• Title/Summary/Keyword: river facility

Search Result 188, Processing Time 0.02 seconds

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

Analysis of the Phosphorus Contribution Rate by the Environment Fundamental Facilities Located in Upstream Basin of Paldang Lake (팔당호 상류수계에 위치한 환경기초시설의 인 기여도 분석)

  • Woo, Younggug;Park, Eunyoung;Jeon, Yangkun;Yang, Heejeong;Rim, Jaymyung
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.1016-1027
    • /
    • 2010
  • The phosphorus contribution rate on water quality of North and South-Han River, and Gyungan-cheon by effluents from environmental fundamental facilities located in upstream basin of Paldang Lake were analyzed. QUALKO2 model was selected for the analysis of contrubution rate, and was constructed considering the location of the main point sources and all facilities in study area. The pollutant loading rates and arrival rates for each unit-watershed in study area were calculated for model operation. For the calibration and verification of model, 2006 water quality dataset from Ministry of Environment and the effluent loadings of the environmental fundamental facilities were used. Reliability Index (RI) method was used to estimate the validity of the results of calibration and verification. The phosphorous contribution rate(%) for each environmental fundamental facility were analyzed by excepting the effluent loading of the facility. The contribution rate was analyzed for each facility, facility groups separated by each main river and each unit-watershed. The main results of analysis for each facility are as follows; (i) the phosphorous contribution of B1 facility is 50%, which is the highest phosphorous contribution rate among those of nine facilities in the North-Han River Basin; (ii) the highest phosphorous contribution is 55.6% from J facility among eight facilities in the Gyungan Stream Basin; (iii) 40% from E treatment facility is the highest among those of twenty eight facilities in the South-Han River Basin.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

A Method to Apply the BIM Standard Classification System in the River Field for BIM-based River Maintenance (BIM 기반의 하천 유지관리를 위한 하천분야 BIM 표준분류체계 적용방안)

  • Jeongyong Nam;Jaeha Joo;Jeongil Hong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.3
    • /
    • pp.147-154
    • /
    • 2023
  • In the case of river facilities, the management of this information differs depending on national and regional rivers, therefore, there is no integrated management in place. There is concern about the loss of facility information owing to the insufficient accumulation of information during their design and construction stages. Additionally, as a result, the utilization level of facility information during the maintenance and operation stages is insufficient. To ensure effective maintenance and operation of river facilities, it is necessary to secure data consistency and increase efficiency by organizing facility information according to a standardized classification system. This study proposes a strategy for implementing the BIM standard classification system in the river sector, considering facility characteristics. The goal is to introduce a BIM information model for 3D-based river facilities, and enable efficient maintenance and operation conversion.

The Effect of Branches on Kumho River's Water Quality (지류의 수질이 금호강 본류의 수질에 미치는 영향에 관한 연구)

  • Yang, Duk Seok;Bae, Hun-Kyun
    • Journal of Environmental Science International
    • /
    • v.21 no.10
    • /
    • pp.1245-1253
    • /
    • 2012
  • In this study, how branches of Kumho River affect to the water quality on Kumho River was investigated. Water samples from six sampling points at Kumho River and three at each branch were taken from Dec. 2009 to Dec. 2011. As results, Namcheon affected BOD and T-P concentrations on Kumho River while Sincheon did only T-P concentrations. However, the water quality of Kumho River was improved because of Sincheon in terms of BOD and COD concentrations. This was the results from management of Sincheon wastewater treatment facility and Jisan wastewater treatment facility which might be the best example for managing wastewater treatment facilities. Dalsecheon would not affect the water quality of Kumho River although it had bad conditions of water quality because of lack of its water quantity comparing to Kumho River's.

Study on the Environmental Quality Assessment of River Revetment Technique by Life-Cycle-Assessment (전과정 평가에 의한 하천 호안 공법의 환경성 평가에 관한 연구)

