• Title/Summary/Keyword: risk assessment model

Search Result 1,066, Processing Time 0.023 seconds

Risk Assessment of Indoor Pollution by BTEX Released from Groundwater (지하수내 BTEX에 의한 실내오염시 위해도 평가)

  • 유동한;이한수;김상준;양지원
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.18 no.5
    • /
    • pp.373-381
    • /
    • 2002
  • Benzene, Ethyl-benzene, Toluene and Xylene (BTEX) can be released to a groundwater in case of the oil leakage from underground storage tank of a gas station. These chemicals are found to contribute to the total inhalation risk from contaminated indoor air. This study presents the assessment of a human exposure to such chemicals released from the groundwater into indoor air. At first, a 2-compartment model is developed to describe the transfer and distribution of the chemicals released from groundwater in a house through showering, washing clothes, and flushing toilets. The model is used to estimate a daily human exposure through inhalation of such BTEX for adults based on two sets of exposure scenarios. Finally, a sensitivity analysis is used to identify important parameters. The results obtained from the study would help to increase the understanding of risk assessment issues associated with the indoor pollution by BTEX released from contaminated groundwater.

Application Cases of Risk Assessment for British Railtrack System (영국철도시스템에 적용된 리스크평가 사례)

  • Lee, Dong-Ha;Jeong, Gwang-Tae
    • Journal of the Ergonomics Society of Korea
    • /
    • v.22 no.1
    • /
    • pp.81-94
    • /
    • 2003
  • The British railway safety research group has developed a risk assessment model for the railway infrastructure and major railway accidents. The major hazardous factors of the railway infrastructure were identified and classified in the model. The frequency rates of critical top events were predicted by the fault tree analysis method using failure data of the railway system components and ratings of railway maintenance experts, The consequences of critical top events were predicted by the event tree analysis method. They classified the Joss of accident due to railway system into personal. commercial and environmental damages. They also classified 110 hazardous event due to railway system into three categories. train accident. movement accident and non-movement accident. The risk assessment model of the British railway system has been designed to take full account of both the high frequency low consequence type events (events occurring routinely for which there is significant quantity of recorded data) and the low frequency high consequence events (events occurring rarely for which there is little recorded data). The results for each hazardous event were presented in terms of the frequency of occurrence (number of events/year) and the risk (number of equivalent fatalities per year).

Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction - (건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로-)

  • Bok, Hoon;Kim, Hyeong-Tae;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

Risk identification, assessment and monitoring design of high cutting loess slope in heavy haul railway

  • Zhang, Qian;Gao, Yang;Zhang, Hai-xia;Xu, Fei;Li, Feng
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.1
    • /
    • pp.67-78
    • /
    • 2018
  • The stability of cutting slope influences the safety of railway operation, and how to identify the stability of the slope quickly and determine the rational monitoring plan is a pressing problem at present. In this study, the attribute recognition model of risk assessment for high cutting slope stability in the heavy haul railway is established based on attribute mathematics theory, followed by the consequent monitoring scheme design. Firstly, based on comprehensive analysis on the risk factors of heavy haul railway loess slope, collapsibility, tectonic feature, slope shape, rainfall, vegetation conditions, train speed are selected as the indexes of the risk assessment, and the grading criteria of each index is established. Meanwhile, the weights of the assessment indexes are determined by AHP judgment matrix. Secondly, The attribute measurement functions are given to compute attribute measurement of single index and synthetic attribute, and the attribute recognition model was used to assess the risk of a typical heavy haul railway loess slope, Finally, according to the risk assessment results, the monitoring content and method of this loess slope were determined to avoid geological disasters and ensure the security of the railway infrastructure. This attribute identification- risk assessment- monitoring design mode could provide an effective way for the risk assessment and control of heavy haul railway in the loess plateau.

A Study on the Health Risk Assessment of Volatile Organic Compounds in a Petrochemical Complex (석유화학단지의 휘발성 유기화합물로 인한 인체 위해도 평가에 관한 연구)

  • 이진홍;김윤신;류영태;유인석
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.13 no.4
    • /
    • pp.257-267
    • /
    • 1997
  • This study focuses on the health risk assessment of airborne volatile organic compounds (VOCs) in a petrochemical complex, with several emphases on a risk assessment method. The first emphasis is on the importance of hazard identification to determine the likely carcinogenic potential of a VOC. Without considering this type of information, a direct comparison of the carcinogenic risks of two pollutants is meaningless. Therefore, wer suggest that this type of information be prepared and be listed with the estimate of cancer risk in parallel. The second emphasis is on the selection of a better dose-response model to estimate unit risk or cancer potency factor of a carcinogenic VOC. Finally, probilistic risk assessment method is discussed and recommended to use within a comparison of conventional point-estimate method. A health risk assessment has also been carried out. For non-carcinogenic risk, even the highest hazard index for carbon tetrachloride is estimated to be less than 1 with the other VOCs less than 0.03. However, the lifetime cancer risk from the inhalation of airborne VOCs is estimated to be about $2.6 \times 10^{-4}$ which is higher than the risk standard of $10^{-6}$ or even $10^{-5}$. Therefore, the investigation into domestic petrochemical complexes should be strengthened to obtain more fine long-term airborne VOC data.

