• 제목/요약/키워드: request scheduling

검색결과 90건 처리시간 0.024초

2-단계 공급사슬경영 시스템에서 주문배달 및 수거를 위한 차량운송계획 모델 (A Vehicle Pickup and Deliverly Scheduling with Advance Requests Tin a 2-Echelon Supply-Chain System)

  • 황흥석
    • 산업공학
    • /
    • 제13권3호
    • /
    • pp.462-470
    • /
    • 2000
  • This paper is concerned with a vehicle routing model to assist in scheduling palletized cargo pickup and delivery so called the pickup and delivery problem with advance requests in a 2-echelon supply-chain system. In this study vehicles is dispatched and routed so that each request is picked up or delivered at its original and to its destination. The model provides point-to-point transportations based on advance requests. The assignment algorithm is developed and designed for using with on-line computers and it immediately provides arrangements to be made at the time requested. This algorithm also provides the best scheduling solutions and alternatives for both to system operators and requesters. According to this algorithm, we developed computer programs and show the sample results.

  • PDF

멀티미디어 저장 시스템을 위한 사용자 요청 통합 (Unifying User Requests for Multimedia Storage Systems)

  • 황인준
    • 한국정보과학회논문지:데이타베이스
    • /
    • 제29권1호
    • /
    • pp.15-26
    • /
    • 2002
  • 대부분의 멀티미디어 저장 시스템은 사용자의 요청을 라운드-로빈(round-robin) 방식으로 수행한다. 즉, 사용자는 일정한 간격을 두고 정해진 시간 동안 저장 시스템의 서비스를 받게 된다. 더욱이, 여기에 사용되는 대부분의 알고리즘들은 시스템과 밀접하게 연관된 비용함수를 바탕으로 평가를 받게 된다. 이러한 알고리즘의 FCFS, SCAN, SCAN-EDF 등이 있다. 본 논문에서는 주어진 사용자 요청에 대해서 사용자 대기 시간이나 최대 디스크 대역폭과 같은 제약 조건들을 만족시키는 동시에 임의의 비용 함수에 대해 최적의 스케줄인 통합 읽기 요청(Unified Read Request)을 생성하는 요청 통합기(Request Unifier) 모듈을 설계한다. 그리고 이러한 사용자 요청 통합에 사용될 수 있는 세 개의 알고리즘을 제안하고 성능 평가를 통해 그들의 장단점을 비교해 본다.

주문형 멀티캐스팅 기법을 사용한 새로운 MOD 시스템의 구현 (Implementation of New MOD System Using On-demand Multicasting Technique)

  • 김영준;황태준;권기섭;김익수
    • 정보처리학회논문지B
    • /
    • 제10B권7호
    • /
    • pp.847-852
    • /
    • 2003
  • 본 논문은 멀티캐스트 전송을 이용한 MOD 시스템을 구현하였다. 기존의 시스템은 서버 지향적인 멀티캐스트 시스템을 제공하였지만 구현된 시스템은 사용자 요구 지향적인 멀티캐스트 시스템을 제공한다. 스케줄러는 사용자의 요구를 수집하고 요구된 비디오 아이템과 서비스 시간에 따라서 멀티캐스트 그룹 주소와 포트 번호를 발생한다. 그러면 스케줄러는 MOD 서버와 서비스를 요구한 사용자에게 즉시 멀티캐스트 주소와 포트 번호를 전송한다. .그리고 MOD 서버는 멀티캐스트 그룹 주소로 요구한 스트림을 전송하고, 사용자는 자동으로 그룹 주소에 가입한다. 스케줄러는 같은 스케줄링 시간 안에 있는 다른 사용자들이 동일한 비디오를 요구하였을 때 같은 멀티캐스트 그룹 주소를 할당한다. 구현된 MOD 시스템은 동시에 많은 사용자에게 서비스할 뿐 아니라 서버의 부하를 크게 줄일 수 있음을 확인하였다.

