• Title/Summary/Keyword: repair and rehabilitation cost

Search Result 44, Processing Time 0.027 seconds

Improvement for Asset Management of Sewage Treatment Facilities (하수처리시설 대수선비 자산화 영향분석 및 제도개선 방안)

  • Park, Ha Jin;An, Man Sun;Cho, Nam Ho;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.285-293
    • /
    • 2011
  • Sewage treatment facilities are growing rapidly in quantitatively and qualitatively. However, privatization such as up-size and professionalism, etc. are insufficient, compared to global companies' cases. Infrastructure Asset management has not been applied widely despite of sewage treatment facilities are one of the most critical social infrastructure. Maintenance, repair, and rehabilitation (R&R) practices of sewage treatment facilities have been studied and infrastructures asset management techniques have been applied. Cost model which makes it possible to calculate managerial costs such as major cost, etc. needs to be developed only with project basic information when proceeding new sewage treatment facility construction and management and overseas sewage project. Effects to converse major repair cost into capital, application of sewage treatment facility's asset management, expected effects, etc. were analyzed and suggested an alternative on the improvements of legal system.

Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost (생애주기비용을 고려한 PSC-I형 교량의 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges (불확실성을 고려한 철도 교량의 LCC분석 시스템 개발)

  • Cho, Choong-Yuen;Sun, Jong-Wan;Kim, Lee-Hyeon;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

A Decision-Supporting Model for Rehabilitation of Old Water Distribution Systems

  • Kim, Joong-Hoon;Geem, Zong-Woo;Lee, Hyun-dong;Kim, Seong-Han
    • Korean Journal of Hydrosciences
    • /
    • v.8
    • /
    • pp.31-40
    • /
    • 1997
  • Flow carrying capacity of water distribution systems is getting reduced by deterioration of pipes in the systems. The objective of this paper is to present a managerial decision-making model for the rehabilitation of water distribution systems with a mininum cost. The decisions made by the model also satisfy the requirements for discharge and pressure at demanding nodes in the systems. Replacement cost, pipe break repair cost, and pumping cost are considered in the economic evaluation of the decision along with the break rate and the interest rate to determine the optimal replacement time for each pipe. Then, the hydraulic integrity of the water distribution system is checked for the decision by a pipe network simulator, KYPIPE, if discharge and pressure requirements are satisfied. In case the system does not satisfy the hydraulic requirements, the decision made for the optimal replacement time is revised until the requirments are satisfied. The model is well applied to an existing water distribution system, the Seoul Metropolitan Water Supply System (1st Phase). The results show that the decisions for the replacement time determined by the economic analysis are accepted as optimal and hydraulic integrity of the system is in good condition.

  • PDF

High Performance Fiber Reinforced Cement Composites in Construction Field (건설분야의 섬유강화 시멘트 복합 신재료)

  • Hong, Geon-Ho;Kim, Ki-Soo;Han, Bog-Kyu
    • Composites Research
    • /
    • v.19 no.1
    • /
    • pp.43-48
    • /
    • 2006
  • High performance fiber reinforced cement composites have better performances than traditional cement based materials, therefore, have been expected as new construction applications such as the materials for construction & bridge structure, repair and rehabilitation applications, anti-collapse applications, anti-noise applications etc. However, they have lots of the problems such as material design, fabrication method and structural analysis. Also, the most serious problems of High performance fiber reinforced cement composites have been expensive initial cost, lack of long-term exposure data. As a result, it is needed that the efforts for lowering the initial cost and accumulation of long-term exposure. There has been hardly assessment results of life cycle cost for HPFRCC in construction field, but some papers showed that total life cycle cost could be profitable if the initial cost could be reduced.

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

Reinforced Concrete Slabs with Corroded Bars (철근이 부식된 콘크리트 슬래브의 구조성능 평가에 대한 실험적 연구)

  • Jung, Eun-Chul;Lee, Kyoung-Un;Chung, Lan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.718-723
    • /
    • 2000
  • Corrosion is a world wide problem effecting a large number of structure. Cost of repair and rehabilitation on reinforcement structure damaged by steel corrosion is expensive. But structural capacity on low level corrosion is increased. So this experimental study was performed to know structural performance on reinforced concrete slabs with low level corroded bars. As in the case of test samples, bond stress and structural capacity increases up to 2% corrosion level.

  • PDF

Conceptual Study for Asset Management Framework Construction of Railway Infra Structure System (철도시설물에 대한 자산관리체계수립을 위한 개념 연구)

  • Lee, Jee-Ha;Park, Mi-Yun;Lee, Jong-Kun;Park, Man-Ho;Jung, Dae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2473-2478
    • /
    • 2011
  • The asset management of railway facilities is a total framework for finally supporting a safe and comfortable train service, which includes functions of supporting evaluation of condition and performance of infrastructures, making the decision method of repair or rehabilitation of deteriorated facilities, and lengthening the life cycle of structure through the decision of adequate cost and time of repair or reinforcement. In the range of the asset management, organization, human, the target, and information & data of company are included. Therefore, in this paper, appling the method of asset management analysis to the railway structures, the process of the risk assesment using BRE(Business Risk Exposure) and the basis of consisting optimized renewal decision-making are expressed.

  • PDF