  • PDF

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

Integrated risk assessment method for spent fuel road transportation accident under complex environment

  • Tao, Longlong;Chen, Liwei;Long, Pengcheng;Chen, Chunhua;Wang, Jin
    • Nuclear Engineering and Technology
    • /
    • v.53 no.2
    • /
    • pp.393-398
    • /
    • 2021
  • Current risk assessment of Spent Nuclear Fuel (SNF) transportation has the problem of the incomplete risk factors consideration and the general particle diffusion model utilization. In this paper, the accident frequency calculation and the detailed simulation of the accident consequences are coupled by the integrated risk assessment method. The "man-machine-environment" three-dimensional comprehensive risk indicator system is established and quantified to characterize the frequency of the transportation accidents. Consideration of vegetation, building and turbulence effect, the standard k-ε model is updated to simulate radioactive consequence of leakage accidents under complex terrain. The developed method is applied to assess the risk of the leakage accident in the scene of the typical domestic SNF Road Transportation (SNFRT). The critical risk factors and their impacts on the dispersion of the radionuclide are obtained.

Establishment of Navigational Risk Assessment Model Combining Dynamic Ship Domain and Collision Judgement Model (선박동적영역과 충돌위험평가식을 결합한 항해위험성평가모델 전개)

  • Kim, Won-Ouk;Kim, Chang-Je
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.1
    • /
    • pp.36-42
    • /
    • 2018
  • This paper considers the Marine Traffic Risk Assessment for fixed and moving targets, which threaten officers during a voyage. The Collision Risk Assessment Formula was calculated based on a dynamic ship domain considering the length, speed and maneuvering capability of a vessel. In particular, the Navigation Risk Assessment Model that is used to quantitatively index the effect of a ship's size, speed, etc. has been reviewed and improved using a hybrid combination of a vessel's dynamic area and the Collision Risk Assessment Formula. Accordingly, a new type of Marine Traffic Risk Assessment Model has been suggested giving consideration to the Speed Length Ratio, which was not sufficiently reflected in the existing Risk Assessment Model. The larger the Speed Length Ratio (dimensionless speed), the higher the CJ value. That is, the CJ value is presented well by the Speed Length Ratio. When the Speed Length Ratio is large, states ranging from [Caution], [Warning], [Dangerous] or [Very Dangerous] are presented from a greater distance than when the Speed Length Ratio is small. The results of this study, can be used for route and port development, including dangerous route avoidance, optimum route planning, breakwater width, bridge span, etc. as well as the development of costal navigation safety charts. This research is also applicable for the selection of optimum ship routing and the prevention of collisions for smart ships such as autonomous vessels.

DEVELOPMENT OF AN INTEGRATED RISK ASSESSMENT FRAMEWORK FOR INTERNAL/EXTERNAL EVENTS AND ALL POWER MODES

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • v.44 no.5
    • /
    • pp.459-470
    • /
    • 2012
  • From the PSA point of view, the Fukushima accident of Japan in 2011 reveals some issues to be re-considered and/or improved in the PSA such as the limited scope of the PSA, site risk, etc. KAERI (Korea Atomic Energy Research Institute) has performed researches on the development of an integrated risk assessment framework related to some issues arisen after the Fukushima accident. This framework can cover the internal PSA model and external PSA models (fire, flooding, and seismic PSA models) in the full power and the low power-shutdown modes. This framework also integrates level 1, 2 and 3 PSA to quantify the risk of nuclear facilities more efficiently and consistently. We expect that this framework will be helpful to resolve the issue regarding the limited scope of PSA and to reduce some inconsistencies that might exist between (1) the internal and external PSA, and (2) full power mode PSA and low power-shutdown PSA models. In addition, KAERI is starting researches related to the extreme external events, the risk assessment of spent fuel pool, and the site risk. These emerging issues will be incorporated into the integrated risk assessment framework. In this paper the integrated risk assessment framework and the research activities on the emerging issues are outlined.

A Basic Study on Assessment Criterion of the Risk Factor for the Marine Traffic Environment (해상교통환경 위험요소 평가기준 설정을 위한 기초 연구)

  • Kim, Chol-Seong;Lee, Hong-Hoon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.18 no.5
    • /
    • pp.431-438
    • /
    • 2012
  • The representative risk evaluation techniques of the marine traffic environment are the FSA, PAWSA, & IWRAP. For the development of these techniques, the risk factors suitable to the marine traffic environment should be selected & the assessment criterion of the risk factors should be provided. The risk factors were selected as the factors that relate both to the frequency of casualty & to the consequence of casualty because the risk was defined as the frequency of casualty times the consequence of that casualty on the existing techniques. But, the risk factors relate to the consequence of casualty are excluded because the risk is defined as the sum of the risk factors including the frequency and the consequence by factors on this study. The 20 kinds of risk factors to compose the risk are selected and classified into 5 categories according to similar nature through the analysis of preceding study on the classification of the risk factors. Finally, as the foundation of risk assessment model's development for domestic marine traffic environment, the practical assessment criterion of the risk factors are suggested.