• Title/Summary/Keyword: retrofit technologies

Search Result 17, Processing Time 0.023 seconds

Energy efficiency retrofit package plan for existing buildings (기존 건축물의 에너지 효율화 리트로핏 패키지 방안)

  • Kim, Su Min;Cho, Hyun Mi
    • Land and Housing Review
    • /
    • v.11 no.1
    • /
    • pp.95-101
    • /
    • 2020
  • In the past few decades, the global population growth and rapid economic development have resulted in significant increases in building energy consumption. To reduce greenhouse-gas emissions and building energy consumption, building materials and energy technologies must be optimized. Building retrofitting is a more efficient method than reconstruction to improve the building energy performance. In order to improve the energy performance of existing buildings, this study proposed energy-efficiency retrofit plans and derived cost-effective retrofit plan. The energy efficient retrofit method is achieved through the packaging of energy technology and the energy and cost reduction effect of the energy efficiency retrofit package are analyzed. As a result of the study, the energy-efficiency retrofit package showed an energy reduction effect of up to 60% or more and a construction cost reduction of about 30%. This study argues that optimal energy and construction cost reduction of existing buildings are possible through the packaging of energy efficiency technology.

Performance-based seismic evaluation and practical retrofit techniques for buildings in China

  • Wang, Hao;Sun, Baitao;Chen, Hongfu
    • Earthquakes and Structures
    • /
    • v.22 no.5
    • /
    • pp.487-502
    • /
    • 2022
  • China is prone to earthquake disasters, and the higher seismic performance is required by many existing civil buildings. And seismic evaluation and retrofit are effective measures to mitigate seismic hazards. With the development of performance-based seismic design and diverse retrofit technology for buildings, advanced evaluation methods and retrofit strategies are in need. In this paper, we introduced the evolution of seismic performance objectives in China combined with performance-based seismic design. Accordingly, multi-phase evaluation methods and comprehensive seismic capacity assessment are introduced. For buildings with seismic deficiency or higher performance requirements, the retrofit technologies are categorized into three types: component strengthening, system optimization, and passive control. Both engineering property and social property for the retrofit methods are discussed. The traditional seismic retrofit methods usually are costly and disturbing, and for example in Beijing, seismic strengthening costs approx. 1000 RMB/m2 (for 160 USD/m2), for hospital building even more expensive as 5000 RMB/m2(for 790 USD/m2). So cost-efficient and little disturbance methods are promising techniques. In the end, some opinions about the retrofit strategy and schemes category are shared and wish to discuss the situation and future of seismic retrofit in China.

Multi-alternative Retrofit Modelling and its Application to Korean Generation Capacity Expansion Planning (발전설비확장계획에서 다중대안 리트로핏 모형화 방안 및 사례연구)

  • Chung, Yong Joo
    • The Journal of Information Systems
    • /
    • v.29 no.1
    • /
    • pp.75-91
    • /
    • 2020
  • Purpose Retrofit, defined to be addition of new technologies or features to the old system to increase efficiency or to abate GHG emissions, is considered as an important alternative for the old coal-fired power plant. The purpose of this study is to propose mathematical method to model multiple alternative retrofit in Generation Capacity Expansion Planning(GCEP) problem, and to get insight to the retrofit patterns from realistic case studies. Design/methodology/approach This study made a multi-alternative retrofit GECP model by adopting some new variables and equations to the existing GECP model. Added variables and equations are to ensure the retrofit feature that the life time of retrofitted plant is the remaining life time of the old power plant. We formulated such that multiple retrofit alternatives are simultaneously compared and the best retrofit alternative can be selected. And we found that old approach to model retrofit has a problem that old plant with long remaining life time is retrofitted earlier than the one with short remaining life time, fixed the problem by some constraints with some binary variables. Therefore, the proposed model is formulated into a mixed binary programming problem, and coded and run using the GAMS/cplex. Findings According to the empirical analysis result, we found that approach to model the multiple alternative retrofit proposed in this study is comparing simultaneously multiple retrofit alternatives and select the best retrofit satisfying the retrofit features related to the life time. And we found that retrofit order problem is cleared. In addition, the model is expected to be very useful in evaluating and developing the national policies concerning coal-fired power plant retrofit.

A Case Study on Energy Performance Analysis of Retrofitted Building Using Inverse Model Toolkit (Inverse Model Toolkit을 이용한 리모델링 건축물의 에너지 성능평가 사례)

  • Kwon, Kyung-Woo;Lee, Suk-Joo;Park, Jun-Seok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.8
    • /
    • pp.394-400
    • /
    • 2014
  • Several models and methods have been developed to verify the improvement of energy performance in retrofit buildings. The verification is important to confirm the effectiveness of new technologies or retrofits. Inverse model toolkit proposed by ASHRAE evaluates the changes of the energy performance of retrofit buildings by using actual energy consumption data. In this study, the inverse model toolkit was used to analyze heating and cooling energy performance of an office building. Analyzed coefficients of correlation of actual energy consumption with estimated energy consumption was above 0.92 and well fitted. It was confirmed that energy consumption of natural gas decreased by 43.4% and also that electricity decreased by 13.8%, after the retrofit of the case building. For the energy usage, cooling energy was increased by 7.4%, heating energy was decreased by 42.3%, hot water and cooking were increased by 3.4%, lighting and electronics were decreased by 19.3%, and the total energy was decreased by 18.9%.

