• Title/Summary/Keyword: risk management method

Search Result 1,577, Processing Time 0.024 seconds

Application of risk evaluation and safety management system in urban deep tunnelling (도심지 대심도 터널에서의 리스크 평가 및 안전관리시스템 적용)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Younggeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.725-744
    • /
    • 2022
  • As the construction of infrastructure using the underground tunnel in urban area have been rapidly increased, various accidents and collapses of tunnel including structure have been occurred in deep urban tunnelling. The concern and worry relating to the risk and safety of the tunnel during excavation is becoming the key issues in deep urban tunnelling. In this study, it was conducted for deep urban tunnel at GTX (Great Train Express) line which was located in Seoul metropolitan area to determine the risk characteristics for tunnel according to urban tunnelling. Also, it was reviewed the risk analysis and evaluation of the tunnel, shaft and station. And after a review of risk analysis and evaluation for risk register and hazard identification by using a risk matrix method, safety management of the tunnel according to excavation was evaluated to be secured. This study is expected to be applied as useful approach in deep urban tunnelling if you need to review the risk and safety management system of tunnel according to mitigation measures in complex urban tunnelling.

A Study on Reduction of Hazard Conditions on Plant Work of Steel Industry (철강 제조업의 플랜트 공사 중 유해.위험 저감 방안)

  • Seo, Seong-Hwa;Weon, Jong-Il;Woo, Heung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2011
  • The hazard conditions on plant works of the steel industry have been investigated to efficiently prevent from industrial accidents. The plant works are eventually carried out by workers of smaller service companies where the safety management systems are not well established, on behalf of the main steel company. Based on the preliminary risk assessment on the plant working and open literature reviews, the safety management systems, which can be applied to the plant workplace of each process, are studied and then the step-by-step 4M check-list method is established. Accordingly, the risk assessment technique using 4M checklist for the plant workplace is proposed. In addition, a standardized flow-chart for safety management of plant work is introduced. These risk assessment technique and flow-chart can definitely contribute to the reduction of industrial accidents, considering the risk characterization and the unsafe conditions in small and medium-sized plant workplace, as effective safety management tools and safety guide line.

A Study on the Application of Cost Risk Exposure methods by the Probabilistic Evaluation on the Construction Projects (확률적 평가에 의한 건설공사 비용 위험도 측정의 적용성에 관한 연구)

  • Cho Jea-Ho;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.63-71
    • /
    • 2000
  • The paper considers two non-deterministic methods of analysing the risk exposure in a cost estimate The fist method(referred to as the 'conventional statistical' method) analyses cost data directly, to describe a probability distribution for total cost. The second method(referred to as the 'Monte Carlo simulation' method) interprets cost data directly, to generate a probability distribution for total costs from the descriptions of elemental cost distribution. The common practice of allowing for risk through an all-embracing contingency sum or percentage addition is challenged. Rather than excluding conventional, non-deterministic methods, they are here presented as possibly the only of effective foundation on which to risk management in cost estimating.

  • PDF

A TIME DETERMINATION MODEL INCORPORATING RISK MANAGEMENT BASED ON MALAYSIAN CASE STUDIES

  • Sim Nee Ting;Chung Thing Chong
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.642-648
    • /
    • 2009
  • Determining the total duration for a construction project is an integral part of project management in the construction industry. This is to ensure the project and all its associated activities can be carried out and completed within the time frame stipulated. There are several commonly used scheduling methods and techniques in project management, some of which involves manual calculation while others involve computer software. This paper looks into the various time determination methods, extracting out their differences and similarities. It also seeks to draw out the problems when determining time for projects, especially those encountered of case studies. Based on the results from the case studies, there were delays on certain projects even though time determination had been carried out rigorously prior to the commencement of the projects. This paper seeks to develop a time determination model, which incorporates risk management techniques into the calculations in order to improve the method for time estimation to minimize the chances of project delay.

  • PDF

Research on Improvement Measures for Chemical Risk Assessment for Small and Medium-Sized Businesses (중소규모 사업장을 위한 화학물질 위험성평가 개선방안 연구)

  • Ji Ung Choi;Woo Sub Shim
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.845-853
    • /
    • 2023
  • The Ministry of Employment and Labor announced a roadmap for reducing serious accidents to create a "safe and healthy workplace, happy Korea" and ordered a risk assessment for all work processes in all workplaces on November 30, 2022. Accordingly, even workplaces that handle new chemicals must conduct risk assessment when introducing new chemicals, but the risk assessment techniques currently proposed by the government focus on preventing conventional accidents such as falls, getting caught, and bumping. Currently, there is a Chemical Hazard Risk Management (CHARM) technique that is most commonly used for chemical risk assessment, but in small and medium-sized businesses that lack professional manpower related to chemical substances, there are many technical terms in the technique and it is difficult to interpret, so its utilization is very low. Therefore, the purpose of this study is to present a method that can make risk assessment easier and simpler before handling new chemicals so that it can be used well in small and medium-sized businesses that lack professional manpower related to chemical substances. Through actual cases, the method of using CHARM was confirmed step by step, and based on this, risk reduction establishment and execution methods were derived. Based on the results of this study, it is expected that it will be used as the best tool for preventing accidents such as acute poisoning when handling chemicals in small and medium-sized workplaces that lack professional manpower related to chemical substances and make every effort to protect workers' health.

