• Title/Summary/Keyword: risk-assessment

Search Result 5,592, Processing Time 0.034 seconds

The Impact of BCMS Risk Assessment on Business Performance (BCMS의 위험평가가 경영성과에 미치는 영향)

  • Jang, Geun-Young;Kim, Deok-ho;Cheung, Chong-Soo
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.81-96
    • /
    • 2021
  • Purpose: Based on the preceding studies in supply chain management, factors were analyzed to verify the effect of risk assessment and risk management factors of the business continuity management system (BCMS) on management performance. The purpose of this study is to establish a systematic risk management plan by deriving the risk factors of BCMS and evaluating unpredictable risks, and at the same time, contributing to a company's competitive advantage without interruption of work. Method: The structural relationship between risk assessment, risk management and management performance of BCMS was derived. To this end, a questionnaire survey was conducted of 124 managers and managers in Korean companies. Frequency analysis, validity analysis, reliability analysis, correlation analysis, and simple regression analysis were performed. Result: First, risk assessment had a positive (+) effect on risk management. Second, risk management had a positive (+) effect on management performance. Finally, risk assessment had a positive (+) effect on management performance. Conclusion: BCMS's risk assessment and risk management capabilities should be managed through financial performance, and risk management activities should be managed through non-financial performance.

Application of Indoor Air Modelling for Using Health Risk Assessment in Environmental Impact Assessment (환경영향평가에서 건강위해성평가 기법을 이용하기 위한 실내공기 모델링 적용)

  • Yang, Won-Ho;Son, Bu-Soon;Park, Jong-An;Kim, Im-Soon;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.10 no.3
    • /
    • pp.211-221
    • /
    • 2001
  • Recognizing interaction between the environment and humans, the EIA(environmental impact assessment) movement has sought to promote more environmentally sound and informed decisions for the sake of human welfare. Therefore, most EIA programs require the consideration of human health impacts. Yet relatively few EIA documents adequately address those impacts. This study was carried out to investigate the role of EIA for reuniting the environment and human health, for preventing and reducing significant health risks, and for improving human health impact assessment by means of risk assessment. Risk assessment consists of 4 components; hazard identification, dose-response assessment, exposure assessment and risk characterization. Since most people spent their times in indoor, indoor air quality modelling can be used in exposure assessment and risk assessment. In this study, indoor $NO_2$ concentration and personal $NO_2$ exposure were estimated by Box Model using mass balance equation and time weighted average, respectively. The estimated indoor $NO_2$ concentration and the personal $NO_2$ exposure were compared by those measured, respectively. Subsequntly, health effect was assessed with these results. Consequently, exposure assessment and risk assessment using indoor air quality model may be considered to be applicable to EIA.

  • PDF

Analysis on the Risk-Based Screening Levels Determined by Various Risk Assessment Tools (III): Proposed Methodology for Lead Risk Assessment in Korea (다양한 위해성평가 방법에 따라 도출한 토양오염 판정기준의 차이에 관한 연구(III): 우리나라 납 오염 위해성평가 방법 제안)

  • Jung, Jae-Woong;Nam, Kyoungphile
    • Journal of Soil and Groundwater Environment
    • /
    • v.20 no.6
    • /
    • pp.1-7
    • /
    • 2015
  • The most critical health effect of lead exposure is the neurodevelopmental effect to children caused by the increased blood lead level. Therefore, the endpoint of the risk assessment for lead-contaminated sites should be set at the blood lead level of children. In foreign countries, the risk assessment for lead-contaminated sites is conducted by estimating the increased blood lead level of children via oral intake and/or inhalation (United States Environmental Protection Agency, USEPA), or by comparing the estimated oral dose to the threshold oral dose of lead, which is derived from the permissible blood lead level of children (Dutch National Institute for Public Health and the Environment, RIVM). For the risk assessment, USEPA employs Integrated-Exposure-Uptake-Biokinetic (IEUBK) Model to check whether the estimated portion of children whose blood lead level exceeds 10 µg/dL, threshold blood lead level determined by USEPA, is higher than 5%, while Dutch RIVM compares the estimated oral dose of lead to the threshold oral dose (2.8 µg/kg-day), which is derived from the permissible blood lead level of children. In Korea, like The Netherlands, risk assessment for lead-contaminated sites is conducted by comparing the estimated oral dose to the threshold oral dose; however, because the threshold oral dose listed in Korean risk assessment guidance is an unidentified value, it is recommended to revise the existing threshold oral dose described in Korean risk assessment guidance. And, if significant lead exposure via inhalation is suspected, it is useful to employ IEUBK Model to derive the risk posed via multimedia exposure (i.e., both oral ingestion and inhalation).

Multi-unit risk assessment of nuclear power plants: Current status and issues

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1199-1209
    • /
    • 2018
  • After the Fukushima-Daiichi accident in 2011, the multi-unit risk, i.e., the risk due to several nuclear power plants (NPPs) in a site has become an important issue in several countries such as Korea, Canada, and China. However, the multi-unit risk has been discussed for a long time in the nuclear community before the Fukushima-Daiichi nuclear accident occurred. The regulatory authorities around the world and the international organizations had proposed requirements or guidelines to reduce the multi-unit risk. The concerns regarding the multi-unit risk can be summarized in the following three questions: How much the accident of an NPP in a site affects the safety of other NPPs in the same site? What is the total risk of a site with many NPPs? Will the risk of the simultaneous accidents at several NPPs in a site such as the Fukushima Daiichi accident be low enough? The multi-unit risk assessment (MURA) in an integrated framework is a practical approach to obtain the answers for the above questions. Even though there were few studies to assess the multi-unit risk before the Fukushima-Daiichi nuclear accident, there are still several issues to be resolved to perform the complete MURA. This article aims to provide an overview of the multi-unit risk issues and its assessment. We discuss the several critical issues in the current MURA to get useful insights regarding the multi-unit risk with the current state art of probabilistic safety assessment (PSA) technologies. Also, the qualitative answers for the above questions are addressed.

