• Title/Summary/Keyword: repairing

Search Result 878, Processing Time 0.026 seconds

Improvement of strength and prevention of twist strain in sewer pipe using glass fiber and twist prevention band (유리 섬유와 뒤틀림 방지 밴드를 이용한 하수관거의 강도 및 뒤틀림 개선 방안 연구)

  • Hong, Seok In;Im, Jiyeol;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.19 no.1
    • /
    • pp.63-68
    • /
    • 2017
  • Maintenance of sewer pipe process sewer pipe repairing process is necessary for deterioration of sewer pipe. In this research, analysis on performance (strength and twist strain) of eco-friendly and even expanded liner process using glass fiber and twist prevention band. As a results, tensile strength, bending strength and failure load is increased after the sewer pipe repairing process than advanced research results. And sewer pipe after the this process obtained advantage of prevention of twist strain and economic. After the this research, sewer pipe repairing process using glass fiber and twist prevention band could be suggest the eco-friendly and effective sewer pipe repairing process.

A Statistical Review on States Relating to Operation of Radiotherapy Equipments in Seoul National University Hospital (서울대학교병원의 방사선치료장비 운용 통계에 관한 고찰)

  • Park, Heung-Deuk;Kim, Wan-Sun;Ahn, Hee-Yong
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.6 no.1
    • /
    • pp.21-30
    • /
    • 1994
  • To analyze the states of operation of radiotherapy facilities in the period from 1979 to 1992 and to get the base for efficient operation and maintenance of the radiotherapy facilities. Data on the records of annual number of patients operated by each facility; span of suspension of operation, the cost and span of repairing, and parts of oui-of-order in the period from 1979 to 1992 were analyzed. We made a comparative analysis of average annual number of patients, annual span of the suspension of operation, annual cost ratio of repair, span of repairing per break down, and total number of broken parts. We could get following annual number of patients(day), span of the suspension of span ($\%$)(day). annual cost ratio fo repair($\%$), span of repairing per break down(Min-Max, day), and number of broken parts from this analysis. 1. Cobalt unit (Picker C-9) : 10,389(43), 0.4(0.83) 0.07, 1hr-2, 3 2. Linac(Clinac 6/100) : 11,492(50), 4.0(9.57), 0.98, 1hr-30, 12 3. Linac(Clinac 18) : 9.115(44), 12.7(30.5), 3.54, 1hr-108. 41 4. Simulator(Picker Ther-X) : 2,017(9), 0.51(1.3), 0.24, 1hr-2, 7 5. RTP(Capentec Cap-plan) : 528(2), 0.4(0.93), - hrs, - The conclusion obtained from statistical analysis above are as follows. 1. The rate of operation of Cobalt unit($99.6\%$) was higher that of Linear Accelerators ($87.3\%$). The rates operation of Simulator and RTP computer were very close to that of Cobalt unit. 2. In order to raise up the working ratio of accelerator. it is desirable that we keep our engineer to learn a sufficient technical skill and the equipment agent to stock sufficient spare parts. 3. In order to maintain Linear Accelerator efficiently, it is desirable to have annually $2.3\%$ of the purchase price of equiment for repairing.

  • PDF

Post-fire Repair of Concrete Structural Members: A Review on Fire Conditions and Recovered Performance

  • Qiu, Jin;Jiang, Liming;Usmani, Asif
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.4
    • /
    • pp.323-334
    • /
    • 2021
  • Concrete structures may rarely collapse in fire incidents but fire induced damage to structural members is inevitable as a result of material degradation and thermal expansion. This requires certain repairing measures to be applied to restore the performance of post-fire members. A brief review on investigation of post-fire damage of concrete material and concrete structural members is presented in this paper, followed by a review of post-fire repair research regarding various types of repairing techniques (FRP, steel plate, and concrete section enlargement) and different type of structural members including columns, beams, and slabs. Particularly, the fire scenarios adopted in these studies leading to damage are categorized as three levels according to the duration of gas-phase temperature above 600℃ (t600). The repair effectiveness in terms of recovered performance of concrete structural members compared to the initial undamaged performance has been summarized and compared regarding the repairing techniques and fire intensity levels. The complied results have shown that recovering the ultimate strength is achievable but the stiffness recovery is difficult. Moreover, the current fire loading scenarios adopted in the post-fire repair research are mostly idealized as constant heating rates or standard fire curves, which may have produced unrealistic fire damage patterns and the associated repairing techniques may be not practical. For future studies, the realistic fire impact and the system-level structural damage investigation are necessary.

A Study on Self Repairing for Fast Fault Recovery in Digital System by Mimicking Cell

  • Kim, Soke-Hwan;Hur, Chang-Wu
    • Journal of information and communication convergence engineering
    • /
    • v.9 no.5
    • /
    • pp.615-618
    • /
    • 2011
  • Living cells generate the cell cycle or apoptosis, depending on the course will be repeated. If an error occurs during this period of life in order to maintain the cells in the peripheral cells find the error portion. These cellular functions were applied to the system to simulate the circuit. Circuit implementation of the present study was constructed the redundant structure in order to found the error quickly. Self-repairing of digital systems as an advanced form of fault-tolerance has been increasingly receiving attention according as digital systems have been more and more complex and speed-up especially for urgent systems or those working on extreme environments such as deep sea and outer space. Simulating the process of cell differentiation algorithm was confirmed by the FPGA on the counter circuit. If an error occurs on the circuit where the error was quickly locate and repair. In this paper, we propose a novel self-repair architecture for fast and robust fault-recovery that can easily apply to real, complex digital systems. These Self-Repairing Algorithms make it possible for the application digital systems to be alive even though in very noisy and extreme environments.

