• Title/Summary/Keyword: repair cycle

Search Result 309, Processing Time 0.029 seconds

A Study on the Establishment of School Repair Cycle (학교시설 수선주기 설정에 관한 연구)

  • Lee, Sang Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.17 no.2
    • /
    • pp.38-47
    • /
    • 2018
  • In Korea, it is difficult to secure student health and safe educational environment due to the rapid deterioration of many school facilities built in the 70s and 80s in the past. As a result, through the improvement of school facilities, social needs for safe schools from various disasters, accidents, Is increasing. The purpose of this study was to establish a standard for the establishment of the national and school facilities for the mid - to long - term plan for the improvement of the old school facilities, and to propose a framework for mid - to long - term and rational planning that can be used by the national and local government offices. The purpose of this study is to establish a mid - and long - term plan for the improvement of old school facilities. The appropriate repair cycle for the improvement of the school facilities set up in this study can be utilized as a standard for the mid - and long - term planning for improvement of the school facilities in the Ministry of Education and the School of Education. To this end, a standard model, It is possible to roughly estimate the overall improvement in the mid- to long-term facilities at the national and regional levels.

Repair of Chromate induced DNA-Protein Crosslinks in Rat Lymphocyte (크롬에 의해 유발된 백서 임파구 DNA-Protein Crosslinks의 복구)

  • Lee, Hun-Jae;Lee, Kwan-Hee;Hong, Yun-Chul
    • Journal of Preventive Medicine and Public Health
    • /
    • v.29 no.3 s.54
    • /
    • pp.597-607
    • /
    • 1996
  • Genotoxic agents can induce various DNA lesions. DNA-Protein Crosslinks(DPCs) were known as the important DNA lesions which could impair gene expression because DPCs had a high probability of resisting repair and persisting through cell cycle. This repair resistance of DPCs could have biological significance but had not been evaluated clearly yet. Most of the studies that have evaluated the repair of DPCs only compared the extent of DPCs repair with other DNA lesions. We injected $K_2CrO_4$, a genotoxic agent, into Sprague-Dawley rats intraperitoneally(5mg/kg) and isolated blood lymphocytes 12 hours later. These lymphocytes were cultured in the mitogen added growth media and mitogen free media separately. The degree of the repair of DPCs was monitored for 4 days by the K-SDS assay. 4 days later, the amount of DPCs decreased by 4.6% in the mitogen added media high increased by 10.9% in the mitogen free media. These results showed that DPCs induced by $K_2CrO_4$ were not repaired easily and the DPCs were biologically significant DNA lesions. We thought the decrease of DPCs in the mitogen added media was not due to the repair of DPCs, but from the increase of normal cell proliferation. Therefore, it is very important to consider the proliferation of normal cells when estimating the repair of DPCs.

  • PDF

Analysis of the Breakdown repair time of the Building Components in Public Rental-Housing Types (공공임대주택 유형별 부재의 사후보전 수선시기 설정연구)

  • Lee, KangHee;Ahn, YoungHan;Chae, ChangU
    • KIEAE Journal
    • /
    • v.13 no.6
    • /
    • pp.129-136
    • /
    • 2013
  • The rental housing has played a key role to supply a decent living space for the low-income households. The owner of the rental housing should maintain and manage the building physical condition. On the other hand, rents should use the housing without any damage and pay a certain fare for the rent. A rent is classified into two types : private and public. The public rent is mainly to supply a living space for non-available home owner with a low-rent fare. Many of public rent are built and supplied by the public institution or local government. The supplier would take a responsibility to maintain the building and components, reflected by the maintenance plan and repair scope. In this paper, it aimed at providing the repair time in building components of the public rental housing such as lighting, electrical cable, paintings and etc.. The repair time is analyzed with three calculation methods which are solved by the probability and empirical approach. Results are as follows : First, the repair time of the electrical facilities are maintained with 11yr, 10yr and 7 in permanent, public and redevelopment rent respectively. The roof proof has a repair time with 14yr, 11yr and 8 in permanent, public and redevelopment rent housing respectively. Second, Most of the components has a prior length of the repair time in permanent, public and redevelopment rent sequently. There is a difference in repair time according to the rental types. Therefore, it would continue to research the difference in aspect of the living style, building physics, living consciousness and etc.

