• Title/Summary/Keyword: ring failure

Search Result 193, Processing Time 0.024 seconds

Failure Analysis of Large Ring Forged Products (대형 링단조품의 결함원인 분석 및 대책)

  • Jin, S.U.;Lee, Y.S.;Kim, S.S.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2009.05a
    • /
    • pp.107-113
    • /
    • 2009
  • In this study, the importance of failure analysis on large ring forged products was assessed and the process and methodology were introduced. Failure analysis case study of the large ring forged steel product with approximately 10 mm long internal crack found by non-destructive test (NDT) was presented. The micrographic and fractographic observations and the verifying tests were conducted on the cracked specimen to identify the possible metallurgical reason for the defects, and the metallurgical aspects of internal crack formation were discussed.

  • PDF

Numerical studies of the failure modes of ring-stiffened cylinders under hydrostatic pressure

  • Muttaqie, Teguh;Thang, Do Quang;Prabowo, Aditya Rio;Cho, Sang-Rai;Sohn, Jung Min
    • Structural Engineering and Mechanics
    • /
    • v.70 no.4
    • /
    • pp.431-443
    • /
    • 2019
  • The present paper illustrates a numerical investigation on the failure behaviour of ring-stiffened cylinder subjected to external hydrostatic pressure. The published test data of steel welded ring-stiffened cylinder are surveyed and collected. Eight test models are chosen for the verification of the modelling and FE analyses procedures. The imperfection as the consequences of the fabrication processes, such as initial geometric deformation and residual stresses due to welding and cold forming, which reduced the ultimate strength, are simulated. The results show that the collapse pressure and failure mode predicted by the nonlinear FE analyses agree acceptably with the experimental results. In addition, the failure mode parameter obtained from the characteristic pressure such as interframe buckling pressure known as local buckling pressure, overall buckling pressure, and yield pressure are also examined through the collected data and shows a good correlation. A parametric study is then conducted to confirm the failure progression as the basic parameters such as the shell radius, thickness, overall length of the compartment, and stiffener spacing are varied.

Study on the performance of elastomeric O-ring subjected to foreign objects using finite-element analysis (유한요소해석을 이용한 이물질이 고무 오링에 미치는 영향과 성능 평가)

  • Pack, Inseok;Rhee, Heejang;Lee, Seoksoon
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.3
    • /
    • pp.52-58
    • /
    • 2016
  • The elastomeric O-ring is the most-commonly-used seal due to its excellent sealing capacity, and its availability in various costs and sizes; furthermore, its importance has lasted over a long duration. However, a dearth of research exists in Korea regarding the elastomeric O-ring and the corresponding techniques. The constituent parts of elastomeric rubber are important; to determine their properties, the uni-axial tension and equi-biaxial tension need to be tested. Also, the non-linear analysis method reduces the design cost. An O-ring failure causes leaks and vibration. In this paper, foreign objects are used to affect an O-ring and its performance so that all angles of the O-ring design can be considered. This paper presents a solution for the O-ring-failure problem using a finite-element analysis.

Experimental investigations on the failure modes of ring-stiffened cylinders under external hydrostatic pressure

  • Cho, Sang-Rai;Muttaqie, Teguh;Do, Quang Thang;Kim, Sinho;Kim, Seung Min;Han, Doo-Hwan
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.10 no.6
    • /
    • pp.711-729
    • /
    • 2018
  • This paper reports on the experimental investigations on the failure modes of ring-stiffened cylinder models subjected to external hydrostatic pressure. Nine models were welded from general structural steel. The shells were initially formed by cold-rolling, and flat-bar ring frames were welded to the shell. The hydrostatic pressure tests were conducted by using water as the medium in pressure chambers. The details of the preparation and main test were briefly explained. The investigation identified the consequence of the structural failure modes, including: shell yielding, local shell buckling between ring stiffeners, overall buckling of the shell together with the stiffeners, and interactive buckling mode combining local and overall buckling. In addition, the ultimate strengths were predicted by using existing design codes. Non-linear numerical computations were also conducted by employing the actual imperfection coordinates. Finally, accuracy and reliability of the predictions of design formulae and numerical were substantiated with the test results.

