• Title/Summary/Keyword: rigid diaphragm

Search Result 33, Processing Time 0.017 seconds

Approximate Analysis of Shear Wall-Frame Structure For Seismic Design (전단벽-골조 시스템의 내진설계를 위한 근사해석법)

  • Yoo, Suk-Hyung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.2
    • /
    • pp.99-106
    • /
    • 2019
  • A wall-frame structure resists horizontal load by the interaction between the flexural mode of the shear wall and the shear mode of the frame, which implies that the frame deflects only by reverse bending of the columns and girders, and that the columns are axially rigid. However, as the height of frame increases the shear mode of frame changes to flexural mode, which is due to the extension and shortening of the columns. An approximate hand method for estimating horizontal deflection and member forces in high-rise shear wall-frame structures subjected to horizontal loading is presented. The method is developed from the continuous medium theory for coupled walls and expressed in non-dimensional structural parameters. It accounts for bending deformations in all individual members as well as axial deformations in the columns. The deformations calculated from the presented approximate method and matrix analysis by computer program are compared. The presented approximate method is more accurate for the taller structures.

Utilizing a Novel Pituitary Retractor for Early Descent of the Diaphragma Sellae during Endoscopic Transsphenoidal Pituitary Surgery

  • Park, Jae-Sung;Chung, Dong-Sup;Yoon, Wan-Soo
    • Journal of Korean Neurosurgical Society
    • /
    • v.65 no.1
    • /
    • pp.114-122
    • /
    • 2022
  • Objective : Early descent of the diaphragm sellae (DS) during endoscopic endonasal transsphenoidal surgery (EETS) for pituitary macroadenoma surgery is occasionally a troublesome event by blocking the surgical field. Here we introduce an alternative technique with the new pituitary retractor and present our clinical experiences. Methods : We designed a simple and rigid pituitary retractor with the least space occupation in the nasal cavity to be compatible in EETS. The pituitary retractor was held by external holder system to support the herniated DS stably. We retrospectively reviewed a clinical 22 cases of pituitary macroadenomas underwent EETS using the pituitary retractor. Results : The pituitary retractor stably pushed up the herniated DS in all cases, and the surgeon proceeded the procedure with bimanual maneuver. The pituitary retractor was helpful to remove tumors around the medial cavernous sinus and behind the DS in 16 and seven cases, respectively. In four cases, the meticulous hemostasis was completed with the direct visualization by the DS elevation with this retractor. Gross total tumor resection was performed in 20/22 patients (91%). The impaired visual function and hypopituitarism were improved in 18/20 (90%) and 7/14 (50%) patients after surgery, respectively. There was no complication related with the pituitary retractor. Conclusion : During EETS for pituitary macroadenomas, the novel pituitary retractor reported in this study is a very useful technique when the herniated DS block the surgical field and bimanual maneuver. This pituitary retractor can help to result in the excellent surgical outcomes with minimal morbidity.

Simplified Analysis Formula for the Interaction of the Launching Nose and the Superstructure of ILM Bridge (압출추진코와 ILM 교량 상부구조 상호작용 해석식의 단순화)

  • Lee, Hwan-Woo;Jang, Jae-Youp
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.3
    • /
    • pp.245-258
    • /
    • 2012
  • ILM(incremental launching method) is a way of construction, installing a girder producing spot behind the abutment, making the bridge girder infilled with concrete continuously and launching with using by jack. The superstructure of the bridge constructed by this method is temporarily located on the center of the span and the supporting points under construction. Therefore, the sections are structurally undergone maximum positive moment, maximum negative moment, and maximum shear force arising from self weight. On the other hand, launching nose is attached to the front of the girder to decrease the cantilever effect. The magnitude of this temporary stress creating on the upper section is dependent upon the launching nose's characteristics. This study has proposed an analysis formula simplified on the assumption that the launching nose section is a quasi-equivalent section(rigid; equivalent section, weight; tapered section) in order to ensure the accuracy of the analysis formula and improve its usage with reference to the interaction between the launching nose and the upper section; and a prismatic analysis formula modified by displacing a diaphragm's weight by a concentrated load in order to improve the accuracy of the existing analysis formula that assumes the launching nose section as the equivalent section. To judge the accuracy and usage of two analysis formulas proposed, we have compared and analyzed computational structural analysis programs and existing analysis formulas based on actual ILM bridge data. As a result, all of two reveal the superior accuracy and also their usage has been improved by the simplification of analysis formulas.