Fatigue analysis of partly damaged RC slabs repaired with overlaid UHPFRC

  • Deng, Pengru;Kakuma, Ko;Mitamura, Hiroshi;Matsumoto, Takashi
    • Structural Engineering and Mechanics
    • /
    • v.75 no.1
    • /
    • pp.19-32
    • /
    • 2020
  • Due to repetitive traffic loadings and environmental attacks, reinforced concrete (RC) bridge deck slabs are suffering from severe degradation, which makes structural repairing an urgency. In this study, the fatigue performance of an RC bridge deck repairing technique using ultra-high performance fiber reinforcement concrete (UHPFRC) overlay is assessed experimentally with a wheel-type loading set-up as well as analytically based on finite element method (FEM) using a crack bridging degradation concept. In both approaches, an original RC slab is firstly preloaded to achieve a partly damaged RC slab which is then repaired with UHPFRC overlay and reloaded. The results indicate that the developed analytical method can predict the experimental fatigue behaviors including displacement evolutions and crack patterns reasonably well. In addition, as the shear stress in the concrete/UHPFRC interface stays relatively low over the calculations, this interface can be simply simulated as perfect. Moreover, superior to the experiments, the numerical method provides fatigue behaviors of not only the repaired but also the unrepaired RC slabs. Due to the high strengths and cracking resistance of UHPFRC, the repaired slab exhibited a decelerated deterioration rate and an extended fatigue life compared with the unrepaired slab. Therefore, the proposed repairing scheme can afford significant strengthen effects and act as a reference for future practices and engineering applications.

Maintenance Management System for Long-range Planning of Apartment Buildings (공동주택의 장기수선계획을 위한 유지관리시스템)

  • Lee, Jong-Kyoon
    • KIEAE Journal
    • /
    • v.3 no.3
    • /
    • pp.67-74
    • /
    • 2003
  • The repair and maintenance planning is the principal transaction to prevent from the degradation of apartment buildings to prolong their lives. Various building components as part of living area should be maintained properly and timely before critical defects are realized, then the building life might be extended until the limit of its usability. In other words, various building components such as utilities, finishes and structural members are needed to be repaired and replaced in different time interval after completion. To do this systematically, a maintenance management system for Long-Range Planning (LRP) needs developing. The LRP should be figured out based on the forecast of repairing and replacing cycle of building components according to work trades. And the precise forecast of repairing and replacing time of the components helps to enhance the usability of the developed system. The purpose of this paper is to suggest a system with which apartment building managers carry out the tasks of periodical check, diagnosis and replacement of building components based on the maintenance calendar. By using the system, they can easily forecast repairing and replacing time of the components with the consideration of life cycle of building materials and build the LRP.

Structural repairing of damaged reinforced concrete beam-column assemblies with CFRPs

  • Yurdakul, Ozgur;Avsar, Ozgur
    • Structural Engineering and Mechanics
    • /
    • v.54 no.3
    • /
    • pp.521-543
    • /
    • 2015
  • Depending on the damage type as well as the level of damage observed after the earthquake, certain measures should be taken for the damaged buildings. In this study, structural repairing of two different types of damaged RC beam-column assembly by carbon fiber-reinforced polymer sheets is investigated in detail as a member repairing technique. Two types of 1:1 scale test specimens, which represent the exterior RC beam-column connection taken from inflection points of the frame, are utilized. The first specimen is designed according to the current Turkish Earthquake Code, whereas the second one represents a deficient RC beam-column assembly. Both of the specimens were subjected to cyclic quasistatic loading in the laboratory and different levels of structural damage were observed. The first specimen displayed a ductile response with the damage concentrated in the beam. However, in the second specimen, the beam-column joint was severely damaged while the rest of the members did not attain their capacities. Depending on the damage type of the specimens, the damaged members were repaired by CFRP wrapping with different configurations. After testing the repaired specimens, it is found that former capacities of the damaged members were mostly recovered by the application of CFRPs on the damaged members.

