• Title/Summary/Keyword: rescheduling

Search Result 80, Processing Time 0.029 seconds

Qualitative Assessment of Breast Cancer Early Detection Services Provided through Well Woman Clinics in the District of Gampaha in Sri Lanka

  • Vithana, Palatiyana Vithanage Sajeewanie Chiranthika;Hemachandra, Nilmini Nilangani;Ariyaratne, Yasantha;Jayawardana, Pushpa Lalani
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.14 no.12
    • /
    • pp.7639-7644
    • /
    • 2013
  • Background: Breast cancer is the most common cancer diagnosed among women in Sri Lanka. Early detection can lead to reduction in morbidity and mortality. The objective here was to identify perceptions of public health midwives (PHMs) on the importance of early detection of breast cancer and deficiencies of and suggestions on improving existing breast cancer early detection services provided through Well Woman Clinics. Materials and Methods: A qualitative study using four focus group discussions (FGDs) were conducted among 38 PHMs in the Gampaha district in Sri Lanka and the meetings were audio-recorded, transcribed and analyzed using constant comparison and identifying themes and categories. Results: All the PHMs had a firm realization on the need of breast cancer early detection. The four FGDs among PHMs revealed non-availability of guidelines, inadequacy of training, lack of skills and material to provide health education, inability to provide privacy during clinical examination, shortage of stationery, lack of community awareness and motivation. The suggestions for the improvements of the programme identified in FGDs were capacity building of PHMs, making availability of guidelines, rescheduling clinics, improving the supervision, strengthening the monitoring, improving coordination between clinical and preventive sectors, and improving community awareness. Conclusions: Results of the FGDs can provide useful information on components to be improved in breast cancer early detection services. Study recommendations were training programmes at basic and post basic levels on a regular basis and supervision for the sustainance of the breast cancer early detection program.

Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans (다중 공정계획을 가지는 정적/동적 유연 개별공정에 대한 의사결정 나무 기반 스케줄링)

  • Yu, Jae-Min;Doh, Hyoung-Ho;Kwon, Yong-Ju;Shin, Jeong-Hoon;Kim, Hyung-Won;Nam, Sung-Ho;Lee, Dong-Ho
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.32 no.1
    • /
    • pp.25-37
    • /
    • 2015
  • This paper suggests a decision tree based approach for flexible job shop scheduling with multiple process plans. The problem is to determine the operation/machine pairs and the sequence of the jobs assigned to each machine. Two decision tree based scheduling mechanisms are developed for static and dynamic flexible job shops. In the static case, all jobs are given in advance and the decision tree is used to select a priority dispatching rule to process all the jobs. Also, in the dynamic case, the jobs arrive over time and the decision tree, updated regularly, is used to select a priority rule in real-time according to a rescheduling strategy. The two decision tree based mechanisms were applied to a flexible job shop case with reconfigurable manufacturing cells and a conventional job shop, and the results are reported for various system performance measures.

Energy Expenditure of Male Blue Collar Workers (생산직 남성근로자의 작업 중 에너지 소모량)

  • Woo, Ji Hoon;Kang, Dongmug;Shin, Yong Chul;Kim, Myeong Ock;Son, Min Jung;Kim, Boo Wook;Cho, Byung Mann;Lee, Su Ill
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.16 no.2
    • /
    • pp.183-192
    • /
    • 2006
  • Predicting energy expenditure (EE) is important to prevent work-related musculoskeletal disorders (WMSDs). The problem to predict EE is that the standard of EE is based on western data. The authors checked average EE by job categories to provide basic data for suggesting proper work intensity for Korean workers. This study was conducted from 2003 to 2005. Study subjects were recruited from 4 car parts assembly plant, 2 car assembly plant, 2 Heavy machine manufacturing plant and 2 shipyards. Total study subjects were 515 male workers. To estimate VO2max, sub-maximal test was conducted to measure VO275%max by bicycle ergometer (Combi Co, Aerobike 75XL II). Heartbeats were recorded with heartbeat recorder (Polar Electro Co, Finland, S810) during work. EE of work was calculated by recorded heartbeat and individual regression equation which was derived from sub-maximal test. Subjects were classified into 4 industry and 8 work posture, 23 job task categories. Mean EEs (S.D.) according to industry classification (kcal/min) were 4.9 (0.7), 4.8 (0.7), 4.9 (0.7), 5.0 (0.9), and 4.0 (0.5) for Car Part manufacture, Car Assembly, Ship Building, Heavy Machinery Manufacture, and Hospital Office, respectively. The results suggest that Korean male workers of exceeding to the NIOSH criteria will be needed to plan for job rescheduling to maintain $worker^{\circ}$Øs health. Further study to establish Korean work intensity standard would be needed.

