been allotted for road investment in the year of 2002 which occupy 61% of the transportation infrastructure special account (13.3 trillion won) and 4.7% of the total national budget (1,740 trillion won). It is true that services generated from road investment such as mobility enhancement and increased accessibility have shown positive effects through shortened travel time and decreased vehicle operating cost. However, it is also notable that many negative effects are gradually being discussed and those are nowadays getting severer due to enhanced people interests about road construction, increased concerns on environment and active public involvement that were evoked by traffic accidents, air pollution & noise and destruction of environment. Road construction processes in Korea are normally governed by administrative sectors (suppliers) not by users. These processes ate very weak to accomodate user s needs and community concerns thus easy to fail finalizing a road project without hassles. A public hearing process is supposed to be held in the processes of detailed design step and the environmental impact analysis. However, it is not enough to grab user's needs and community concerns. Increased public involvement frequencies, optimized public involvement timing and enhanced depth of public involvement magnitude are suggested to improve the current poor public involvement schemes in road planning and design processes. The application of these recommended methods to the road planning and design processes may guarantee the change from the current supplier-oriented schemes to the new user-oriented one. Also, this study suggests to reset objectivity and clarity of road construction process, to make conciliation guidelines based on many practical cases that produced good results, to introduce public involvement techniques in a stepwise basis, and to foster the professionals via education and training programs.

The Prediction of Remaining Life of Concrete Bridge Decks Using The Reliability Analysis (신뢰도 분석을 통한 고속도로 교량의 바닥판 잔존 수명 예측)

  • Park, Jung-Hee;Lee, Sang-Soon;Kim, Ji-Won;Park, Cheol-Woo;Lee, Dong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.71-79
    • /
    • 2011
  • Korean national highway has been increased 2 times more for the past ten years because of many highway geometric improvements and new routes since 2000. According to the reasons, maintenance cost has been increased continuously. Deterioration of concrete bridge decks caused by asphalt pavement deformation occupies a high proportion of overall bridge management budget. The number of current highway bridges has reached over 7,800 in 2011, and It is difficult to determine to some future budget. This study predicted the remaining life of concrete bridge decks using the reliability analysis based on Weibull distribution. and The expected future maintenance cost was estimated.

Analysis of the Effect of Traffic Safety Investment on Traffic Accident Reduction Using Panel Data (패널자료를 이용한 교통안전투자 종류별 사고감소 효과)

  • Gang, Su-Cheol;Bae, Hyeong
    • Journal of Korean Society of Transportation
    • /
    • v.29 no.5
    • /
    • pp.19-32
    • /
    • 2011
  • There are many investment budget drafts in the filed of a road traffic safety. The traffic safety budget is spitted into following three major areas: 1) traffic safety facility (Engineering), 2) traffic enforcement (Enforcement), and 3) traffic safety education & public relation (Education). The three area are known as so-called 3E policy. This study investigates the effect of the investment in the 3E policy on the reduction of traffic accidents analyzing the data annually collected from the 15 local governments during 1992 to 2007. The analysis employing the traffic accidents as the dependent variable reveals that the effect of the investment is higher if same amount of investment is made on areas of the traffic safety education and public relation than the area of facility improvement. The similar conclusions are resulted from the separate investigation of traffic accidents data by 6 different types. All the results consistently indicate that the current traffic safety investment being primarily made on traffic safety facility needs to shift to the areas of traffic safety education and public relation budget.

A Study on Thermal Satisfaction of Domestic Heat Wave Reduction Facilities (국내 폭염 저감 시설의 온열 만족도에 대한 연구)

  • Jun, Yong-Joon;Park, Lyool;Park, Kyung-Soon
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.18 no.1
    • /
    • pp.1-11
    • /
    • 2022
  • As abnormal climates occur due to the increase in greenhouse gases at home and abroad, various problems such as human casualties, crop damage, energy depletion, and economic loss due to heat diseases, which are one of the extreme climate phenomena, are following one after another. In response, the government has established the 'Climate Crisis Response Special Committee' since 2018, when it recorded the greatest damage in history due to heat waves, and has been carrying out budget formation and reform of laws and systems every year to respond to heat waves. However, in relation to the heat wave damage reduction facility that is being expanded with a large budget, there is no prior research related to the degree of heat loss due to the use of the facility, the difference in effects between specific groups, and the economic effect that comes back compared to the invested budget. Therefore, from a midto long-term perspective, it is expected that it will be difficult to establish a clear direction for policy making. Therefore, in this study, representative facilities were selected according to the principle of heat reduction among the currently expanded heat damage reduction facilities, and a questionnaire survey was conducted for users of each reduction facility (waterfall, awning, pond, and elastic pavement). Accordingly, the change in the sense of heat according to the use of the heat damage reduction facility was checked, and the change in the sense of heat according to the group characteristics (gender, age, metabolic rate) was analyzed to examine the characteristics of the relationship between the facility and the users.

Process and Results of Seoul Metropolitan Government's Environmental Health Policy Road Map (서울시 환경보건정책 로드맵 수립)

  • Lim, Ji-Ae;Kwon, Ho-Jang;Kim, Shinbum;Chou, Youngeun;Gu, Seulgi;Jeong, Hoi-Seong;Kim, Myung Han;Choi, Kyungho
    • Journal of Environmental Health Sciences
    • /
    • v.40 no.5
    • /
    • pp.425-434
    • /
    • 2014
  • Objectives: The purpose of this study is to introduce the establishment process and results of the Seoul Metropolitan Government's road map on environmental health policy. Methods: The process consisted of expert group meetings, civic participation, research, and questionnaire survey for priority environmental health policy agenda items in Seoul. Results: The announced vision for the environmental health policy was "a healthy environment, safety in Seoul". This policy was established in order to define environment health policy initiatives for a period of five years with an aim to protect Seoul citizens' health from hazardous environmental factors. The resulting Seoul environmental health policy consisted of four areas and 16 key agenda items. The four areas were "Protection for children against hazardous materials", "Enhancement of health and safety of all", "Carcinogen-free and endocrine-disrupting chemical-free Seoul (reducing environmental exposure to hazardous materials), and "Establish the foundation of environmental health policy". Sixteen key agenda items include the enhancement of management of spaces for children, certification of environmental health status at schools, establishment of a unit responsible for the environmental health of children, strengthening environmental health management for susceptible populations (children, the aged, and the socioeconomically vulnerable), management of hazardous materials, physical hazardous factors (noise, radiation, etc.), indoor air quality, and the enhancement of monitoring, research, and regulation of environment health. Conclusion: The Seoul Metropolitan Government established an environmental health policy road map for a five-year period (2013-2017). To implement this environmental health policy, budget allocation, and detailed execution plans are required.