SOME EVIDENCE REGARDING REPAIRING, RECOVERY AND OVER-COMPENSATING PROCESSES DURING ONTOGENESIS, AFTERX-RAY-IRRADTATION OF BEAN SEEDS

  • Korosi, F.;Jezierska-Szabo, E.;Laszlo, P.;Felfoldi, J.
    • Korean Journal of Organic Agriculture
    • /
    • v.3 no.1
    • /
    • pp.11-22
    • /
    • 1994
  • Exposing plant organs to high doses of ionizing irradiation, penetrating into the plant tis-sues and cells, along the track structure of particles, lesions, and sublesions are formed on the molecules and organelles. As a result, disorders in the growth and development as well as chlorophyll-deficiency symptoms occur. The time scale of their reparation, recovery and over compensation during ontogenesis, constitutes a question of high theoretical and practical importanced, with special regard to nuclear fallout. With an aim to model the “ut supra”stated phenomena, the seeds of bean, Echo elit licensed variety, were irradiated by 300 Gy dose of X-ray-irradiation (120 kV:4.5 mA). According to the data obtained, the biosynthesis of photosynthetic pigments, will have been completed by the beginning of flowering. In consequence of the overcompensation of the repairing processes, the organs of plants developed from irradiated seeds, showed a partly differing correlative growth, compared to those of control plants. In order to characterize the vivo response of radiation-injured plants, a new method and approach were used. The changes of the electric capacitance of the plants during their ontogenesis, were continously monitored and recorede via a computer-aided and controlled measurement. In view of the data collected in such a way, the repairing plants may respond more quickly and intensively to the changes of environmental factors.

  • PDF

CO2 Evaluation of Reinforced Concrete Column Exposed to Chloride Attack Considering Repair Timing (보수시기를 고려한 염해에 노출된 콘크리트 교각의 탄소량 평가)

  • Kim, Seong-Jun;Kim, Young-Joon;Kwon, Seung-Jun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • In this paper, $CO_2$ amount is evaluated considering repairing timing and unit $CO_2$ amount per repair method including various stage of material manufacturing, moving, and construction. Four mix proportions with mineral admixture are considered and repairing timing/numbers are simulated based on the results from Life 365 which can handle chloride penetration. Furthermore two repair methods (simple cover concrete replacement and replacement with electro-chemical method for removing chloride content) are considered and the related $CO_2$ emissions are evaluated. From the study, the case with high W/B (water to binder ratio) ratio shows smaller $CO_2$ emission in construction stage but it increases more rapidly with increasing number of repair. $CO_2$ emission considering electro-chemical method greatly increases with the increasing unit $CO_2$ for the repairing method. The numbers of jumping step (repairing number) are evaluated to be 9 for WB37-OPC, 18 for WB50-OPC, 4 for WB40-SG, and 7 for WB47-SG respectively. RC structures with the longer maintenance free period are evaluated to be advantageous for saving $CO_2$ emission.

A Study on the Design & Construction Method of Traditional Landscape Space through the 『Imwongyeongjeji』 「Seomyongji」 and the 'Standard Specification for Repairing Cultural Heritages' (『임원경제지』 「섬용지」와 문화재수리 표준시방서를 통해 본 전통조경공간 설계 시공방법)

  • Lee, Jung-Han
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The purpose of this study is to examine the design & construction methods of the traditional landscape space of the past and the repair and maintenance of cultural heritages to maintain it today. To this end, the method of narrative description, process extraction and construction related to traditional landscaping were compared to each other based on the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages'. The results are as follows; First, to analyze at the description methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages' and related processes in the field of traditional landscaping. 『Imwongyeongjeji』 「Seomyongji」 was an encyclopedia of the overall construction method of the living space, describing the location, effect, and advantages and disadvantages of each component and presenting quantitative figures to institutionalize the construction of traditional landscaping spaces. 'Standard Specification for Repairing Cultural Heritages' presented the entire process of repairing cultural heritages, and it is becoming a kind of guide for reference at the site. Among them, foundation construction, roof construction, landscape construction, and fence construction were drawn as items that could be applied to traditional landscaping areas. Second, the traditional landscape space construction method was divided into the processes of foundation construction, roof construction, landscaping construction, and fence construction. Foundation construction is a way of repeating the process of land-tramping. During the construction of the roof, the tile-roofed building was built on top of the rafters and roofed with tiles. And thatched roof was made to a number of rice straws bundles to cover the roof one after the other. Instead of tiles, the stone roof was made of thin and wide stones, and the wooden boards were used for the single roof and the bark roof were constructed with many layers of dried corrugations. Landscape construction mainly consists of the Paving technique through tramping rubble and the construction of terraced flower by planting stone, plants, and shrubs on the top. According to the building materials, the wall construction was derived from the earth-stacked earthen wall, stone walls using stone and clay, marble walls made of tile patterns, and the construction of a board wall using a wood board as a wall. Third, comparing the construction methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages', 『Imwongyeongjeji』 「Seomyongji」 focuses on standardizing the construction methods to create a new traditional space. There is a difference in the setting of the scope of the 『Imwongyeongjeji』 「Seomyongji」 and the construction because 'Standard Specification for Repairing Cultural Heritages' provides the overall construction procedure considering the diversity of the cultural heritages. In addition, the traditional landscape space used to be a residential space in the past, but today, the maintenance process of the already established facilities as designated cultural heritages has been carried out, and construction methods have been added to create viewing conditions. In terms of the succession of traditional knowledge, some similar methods were found in the repair of cultural assets today, and some cases were also confirmed in the reconstruction of traditional technologies such as application of some materials or mix, separation of added facilities and introduction of efficient construction methods.