Low-Latency Beacon Scheduling Algorithms for Vehicular Safety Communications (차량간 안전 통신에서 짧은 지연시간을 보장하는 비콘 스케줄링 알고리즘)

  • Baek, Song-Nam;Jung, Jae-Il;Oh, Hyun-Seo;Lee, Joo-Yong
    • Journal of the Korea Society for Simulation
    • /
    • v.20 no.1
    • /
    • pp.19-28
    • /
    • 2011
  • The safety applications based on the IEEE 802.11p, periodically transmit the safety-related information to all surrounding vehicles with high reliability and a strict timeline. However, due to the high vehicle mobility, dynamic network topology and limited network resource, the fixed beacon scheduling scheme excess delay and packet loss due to the channel contention and network congestion. With this motivation, we propose a novel beacon scheduling algorithm referred to as spatial-aware(SA) beacon scheduling based on the spatial context information, dynamically rescheduling the beaconing rate like a TDMA channel access scheme. The proposed SA beacon scheduling algorithm was evaluated using different highway traffic scenarios with both a realistic channel model and 802.11p model in our simulation. The simulation results showed that the performance of our proposed algorithm was better than the fixed scheduling in terms of throughput, channel access delay, and channel load. Also, our proposed algorithm is satisfy the requirements of vehicular safety application.

A Study of the Employee's Attitude Toward Operation of the Hospital Material Requirements Planning System(HMRPS) in University Hospitals (병원 종합 물류시스템 운영에 대한 관련직원들의 인식)

  • Lee, Kwang-Yong;Yu, Seung-Hum;Sohn, Tae-Yong
    • Korea Journal of Hospital Management
    • /
    • v.4 no.2
    • /
    • pp.266-285
    • /
    • 1999
  • The purpose of this study is to identify influencing factors for successful introduction, implementation and management of HMRPS through assessment of the employees attitude toward HMRPS in technical, administrative, and organization behavioral areas. Data were collected from 157 HMRPS employee members' self-reporting questionnaire in three university hospitals in the city of Seoul and Kyonggi Province from November 5 to November 10, 1997. Relevant literature on industry company MPR system theory was reviewed to develop the theoretical framework. The results were as follows: The employee's recognition of tangible benefit were more significantly influenced success than intangible benefit for successful operation relating the HMRPS. Concerning the employee's recognition of the successful HMRPS and the factor of influenced success was significantly positive correlation between tangible and intangible benefits and success factor in technical, administrative, and organizational behavior area. This study showed that major factor affecting the employee's recognition of tangible and intangible benefit for successful HMRPS. For tangible benefits; Success factors in the technical areas were quality of the data and information, efficiency of inventory management and rescheduling of operation plan. Success factors in the administrative areas were: role of top management. Success factors in the organization behavioral areas were; simplicity of the HMRPS, human resistance to change. For intangible benefits; Success factors in the organization behavioral areas were; user involvement, simplicity of HMRPS, human resistance to change. Futhermore as the exact evaluation of successful factors of HMRPS implement is needed, research for the development of systemic variables of physical distribution system control, methods, capacity of system, duration and other environment in many of 30 hospitals or more, and for the empirical study for HMRPS.

  • PDF

DEVS-based Modeling Simulation for Semiconductor Manufacturing Using an Simulation-based Adaptive Real-time Job Control Framework (시뮬레이션 기반 적응형 실시간 작업 제어 프레임워크를 적용한 웨이퍼 제조 공정 DEVS 기반 모델링 시뮬레이션)