VBR 비디오 스트림 전송을 위한 모바일 클라이언트 버퍼 수준 기반 스케쥴링 알고리즘 (Mobile Client Buffer Level-based Scheduling Algorithms for Variable-Bit-Rate Video Stream Transmission)

  • 김진환
    • 한국멀티미디어학회논문지
    • /
    • 제15권6호
    • /
    • pp.814-826
    • /
    • 2012
  • 모바일 통신망에서 클라이언트들의 재생 버퍼 수준을 이용하여 VBR 비디오 스트림을 전송하는 스케쥴링 알고리즘들이 본 논문에서 제시된다. 이 알고리즘들은 모바일 통신망에서 집중식 비디오 서버와 클라이언트들 간에 제한된 통신 대역폭을 최대한 활용할 수 있다. 비디오 서버는 동시에 다수의 비디오 요청을 서비스하기 때문에 통신망 대역폭을 공평하고 효율적으로 할당하여 활용하는 것이 중요하다. 각 비디오 재생시 서비스 품질과 실시간적 성능을 향상시키기 위하여 비디오 서버는 일시적으로 버퍼 수준이 낮은 비디오 요청 작업을 우선적으로 서비스하고자 더 많은 대역폭을 할당하게 된다. 버퍼 수준이 상이한 모바일 클라이언트들에게 공평한 서비스와 부하 균형이 제공되는 시뮬레이션 결과가 나타났으며 각 클라이언트의 재생 시간전까지 성공적으로 전송되는 프레임의 수가 최대화되었다.

ISO Coordination of Generator Maintenance Scheduling in Competitive Electricity Markets using Simulated Annealing

  • Han, Seok-Man;Chung, Koo-Hyung;Kim, Balho-H.
    • Journal of Electrical Engineering and Technology
    • /
    • 제6권4호
    • /
    • pp.431-438
    • /
    • 2011
  • To ensure that equipment outages do not directly impact the reliability of the ISO-controlled grid, market participants request permission and receive approval for planned outages from the independent system operator (ISO) in competitive electricity markets. In the face of major generation outages, the ISO will make a critical decision as regards the scheduling of the essential maintenance for myriads of generating units over a fixed planning horizon in accordance with security and adequacy assessments. Mainly, we are concerned with a fundamental framework for ISO's maintenance coordination in order to determine precedence of conflicting outages. Simulated annealing, a powerful, general-purpose optimization methodology suitable for real combinatorial search problems, is used. Generally, the ISO will put forward its best effort to adjust individual generator maintenance schedules according to the time preferences of each power generator (GENCO) by taking advantage of several factors such as installed capacity and relative weightings assigned to the GENCOs. Thus, computer testing on a four-GENCO model is conducted to demonstrate the effectiveness of the proposed method and the applicability of the solution scheme to large-scale maintenance scheduling coordination problems.

이동통신에서 멀티미디어 트래픽 속성에 따른 채널 할당 방식과 작업 스케줄링 기법 (Channel Allocation Method and Job scheduling Scheme by Property of Traffic in Cellular Network)

  • 허보진;손동철;김창석;이상용
    • 한국지능시스템학회논문지
    • /
    • 제16권4호
    • /
    • pp.436-442
    • /
    • 2006
  • 이동통신망에서 주파수라는 한정된 자원을 최적으로 활용하는 것은 중요한 일이며 멀티미디어 서비스를 제공하는 환경에서는 더욱 더 절실한 요소이다. 또한 이런 서비스 요구에 따라 기지국이나 단말기에서 작업 스케줄링을 어떻게 하느냐 하는 것도 전체 시스템의 성능을 평가하는 중요한 요소이다. 이동망에서 서비스 별 채널할당은 핸드오프가 일어나는 시점에 빈번히 일어나며 전체 시스템에 큰 영향을 주게 된다. 본 논문에서는 음성과 데이터 호를 동시에 서비스하는 CDMA 셀룰러 시스템에서 핸드오프를 중점으로 멀티미디어 서비스 트래픽 특성을 고려한 주파수할당과 작업 스케줄링이라는 두 가지 요소를 접목하는 방법론을 모델화하고 알고리즘을 제시한다.

환자분류에 의한 간호인력 산정 및 배치과정 전산화 (Computerization of Nurse Staffing and Scheduling according to Patient Classification)