Optimum distribution of steel slit-friction hybrid dampers based on life cycle cost

  • Eldin, Mohamed Nour;Kim, Jaegoo;Kim, Jinkoo
    • Steel and Composite Structures
    • /
    • v.27 no.5
    • /
    • pp.633-646
    • /
    • 2018
  • This study investigated the seismic performance of a hybrid damper composed of a steel slit plate and friction pads, and an optimum retrofit scheme was developed based on life cycle cost. A sample hybrid damper was tested under cyclic loading to confirm its validity as a damping device and to construct its nonlinear analysis model. The effectiveness of the optimum damper distribution schemes was investigated by comparing the seismic fragility and the life cycle costs of the model structure before and after the retrofit. The test results showed that the damper behaved stably throughout the loading history. Numerical analysis results showed that the slit-friction hybrid dampers optimally distributed based on life cycle cost proved to be effective in minimizing the failure probability and the repair cost after earthquakes.

Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost (생애주기비용을 고려한 PSC-I형 교량의 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

A Study on the Service life of the Building Components in the Apartment Housing (공동주택 구성재의 내용년수 산정방법에 관한 연구)

  • Lee Kang-Hee;Chang Jung-Hee;Chae Chang-U
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

OAPR-HOML'1: Optimal automated program repair approach based on hybrid improved grasshopper optimization and opposition learning based artificial neural network

  • MAMATHA, T.;RAMA SUBBA REDDY, B.;BINDU, C SHOBA
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.4
    • /
    • pp.261-273
    • /
    • 2022
  • Over the last decade, the scientific community has been actively developing technologies for automated software bug fixes called Automated Program Repair (APR). Several APR techniques have recently been proposed to effectively address multiple classroom programming errors. However, little attention has been paid to the advances in effective APR techniques for software bugs that are widely occurring during the software life cycle maintenance phase. To further enhance the concept of software testing and debugging, we recommend an optimized automated software repair approach based on hybrid technology (OAPR-HOML'1). The first contribution of the proposed OAPR-HOML'1 technique is to introduce an improved grasshopper optimization (IGO) algorithm for fault location identification in the given test projects. Then, we illustrate an opposition learning based artificial neural network (OL-ANN) technique to select AST node-level transformation schemas to create the sketches which provide automated program repair for those faulty projects. Finally, the OAPR-HOML'1 is evaluated using Defects4J benchmark and the performance is compared with the modern technologies number of bugs fixed, accuracy, precession, recall and F-measure.

The Product Life Cycle Support Initiative Protecting and exploiting your investment in product data

  • Mason, Howard
    • Proceedings of the CALSEC Conference
    • /
    • 2001.02a
    • /
    • pp.499-520
    • /
    • 2001
  • ◈ B2B e-commerce is set to grow significantly in the next 5 years ◈ There is a growing trend towards leveraging the information asset to win new business in the Maintenance, Repair and Overhaul (MRO) market ◈ After-market service is forecast to be a significant element of the B2B market ◈ Existing standards do not fully address the product support requirement ◈ PLCS standards will allow support information to be aligned with the changing product over its entire life cycle ◈ Adoption of PLCS standard will lead to reduced operating costs and increased product availability.(omitted)

  • PDF

k-OUT-OF-n-SYSTEM WITH REPAIR : T-POLICY

  • Krishnamoorthy, A.;Rekha, A.
    • Journal of applied mathematics & informatics
    • /
    • v.8 no.1
    • /
    • pp.199-212
    • /
    • 2001
  • We consider a k-out-of-n system with repair under T-policy. Life time of each component is exponentially distributed with parameter $\lambda$. Server is called to the system after the elapse of T time units since his departure after completion of repair of all failed units in the previous cycle or until accumulation of n-k failed units, whichever occurs first. Service time is assumed to be exponential with rate ${\mu}$. T is also exponentially distributed with parameter ${\alpha}$. System state probabilities in finite time and long run are derived for (i) cold (ii) warm (iii) hot systems. Several characteristics of these systems are obtained. A control problem is also investigated and numerical illustrations are provided. It is proved that the expected profit to the system is concave in ${\alpha}$ and hence global maximum exists.