Impacts of Hierarchy in Ethernet Ring Networks on Service Resiliency

  • Lee, Kwang-Koog;Ryoo, Jeong-Dong;Kim, Young-Lok
    • ETRI Journal
    • /
    • v.34 no.2
    • /
    • pp.199-209
    • /
    • 2012
  • In transport networks, a multi-ring architecture is very useful to facilitate network planning and to design and provide more resilient services for customers. Unlike traditional synchronous optical network multi-rings, the service resiliency of Ethernet-based multi-rings is significantly impacted by the ring hierarchy because a link or node failure in a certain level ring triggers filtering database flush actions in all higher level rings as well as in the ring with the failure, and consequently a large amount of duplicated data frames may be flooded. In this paper, we investigate how the ring hierarchy impacts the service resiliency of multi-ring networks. Based on extensive experiments on various single- and multiple-link failures, we suggest two effective inter-ring connection rules to minimize the transient traffic and to ensure more resilient multi-ring networks. In addition, we consider a flush optimization technique called e-ADV, and show that the combination of e-ADV and multi-ring structures satisfying our inter-ring connection rules results in a more attractive survivability performance.

Ultimate Behavior of GFRP Shell Structure Stiffened by Steel Pipe Ring (강관링으로 보강된 GFRP 쉘구조의 극한 거동)

  • Kim, In Gyu;Lim, Seung Hyun;Kim, Sung Bo
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.3
    • /
    • pp.219-229
    • /
    • 2014
  • The experiment and FE analysis of ultimate behavior of GFRP cylindrical shell structure stiffened by steel pipe ring instead of rectangular cross-section ring was presented. Four kinds of test models were designed and flexural failure experiment was performed to investigate ultimate behavior characteristic according to the size of cross section of steel pipe ring and diameter of GFRP shell. Material properties of specimens were experimented by bending, tensile and compressive test. Displacements and strains were measured to evaluate failure behavior of steel pipe ring and GFRP shell structure. The experimental results were compared with the FEA results by commercial program ABAQUS. It is observed that GFRP shell structure stiffened by steel ring have enough ductility to bending failure, and an increase of bending rigidity of steel ring is very effective to increase of failure strength of GFRP shell structure.

A study on Protective Coordination of MCA for Performing of the Pad Mounted Transformer's inside Protective Device (지상변압기의 내부 보호장비 작동을 위한 MCA 보호협조에 대한 연구)

  • Hyun, Seung-Yoon;Kim, Chang-Hwan
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.5-7
    • /
    • 2022
  • KEPCO's plan is undergoing a trial operation to replace the open-loop section with ring main units configuration where underground distribution lines are installed, by linking the multi-way circuit breakers auto (MCA) on the power side of each pad-mounted transformer. However, ring main units application mentioned above may cause the ripple effects, when implementing the configuration without a study of protection coordination. Because ring main units with classical pre-set protection devices contribution in fault condition didn't consider yet. For the reliable ring main units operation, it is necessary to resolve several protection issues such as the protection coordination with substation side, prevention of the transformer inrush current. These issues can radically deteriorate the distribution system reliability Hence, it is essential to design proper protection coordination to reduce these types of problems. This paper presents a scheme of ring main units' configuration and MCA's settings of time-current curves to preserve the performance of protection coordination among the switchgears considering constraints, e.g. prevention of the ripple effects (on the branch section when a transformer failure occurs and the mainline when a branch line failure occurs). It was confirmed that the propagation of the failure for each interrupter segment could be minimized by applying the proposed TCC and the interrupter settings for the MCAs (branch, transformer). Further, it was verified that the undetected area of the distribution automation system (DAS) could be supplemented by having the MCA configurated ring main units operate first, instead of the internal protection equipment in the transformer such as the fuse, STP when a transformer failure occurs.