  • 박정호;박현애;조현;최용선
    • 대한간호학회지
    • /
    • 제26권2호
    • /
    • pp.399-412
    • /
    • 1996
  • Even though Korean medical law stipulates that number of patients attended by a nurse is 2.5 for hospitalization and 30 for ambulatory care, the number of patients cared by a nurse per day is much greater than the standard prescribed by the medical law. Current nursing productivity of nurses is not desirable unless the quality of care considered. Moreover. nursing manpower staffing based on neither current nurses' productivity nor standard of medical law cannot respond properly to dynamic situation of the medical services. As for the nurse scheduling, the critical problem of it in the hospital is determining the day-to-day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. Nurse scheduling, however, involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. Under these backgrounds, the necessity of more efficient management of nursing manpower occupying 1/3 of total hospital workers has been recognized by many nursing administrators. This study was performed to develop a system computerizing nurse staffing and scheduling based on the patient classification. As a preliminary step for the system development, nursing workload in a secondary hospital was measured from Sep. to Oct. 1994. On the grounds of this result, computerization of nurse staffing and scheduling was proceeded with three options. First one is based on the current medical law. Second one is based on the assigned number of nursing staff. And the last is based on the request by patient classification. Computer languages used in this study were MS Visual Basic 3.0 for the staffing and Access 2.0 for the scheduling, respectively. Prospective users may operate this system easily because icons and mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurse administrators manage nursing manpower efficiently and nurses develop quick and easy schedule generation and allow more time for the patient care.

  • PDF

클라우드 자원 브로커에서 확장성 있는 가상 머신 할당 기법을 이용한 비용 적응형 작업 스케쥴링 알고리즘 (A Cost-Efficient Job Scheduling Algorithm in Cloud Resource Broker with Scalable VM Allocation Scheme)

  • ;김성환;강동기;김병상;윤찬현
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제1권3호
    • /
    • pp.137-148
    • /
    • 2012
  • 사용자들은 자신의 작업을 처리하기 위해 자신에게만 한정된 가상 컴퓨팅 자원을 클라우드 서비스 제공자로부터 할당 받아 타 사용자로부터 독립된 환경에서 작업을 처리하게 된다. 이를 자동화된 방법으로 최적화를 대신 수행해주기 위한 모델로 브로커 미들웨어가 제시되었고 마감시간을 만족하는 이내에서 자원 이용률을 높이는 접근법으로 필요 가상 머신의 숫자를 줄여 비용을 절약한다. 이를 다루는 많은 논문들에서 작업 스케줄링은 기존 사용자들간의 독립을 보장하여 하나의 가상 머신이 하나의 작업에 한정된 가상 머신에서 처리하는 방식으로 다루어지고 있다. 하지만 기존의 SRSV 방식에서는 높은 정도의 다중 프로그래밍 작업이 아닐 경우 시스템을 효율적으로 사용하지 못한다. 이에 본 논문에서는 해당 자원을 마감시간과 스래싱(thrashing), 문맥 전환(context switching)에 따른 성능 저하를 고려한 상태에서 다중 프로그래밍 정도를 높여 낭비되는 자원을 최소화하여 비용을 절약하려고 한다. 실험 결과를 통해 제안하는 방법이 제약조건 이내에서 기존의 방식에 비해 좀 더 좋은 가격 대비 성능을 가지는 것을 보인다.

대용량 XG-PON을 위한 Pipeline 방식의 동적대역할당 방법 (Pipelined Dynamic Bandwidth Algorithm for Large-Scale XG-PON)

  • 이은성;한만수
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2014년도 춘계학술대회
    • /
    • pp.693-694
    • /
    • 2014
  • 이 논문에서는 단위시간 이내에 동적대역할당 완료가 어려운 XG-PON (10-Gbps-capable passive optical network) passive optical networks) 시스템에 사용할 수 있는 새로운 pipeline 방식의 동적대역할당 방식을 제안한다. 제안한 방식에서는 request가 각각의 pipeline 블록에 즉시 입력되어 성능이 개선된다.

  • PDF

Combining Vehicle Routing with Forwarding : Extension of the Vehicle Routing Problem by Different Types of Sub-contraction

  • Kopfer, Herbert;Wang, Xin
    • 대한산업공학회지
    • /
    • 제35권1호
    • /
    • pp.1-14
    • /
    • 2009
  • The efficiency of transportation requests fulfillment can be increased through extending the problem of vehicle routing and scheduling by the possibility of subcontracting a part of the requests to external carriers. This problem extension transforms the usual vehicle routing and scheduling problems to the more general integrated operational transportation problems. In this contribution, we analyze the motivation, the chances, the realization, and the challenges of the integrated operational planning and report on experiments for extending the plain Vehicle Routing Problem to a corresponding problem combining vehicle routing and request forwarding by means of different sub-contraction types. The extended problem is formalized as a mixed integer linear programming model and solved by a commercial mathematical programming solver. The computational results show tremendous costs savings even for small problem instances by allowing subcontracting. Additionally, the performed experiments for the operational transportation planning are used for an analysis of the decision on the optimal fleet size for own vehicles and regularly hired vehicles.