Organization Behavior, Intellectual Capital, and Performance: A Case Study of Microfinance Institutions in Indonesia

  • MAHAPUTRA, I Nyoman Kusuma Adnyana;WIAGUSTINI, Ni Luh Putu;YADNYANA, I Ketut;ARTINI, Ni Luh Gede Sri
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.4
    • /
    • pp.549-561
    • /
    • 2021
  • This study aims to identify the role of organizational behavior and intellectual capital on risk management implementation and Village Credit Institutions (called LPD) performance. The LPD population is 1,256 units spread across nine districts/cities in Bali. This research was conducted at the LPD as the only microfinance institution based on local wisdom in traditional villages in Bali Province, Indonesia. Based on sampling using the Slovin method, there were 139 LPD as sampled in this study. The respondent in this study was the Head of the LPD. LPD performance measurement is using the balanced scorecard method that combines financial and non-financial aspects. This study also investigates risk management's role as a mediator in the relationship between organizational behavior and intellectual capital on the LPD performance. Methods of data collection using a survey. The questionnaire was given to 139 LPD chairman who was respondents in this survey. The data analysis technique used SEM-PLS. This study succeeded in confirming Resource-Based View Theory that organizational behavior and intellectual capital affect risk management and organization performance. These results also prove risk management's role as a mediation for the relationship between organizational behavior and intellectual capital on organizational performance.

Comparative Analysis of Risk Assessment Tools for Infectious Diseases (국외 감염병 위험도 평가체계의 비교분석)

  • Choi, Eunmi;Woo, Darae;Choe, YoungJune;Yeh, Jungyong;Park, Sangshin
    • Health Policy and Management
    • /
    • v.32 no.4
    • /
    • pp.380-388
    • /
    • 2022
  • Background: Emerging infectious diseases, such as Middle East respiratory syndrome or coronavirus disease 2019, pose a continuous threat to public health, making a risk assessment necessary for infectious disease control and prevention. Therefore, we aimed to investigate the risk assessment methods for infectious diseases used by major foreign countries and organizations. Methods: We conducted an investigation and comparative analysis of risk assessment and risk determination methods for infectious diseases. The risk assessment tools included the strategic toolkit for assessing risks, influenza risk assessment tool, pandemic severity assessment framework, and rapid risk assessment methodology. Results: The most frequently reported risk elements were disease severity, antiviral treatment, attack rate, population immunity, and basic productive ratio. The risk evaluation method was evaluated quantitatively and qualitatively by the stakeholders at each institution. Additionally, the final risk level was visualized in a matrix, framework, and x and y-axis. Conclusion: Considering the risk assessment tools, the risk element was classified based on the duplicate of each indicator, and risk evaluation and level of risk assessment were analyzed.

A Case Study on Risk Analysis of Large Construction Projects (건설공사를 위한 위험분석기법 사례연구)

  • Kim Chang Hak;Park Seo Young;Kwak Joong Min;Kang In-Seok
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1155-1162
    • /
    • 2004
  • This research proposes a new risk analysis method in order to guarantee successful performance of construction projects. The proposed risk analysis methods consists of four phases. First step, AHP model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Finally, Fuzzy theory suggests a risk management method for construction projects, which is using subjective knowledge of an expert and linguistic value, to analyze and quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and exposure, for estimating membership function are introduced to quantify each risk factor. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

A Noise-Reduced Risk Aversion Index

  • Park, Beum-Jo;Cho, Hong Chong
    • Journal of Information Technology Applications and Management
    • /
    • v.25 no.1
    • /
    • pp.67-85
    • /
    • 2018
  • We propose a noise reduced risk aversion index for measuring risk aversion through a laboratory experiment to overcome disadvantages of the multiple pricing list format developed by Holt and Laury (2002). We use randomized multiple list choices with coarser classification and reward weighting, supplement the rank of risk aversion with extra individual characteristics of risk attitude, and construct an index of risk aversion by standardizing the risk aversion ranking with quantile normalization. Our method reduces multiple switching problems that noisy decision makers mistakenly commit in experimental approaches, so that it is free of the framing effect which severely occurred in the HL. Furthermore, the index doesn't utilize any specific utility function or probability weighting, which allows researcher to hold the independence axiom. Since our noise reduced index of risk aversion has many good traits, it is widely used and applied to reveal fundamental characteristics of risk-related behaviors in economics and finance regardless of experimental environment.

A Study on the Visualization of HNS Hazard Levels to Prevent Accidents at Sea in Real-Time

  • Jeong, Min-Gi;Lee, Moonjin;Lee, Eun-Bang
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.23 no.3
    • /
    • pp.242-249
    • /
    • 2017
  • In order to develop an HNS safety management system to assess and visualize hazard levels via an automated method, we have conceptualized and configured a sample system. It is designed to quantify the risk of a vessel carrying HNS with a matrix method along navigational route and indicate hazards distribution with a contour map. The basic system which provides a visualized degree of hazards in real time has been introduced for the safe navigation of HNS ships. This is useful not only for decision making and circumstantial judgment but may also be utilized for HNS safety management with a risk base. Moreover, this system could be extended to address the navigational safety of marine traffic as well as of autonomous vessels in the near future if the sensors used are connected with IoT technology.