  • Song, Hae-Sang;Lee, Jae-Young;Kim, Tag-Gon
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.3
    • /
    • pp.45-54
    • /
    • 2010
  • The inherent complexity of semiconductor fabrication processes makes it hard to solve well-known job scheduling problems in analytical ways, which leads us to rely practically on discrete event modeling simulations to learn the effects of changing the system's parameters. Meanwhile, unpredictable disturbances such as machine failures and maintenance diminish the productivity of semiconductor manufacturing processes with fixed scheduling policies; thus, it is necessary to adapt job scheduling policy in a timely manner in reaction to critical environmental changes (disturbances) in order for the fabrication process to perform optimally. This paper proposes an adaptive job control framework for a wafer fabrication process in a control system theoretical approach and implements it based on a DEVS modeling simulation environment. The proposed framework has the advantages in view of the whole systems understanding and flexibility of applying new rules compared to most ad-hoc software approaches in this field. Furthermore, it is flexible enough to incorporate new job scheduling rules into the existing rule set. Experimental results show that this control framework with adaptive rescheduling outperforms fixed job scheduling algorithms.

Tele-metering

  • Hearte, L.O.
    • 전기의세계
    • /
    • v.2
    • /
    • pp.6-14
    • /
    • 1949
  • Telemetering may be described as the art of metering at a considerable distance those quantities which are ordinarily encountered in industry, and in the generation of electric power. It is in the production of electric power that telemetering is particularly important, for it permits the system operator, or load dispatcher, to have before him at all times a continuous graphic record of the power output of each individual generating station together with an automatically made continuous graphic record of the total system output. There desired individual graphic records may be obtained showing power flow in or out, on important tie lines, etc. Such arrangements have the very great advantage that loads may be assigned to each generating station so that the best over-all system economy may be obtained and the system operator at all times may see with his own eyes that loads scheduled are actually held at the various stations. Moreover, with such equipment, in the event of system or station trouble the load dispatcher can see exactly what station, or stations, are affected and to what extent, without having to get in touch with anyone by telephone. Decisions can, therefore, be quickly reached for rescheduling the load. One of the most accurate and reliable telemetering systems is based on the use of potentiometric circuits, the fundamentals of which are discussed below. A member of such telemetering systems have been installed for the Boston Edicon Co., Boston, Massachusetts, the Consolidated Edison Co. of New York City. The Public Service Gas & Electric Co. of Newark, new Jersey. The Philadelphia Electric Co. for Philadelphia, Pennsylvania, and the Pennsylvania Railroad Co. for their electrified zone between New York and Washington a distance of over 200 miles. The scale of the totalizing recorder for the New York area is 3,000,00 KW. That of the totalizing recorder for the Philadelphia area is 2,000,000 KW. The initial installation using this type of equipment described was placed in service for the Philadelphia Electric Co. in 1923. All of the original recording instruments are still in service, later instruments have been added to take care of additions to the power system and naturally these later recorders have incorporated in those refinements in design made since the earlier ones were manufactured. Many other installations of similar equipment have been made in the United States in various locations such as at St. Louis, on the West Coast, at Baltimore and in Washington, D.C. While the use of these basic potentiometric circuits involves the use of continuous metallic circuits of good insulation resistance and free of grounds, nevertheless, intermediate transmission links, involving and impulse method suitable for use on telephone Morse carrier channels is available. This same method may be employed on power line carrier systems and is also suitable for use on beam type microwave transmission. Many impulse type units are also used as a link in these potantiometric methods. For the sake of brevity a description is given only of these basic potentiometric circuits. If there is sufficient interest in Korea, a further paper can be given covering those impulse circuits also.

  • PDF

Ramp Activity Expert System for Scheduling and Co-ordination (공항의 계류장 관리 스케줄링 및 조정을 위한 전문가시스템)

  • Jo, Geun-Sik;Yang, Jong-Yoon
    • Journal of Advanced Navigation Technology
    • /
    • v.2 no.1
    • /
    • pp.61-67
    • /
    • 1998
  • In this paper, we have described the Ramp Activity Coordination Expert System (RACES) which can solve aircraft parking problems. RACES includes a knowledge-based scheduling problem which assigns every daily arriving and departing flight to the gates and remote spots with the domain specific knowledge and heuristics acquired from human experts. RACES processes complex scheduling problem such as dynamic inter-relations among the characteristics of remote spots/gates and aircraft with various other constraints, for example, custome and ground handling factors at an airport. By user-driven modeling for end users and knowledge-driven near optimal scheduling acquired from human experts, RACES can produce parking schedules of aircraft in about 20 seconds for about 400 daily flights, whereas it normally takes about 4 to 5 hours by human experts. Scheduling results in the form of Gantt charts produced by the RACES are also accepted by the domain experts. RACES is also designed to deal with the partial adjustment of the schedule when unexpected events occur. After daily scheduling is completed, the messages for aircraft changes and delay messages are reflected and updated into the schedule according to the knowledge of the domain experts. By analyzing the knowledge model of the domain expert, the reactive scheduling steps are effectively represented as rules and the scenarios of the Graphic User Interfaces (GUI) are designed. Since the modification of the aircraft dispositions such as aircraft changes and cancellations of flights are reflected to the current schedule, the modification should be notified to RACES from the mainframe for the reactive scheduling. The adjustments of the schedule are made semi-automatically by RACES since there are many irregularities in dealing with the partial rescheduling.