Risk Assessment in the UK Health and Safety System: Theory and Practice

  • Russ, Karen
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.11-18
    • /
    • 2010
  • In the UK, a person or organisation that creates risk is required to manage and control that risk so that it is reduced 'So Far As Is Reasonably Practicable (SFAIRP).' How the risk is managed is to be determined by those who create the risk. They have a duty to demonstrate that they have taken action to ensure all risk is reduced SFAIRP and must have documentary evidence, for example a risk assessment or safety case, to prove that they manage the risks their activities create. The UK Health and Safety Executive (HSE) does not tell organisations how to manage the risks they create but does inspect the quality of risk identification and management. This paper gives a brief overview of where responsibility for occupational health and safety lies in the UK, and how risk should be managed through risk assessment. The focus of the paper is three recent major UK incidents, all involving fatalities, and all of which were wholly avoidable if risks had been properly assessed and managed. The paper concludes with an analysis of the common failings of risk assessments and key actions for improvement.

The Quantitative Risk Assessment for Railroad-tunnel Fire Incidents by using CFD code (CFD code를 이용한 철도터널 화재 위험도 평가)

  • Kim, H.B.;Lee, D.H.;Jang, Y.J.;Jung, W.S.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.169-172
    • /
    • 2011
  • Recently, railroad long tunnels are increasing and growing longer due to topological feathers like a lot of mountain in Korea. But fire disaster of a long tunnel cause many people to injury and death. For that reason, at the early design stage of a long tunnel, risk assessment and mitigation measure of risk for satisfying tunnel safety are required. According to the railroad facility safety standard (Korean MLTM Announcement No. 2006-395), risk assessment for railroad-tunnel fire should be performed when design stage. Therefore, various methods of risk assessment for tunnel fire have been studied and applied. In the paper, QRA(Quantitative Risk Analysis) for fire risk assessment by using CFD code is presented and the usefulness of CFD is discussed.

  • PDF

A Study on the Development of Railway Risk Assessment Information Management System (철도 위험도평가 전산시스템(RAIMS)의 설계 및 개발에 관한 연구)

  • Park, Chan-Woo;Kwak, Sang-Log;Park, Joo-Nam;Wang, Jong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1059-1064
    • /
    • 2006
  • Risk assessment of a railway system should be periodically conducted managing a large amount of accumulating accident/incident data and scenarios, which generally requires enormous time and efforts. Therefore, special information management system is essential for railway risk assessment, where data needed for decisions on managing the railway safety could be promptly supported. In this study, we develop the framework of a railway risk assessment information management system (RAIMS). The RAIMS is composed of two main modules: 1) hazard data processing module; 2) and risk assessment module. Hazard data could be turned into risk information using these two modules. The RAIMS will be useful in finding hazard conditions, quantitatively assessing the risk, and providing pertinent risk measures, eventually serving to prevent railway accidents and reduce severities of railway accidents.

  • PDF

A Study on the Optimization Effectiveness of Risk Assessment in Construction Industry (건설업 위험성 평가 실효성을 위한 최적화 연구)

  • Paek, Chung Hyeun;Cho, Ur Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.15-22
    • /
    • 2015
  • The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.

Risk Assessment in Finland: Theory and Practice

  • Anttonen, Hannu;Paakkonen, Rauno
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.1-10
    • /
    • 2010
  • The Finnish risk assessment practice is based on the Occupational Safety and Health (OSH) Act aiming to improve working conditions in order maintain the employees' work ability, and to prevent occupational accidents and diseases. In practice there are hundreds of risk assessment methods in use. A simple method is used in small and medium sized enterprises and more complex risk evaluation methods in larger work places. Does the risk management function in the work places in Finland? According to our experience something more is needed. That is, understanding of common and company related benefits of risk management. The wider conclusion is that commitment for risk assessment in Finland is high enough. However, in those enterprises where OSH management was at an acceptable level or above it, there were also more varied and more successfully accomplished actions to remove or reduce the risks than in enterprises, where OSH management was in lower level. In risk assessment it is important to process active technical prevention and exact communication, increase work place attraction and increase job satisfaction and motivation. Investments in OSH are also good business. Low absenteeism due to illness or accidents increases directly the production results by improved quality and quantity of the product. In general Finnish studies have consistently shown that the return of an invested euro is three to seven-old. In national level, according to our calculations the savings could be even 20% of our gross national product.

A Study on the Improvement of Risk Assessment Method in Laboratory (연구실 위험성평가방법 개선에 관한 연구)

  • Kim, Soo-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.3
    • /
    • pp.444-456
    • /
    • 2022
  • Purpose: Laboratories require Preliminary Risk Analysis of Hazard Factors, but there are many laboratories that do not. For the purpose of securing the safety of the laboratory, it is intended to find improvements so that the Risk Assessment can be easily applied. Method: Research papers and data from the Laboratory Safety Management Survey Report by the Ministry of Science and ICT were used. The study was conducted by comparing Preliminary Risk Analysis of Hazard Factors and Risk Assessment under the Occopational Safety and Health Act. Result: A technique for Risk Assessment of a laboratory was proposed. When Risk Assessment of the laboratory, a method was proposed to estimate the size of the possibility(frequency) and severity(intensity). Conclusion: For easy application in the laboratory, a checklist-type Risk Assessment technique was presented and actual evaluation was conducted. It is expected that the laboratory will improve through Risk Assessment to help prevent safety accidents.