Smart Structure Technologies for Civil Infrastructures in Korea (국내 사회기반시설물에 대한 스마트 구조기술의 연구현황)

  • Yun, Chung-Bang;Yi, Jin-Hak
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.273-276
    • /
    • 2006
  • In this paper the recent research and application activities on smart structure technologies for civil infra structures in Korea are briefly introduced. The developments of structural health monitoring systems and effective retrofit/maintenance methodologies for infra structures have become active in Korea since the middle of 1990's, as the number of the deteriorated infra structures, mostly built on the rapidly industrialized period of 1970's, has increased very rapidly. Discussions are made on smart sensors, non destructive technologies, monitoring and assessment methods and systems for civil infra structures.

  • PDF

Case History: Micropiling for Existing Foundation Retrofits (마이크로파일을 이용한 기초보강공법의 국내 적용 사례)

  • Lee, Jung-Hoon;Choi, Chang-Ho;Cho, Sam-Deok;Lee, Ki-Hwan;Jo, Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.359-365
    • /
    • 2008
  • As housing supply ratio has become over 100%, the strategic vision of government's policies has been changed from new construction to maintenance and regeneration of old architectural-structures. This fact has brought a light on the reconstruction and remodeling industries and a need for retrofit and rehabilitation techniques of existing foundation. Various methods of foundation for architectural-structures do exist. Among them, micropiling technologies are increasingly applied in foundation rehabilitation and seismic retrofitting projects. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. The installation is possible in restrictive area and general ground conditions. The fact that the installation procedures cause minimal vibration and noise and require very low ceiling height makes the micropiling methods to be commonly used for underpin existing structures. Specialized drilling equipment is often required to install the micropiles for existing basement facilities. This paper presents a case study in which micropiles were constructed to support a superstructure for vertical extension of existing elevator core and provide accessibility to underground parking lot. It is intended to become useful reference for the similar remodeling project.

  • PDF

Flexural Performance of RC Beams Strengthened with NSM-GFRP Exposed to High Temperature (GFRP 표면매립공법으로 보강된 RC보의 고온노출 후 휨 성능)

  • Kim, Hee-Seung;Lee, Hye-Hak;Choi, Kyoung-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.35-42
    • /
    • 2018
  • This study evaluated the fire resisting capacity and post-fire serviceability of the concrete beams retrofitted by near surface mounted method(NSM) using GFRP plates. Main parameters in the test are grout materials and fire exposure. For the test, two types of grout materials between concrete substrate and GFRP plate were used; flame resisting epoxy and filling mortar. Four RC beam specimens were made and two of them were exposed to fire according to real scale fire curve proposed KS F 2257. After the fire exposure test, flexural test were performed to investigate the flexural performance of concrete beams including strength and deformation. From the test results, it was found that the beam retrofitted by NSM-GFRP presented higher flexural strength than that of the beam without retrofit, which indicates NSM-GFRP retrofit technologies is effective to maintain flexural strength even after fire exposure. In addition, the specimens grouted by epoxy showed good performance in strength but bad performance in ductility.

Identifying, Prioritizing, Measuring and Verifying Clean Energy Solutions for Korea's Public Building Renewable Energy Obligation Policy

  • Lee, Kwang Seob;Kang, Eun Chul;DA CUNHA, Ivor Francis;Lin, Cheng-Xian;Lee, Euy Joon
    • Transactions of the KSME C: Technology and Education
    • /
    • v.4 no.1
    • /
    • pp.11-18
    • /
    • 2016
  • Under the Renewable Heat Obligation (RHO) public buildings in the Republic of Korea larger than $10,000m^2$ must achieve an 11% overall reduction to thermal energy consumption. Well intended solutions have been proposed. However, not all option is evaluated on the same basis, potentially resulting in incomplete or sub-optimal solutions. What's more once projects are implemented, there are inconsistencies in the methods used to measure and evaluate operating performance of the post-retrofit case. The RETScreen decision tools and methodology can be used by decision makers, policy developers, architects, engineers and community leaders to evaluate and select the most effective solutions for Korea's RHO needs.

A Study of Redundant Design of a Control Rod Control System (제어봉 구동장치 제어시스템의 다중화 설계에 관한 고찰)

  • Sur, Joong-Surk;Cho, Chang-Ho;Yook, Sim-Kyun;Nam, Chae-Ho;Moon, Tae-Sun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2337-2339
    • /
    • 2003
  • Digital technologies are required to reduce to events due to human fails clarified existing nuclear power plant. When we are trying to retrofit control rod control system from analog system to digital one, new communication network and controller is required to be constructed. In this paper, we are going to introduce experience in developing economic and reliable control rod control system construction. this proposed system consists of redundant POS, communication network, and controller to provide enhance reliability and safety.

  • PDF