  • PDF

A Study on the Development of the Cash-Flow Forecasting Model in Apartment Business factoring tn Housing Payment Collection Pattern and Payment Condition for Construction Expences (분양대금 납부패턴과 공사대금 지급방식 변화를 고려한 공동주택사업의 현금흐름 예측모델 개발에 관한 연구)

  • Kim Soon-Young;Kim Kyoon-Tai;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.353-358
    • /
    • 2001
  • Since the financial crisis broke out, liquidity has become the critical issue in housing construction industry. In order to secure liquidity, it is prerequisite to precisely forecast cash flow. However, construction companies have failed to come up with a systematic process to manage and forecast cash flow. Until now, companies have solely relied on the prediction of profits and losses, which is carried out as they review business feasibility. To obtain more accurate cash flow forecast model, practical pattern of payments should be taken into account. In this theory, basic model that analyzes practical housing payment collection pattern resulting from prepayments and arrears is described. This model is to complement conventional cash flow forecast scheme in the phase of business feasibility review. Analysis result on final losses in cash that occur as a result of prepayment and arrears is considered in this model. Additionally, in the estimation of construction cost in the phase of business feasibility review, real construction prices instead of official prices are applied to enhance accuracy of cash outflow forecast. The proportion of payment made by a bill and changes in payment date caused by rescheduling of a bill are also factored in to estimate cash outflow. This model would contribute to achieving accurate cash flow forecast that better reflect real situation and to enhancing efficiency in capital management by giving a clear picture with regard to the demand and supply timing of capital.

  • PDF

Denied Boarding and Compensation for Passengers in the EU Air Transport Legal Framework and Cases (항공여객운송에서의 탑승거부와 여객보상기준)

  • Sur, Ji-Min
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.34 no.1
    • /
    • pp.203-234
    • /
    • 2019
  • The concept of denied boarding is defined in Article 2(j) of Regulation 261/2004 thus: "denied boarding means a refusal to carry passengers on a flight, although they have presented themselves for boarding under the conditions laid down in Article 3(2), except where there are reasonable grounds to deny them boarding, such as reasons of health, safety or security, or inadequate travel documentation." So far as relevant to this case, to be entitled to compensation, if denied boarding, Article 3(2) provides a passenger must first come within the scope of the protection of the Regulation, which applies under the following conditions: "${\cdots}$.that passengers (a) have a confirmed reservation on the flight concerned and, except in the case of cancellation referred to in Article 5, present themselves for check-in, as stipulated and at the time indicated in advance and in writing (including by electronic means) by the air carrier, the tour operator or an authorised travel agent, or, if no time is indicated, not later than 45 minutes before the published departure time." This paper reviews the EU Cases such as Rodríguez Cachafeiro v. Iberia [2012] Case C-321/11; Finnair Oyj v. Timy Lassooy [2012] Case C-22/11; Caldwell v. easyJet Airline Co. Ltd. [2015] ScotSC 64. ECJ and Sheriff court of Scotland held that the concept of denied boarding, within the meaning of Articles 2(j) and 4 of Regulation No 261/2004 establishing common rules on compensation and assistance to passengers in the event of denied boarding and of cancellation or long delay of flights, and repealing Regulation No 295/91, must be interpreted as relating not only to cases where boarding is denied because of overbooking but also to those where boarding is denied on other grounds, such as operational reasons. Also, ECJ ruled that Articles 2(j) and 4(3) must be interpreted as meaning that the occurrence of extraordinary circumstances resulting in an air carrier rescheduling flights after those circumstances arose cannot give grounds for denying boarding on those later flights or for exempting that carrier from its obligation, under Article 4(3) of that regulation, to compensate a passenger to whom it denies boarding on such a flight.