Buckling failure of cylindrical ring structures subjected to coupled hydrostatic and hydrodynamic pressures

  • Ping, Liu;Feng, Yang Xin;Ngamkhanong, Chayut
    • Structural Monitoring and Maintenance
    • /
    • v.8 no.4
    • /
    • pp.345-360
    • /
    • 2021
  • This paper presents an analytical approach to calculate the buckling load of the cylindrical ring structures subjected to both hydrostatic and hydrodynamic pressures. Based on the conservative law of energy and Timoshenko beam theory, a theoretical formula, which can be used to evaluate the critical pressure of buckling, is first derived for the simplified cylindrical ring structures. It is assumed that the hydrodynamic pressure can be treated as an equivalent hydrostatic pressure as a cosine function along the perimeter while the thickness ratio is limited to 0.2. Note that this paper limits the deformed shape of the cylindrical ring structures to an elliptical shape. The proposed analytical solutions are then compared with the numerical simulations. The critical pressure is evaluated in this study considering two possible failure modes: ultimate failure and buckling failure. The results show that the proposed analytical solutions can correctly predict the critical pressure for both failure modes. However, it is not recommended to be used when the hydrostatic pressure is low or medium (less than 80% of the critical pressure) as the analytical solutions underestimate the critical pressure especially when the ultimate failure mode occurs. This implies that the proposed solutions can still be used properly when the subsea vehicles are located in the deep parts of the ocean where the hydrostatic pressure is high. The finding will further help improve the geometric design of subsea vehicles against both hydrostatic and hydrodynamic pressures to enhance its strength and stability when it moves underwater. It will also help to control the speed of the subsea vehicles especially they move close to the sea bottom to prevent a catastrophic failure.

Analysis on Decryption Failure Probability of TiGER (TiGER의 복호화 실패율 분석)

  • Seungwoo Lee;Jonghyun Kim;Jong Hwan Park
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.34 no.2
    • /
    • pp.157-166
    • /
    • 2024
  • Probability of decryption failure of a public key cryptography based on LWE(learning with errors) is determined by its architecture and parameter settings. Since large decryption failure probability leads to attacks[1] on scheme as well as degradation of performance, TiGER[2], a Ring-LWE(R)-based KEM proposed for the first round of KpqC, tried to reduce the decryption failure probability by using error correction code Xef and D2 encoding method. However, D'Anvers et al. has shown that the commonly assumed independence of each bit error is not established since in the case of an encryption scheme based on Ring-LWE(R) using an error correction code, there is error dependency which is not negligible[3]. In this paper, since TiGER does not consider the error dependency, we calcualte the decryption failure probability of TiGER by considering the error dependency. In addition, we found that the bit error probability is incorrectly calculated in TiGER, so we present the correct calculation.

Tensile Strength of Post-Installed High-Shear Ring Anchors (HRA) After Shear Loading (전단 하중을 경험한 후설치 고전단 링앵커의 인장 강도)

  • Jeon, Sang Hyeon;Chun, Sung-Chul;Kim, Jae Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.4
    • /
    • pp.61-68
    • /
    • 2018
  • Tensile load tests were conducted on High-Shear Ring Anchors (HRAs) after shear load had been applied to the HRAs, which had been developed to reduce the number of the anchors. Test variables include the embedment length of the rod and the width of the specimens and a total of 12 specimens were tested. Test results show that the HRAs pulled out due to bond failure or steel failure occurred in case that the HRAs were installed to the members with 300mm or greater width and the embedment length of 160mm (the actual embedment of rod is 140mm) or deeper. Except 4 HRAs showing steel failure of rod, the minimum and average of test-to-prediction by ACI 318-14 ratios are 1.18 and 1.79, respectively. The tensile strength of HRAs, after shear load was applied to the HRAs, can be safely evaluated by the minimum among the concrete breakout strength and bond strength with the actual embedment length of the rod.