  • Kim, Kook-Il;Ahn, Won-Sik
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.6 s.179
    • /
    • pp.485-494
    • /
    • 2007
  • This study was performed to evaluate the environmental qualities of the revetment construction methods and the river-facility materials using Life-Cycle-Assessment(LCA) for the nature-friendly design of close-to-nature river, The investigation results on the environmental qualities of energy and materials used to the close-to-nature river plan showed that the environmental impacts per unit weight increased in the order of gasoline > diesel > cement > wood. The environmental impacts per unit area of revetment construction method exhibited that the environmental loadings increased in the order of gabion > revetment > cribwork. In addition, it was observed that the environmental impact was reduced by improving the materials of zinc-galvanized wire. The model basin investigated in this study was the $0.3km^2$ area of river improvement works in Kyung stream, which is a tributary to the Seomjin river and the second regional stream. The research was conducted based on the 30years by life expectancy of artificial facilities. For the comparisons of revetment techniques with respect to the environmental qualities, the method resulted in the highest environmental loadings. The method using ready-mixed concrete ranked second in the environmental loadings of revetment techniques. The present results of this study are expected to play a beneficial role in the nature-friendly design of close-to-nature river by quantitatively identifying the environmental quality of total procedures (i.e., combination of techniques, selection of river-facility materials, maintenance of river-facility) applied to close-to-nature river plan.

A Study on the Park Using Pattern Focusing on user Behavior in River-eco-park (하천생태공원 이용자의 이용행태에 따른 시설이용패턴에 관한 연구)

  • Back, Jun Wook;Park, Jong Min;Kim, Jong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2157-2168
    • /
    • 2013
  • This study is about facilities using pattern for 'River-eco-park' that is Hwa-myeong Eco-park, Sam-rak Eco-park, Maek-do Eco-park. Through doing surveys, most patterns could be divided 5 patterns; 'Eco observation facility pattern', 'Promenade pattern', 'Bike path pattern', 'Sports facility pattern', 'Fitness center pattern'. Then we find channel of movement of user patterns by follow-up surveys. On the basis of this surveys, we are going to suggest some directions for River-eco-park design.

A Study on Hydraulic Stable Analysis of The Natural Small River (친환경 소하천의 수리적 안정성 분석에 관한 연구)

  • Kim, Tae-Kyoung;Rhee, Kyoung-Hoon;Sun, Byoung-Jin;Choi, Cheong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.3
    • /
    • pp.187-194
    • /
    • 2007
  • It started road constructions around river in 1990s. These maintenances concentrate on city river. Because river lives no living things and men don't come near there. But in spite of these river environment go to rack, river maintenances still keep on using preexistence method since 1990s. Only a part of city river environment maintenances consider environmental ability of passive river, river maintenance of a purpose of flood control still don't consider in the concrete. Because propulsion device that consider environment ability of passive river and possible application techniques don't complete. In accordance, A natural river maintenance needs absolutly a series of river projects. Because a natural river maintenance prevents a damage of environment ability. This study is to assume the flood really happened and to carry out the flood damage simulation needed in overflow simulation about the inundated zone. Also, This study examine unstable part about the hydraulic characteristic as velocities, stream power, shear, hydraulic depth, flow area in basin. And this study applied the HEC-RAS(river analysis system) model to predict flood overflow in youngsan river basin. Project flood is used the return period 100 year and inputed data that was calculated in intensity figures of illumination.

A study on pollutants removal characteristics of domestic riverbed filtration and riverbank filtration intake facilities (국내 복류수 및 강변여과수 취수시설의 오염물질 제거특성에 관한 연구)

  • Chan-woo Jeong;Sun-ick Lee;Sung-woo Shin;Chang-hyun Song;Bu-geun Jo;Jae-won Choi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.5
    • /
    • pp.281-288
    • /
    • 2023
  • This study was performed to evaluate the pollutants removal characteristics of two types of RBFs(Riverbank filtration, Riverbed filtration) intake facilities installed in Nakdong River and in Hwang River respectively. The capacity of each RBF is 45,000 m3/d for riverbank filtration intake facility and 3,500 m3/d for riverbed filtration intake facility. According to data collected in the riverbank filtration site, removal rate of each pollutant was about BOD(Biochemical Oxygen Demand) 52%, TOC(Total Organic Carbon) 57%, SS(Suspended Solids) 44%, Total coliforms 99% correspondingly. Furthermore, Microcystins(-LR,-YR,-RR) were not found in riverbank filtered water compared to surface water in Nakdong River. DOC(Dissolved Organic Carbon) and Humics which are precursors of disinfection byproduct were also reported to be removed about 59% for DOC, 65% for Humics. Based on data analysis in riverbed filtration site in Hwang River, removal rate of each contaminant reaches to BOD 33.3%, TOC 38.5%, SS 38.9%, DOC 22.2%, UV254 21.2%, Total coliforms 73.8% respectively. Additionally, microplastics were also inspected that there was no obvious removal rate in riverbed filtered water compared to surface water in Hwang River.